The Bunker Project Overview Zvonko Lazic

Slides:



Advertisements
Similar presentations
ESS Bunker Project Zvonko Lazić September, 2014.
Advertisements

Systems Engineering Management
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Monolith design update – Emphasis on Neutron beam extraction design
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Update on the ESS monolith design Rikard Linander Monolith and Handling Group ESS Target Division TAC 10, Lund, Nov 5,
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Project Execution Methodology
Roadmap for triplet cryostats
Transition Implementation Status Reporting
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Flooding Walkdown Guidance
Francesco Forti University and INFN, Pisa
2K CB FDR Overview:  Agenda, Charge, Review Process
SmartMeterTM Steering Committee Update – September 2012
SmartMeterTM Steering Committee Update – March 2013
This Presentation Pack is brought to you by
SmartMeterTM Steering Committee Update – June 2012
Welcome & Charge for the Meeting
Exit Capacity Substitution and Revision
SmartMeterTM Steering Committee Update – July 2012
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec ITEM 1 ITEM 2 ITEM 3
ESS Project Status Roland Garoby – Technical Director August 2018.
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
Operations, Risks & Hazards
DSC ChMC CSS Consequential Update 13th March 2019
Ciprian Plostinar Workshop on Testing and Commissioning
Change Management Committee – Retail & Networks Update
The Bunker Project Overview Zvonko Lazic
Remote Handling Workshop Introduction
MULTISPORTS CENTRE PRESENTATION
Roof design Bunker Project CDR
Basics for Bunker Installation Schedule Bunker CDR 2.0
Bunker Internal Review Welcome & Charge
Ctclink executive leadership committee May 31, 2018
Senad Kudumovic Design engineer
Imaging & Engineering STAP Meeting 12th-13th of April 2018
The Mechanical Engineering & Technology (MET)
IKON 15 Talal Osman & Iain Sutton
The Bunker Steel Structure – Structural Analysis
Preliminary Hazard Analysis of Bunker
Neutron guide Shielding Concept
Technical Documentation Coordinator
Actions List.
Bunker Wall Design Wall
Bunker -Target interfaces
Bunker Project Schedule/Budget
Bunker Wall Design Wall ESS
Welcome Update on ESS Construction Project
Radwaste: status & way forward
Technical Updates Gábor László NSS Lead Instrument Engineer
NSS integrated installation plan workshop Introduction
Bunker Project Operation aspects
Bunker Project Schedule/Budget
Spectroscopy STAP Meeting ESS, 8th of April 2019
Licensing update ESHAC #7, October 2017
Imaging & Engineering Diffraction STAP Meeting ESS, 21th of March 2019
Update on ESS Construction Project Charge to the SANS STAP
Bunker Project Integration/Interfaces
Test Beamline System Requirements and Charge to PDR Committee
Shielding requirements for the baseline bunker shielding (current CATIA version ) Günter Muhrer
Charge and Agenda of the 18th TAC meeting
Bunker Project Interfaces introduction
SNS-PPU upgrades the existing accelerator structure
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

The Bunker Project Overview Zvonko Lazic www.europeanspallationsource.se 05 December 2017

The bunker - content Introduction Overview Design status Schedule status Neutronics status

The Bunker Review - Introduction Critical Design Review Charge The Review is divided in four distinct section Project Introduction/Background Design Description Integration/Operation/Safety Procurement/schedule/V&V

The Bunker - Overview PDR Dec.’16 Internal Review June ‘17 CDR Dec.’17 Purchasing strategy has been defined. - Prequalification tender has been released, closing Dec.’18 - Place purchase order Q1.’18 The projected cost has been revised to reflect feedback from the industry and potential supliers. Overall schedule is planned in accordance with the current ESS baseline.

The Bunker – PDR Dec.’16 feedback Specific Recommendations Document stability of roof with missing cross members and double stacked roof blocks (e.g., during installation / maintenance activities). Document and verify load cases for intermediate stages of roof stacking / unstacking. Complete and extend analyses of streaming gaps to include not only dose rates (high level requirement 3) but also high energy hadron fluxes (high level requirement 4).   General Recommendations Eliminate door access to the bunker, including the associated PSS components, lighting, etc. This needs to happen, or be firmly dismissed, prior to beginning detailed design. Redesign the semi-permanent beam above the light shutters to give more of a chicane to block an identified radiological streaming problem. This can take place as part of detailed design. Install all beam-line base plates, especially in the forward section of the bunker, prior to beam on target and installation of the bunker walls. This decision should be made prior to initiating detailed design. Consider a “can” design for the steel and PBC laminate used in the bunker walls and roof. Such a decision would need to be made early in the detailed design process. Ensure competitive bids for bunker materials and construction (nominally outside this committee’s purview).

The Bunker – IR Jun.’17 feedback (ESS-0123255) Charge notes The full weight of the bunker is to be in place before instrument installation. This requirement is not satisfied by the current plan. The design solution adopted to fulfil the structural decoupling and behaviour in seismic event requires justification . The cost estimate is incomplete, missing a number of key items. A detailed and justified full costing to completion needs to be developed and supported with more robust inputs (for example design, manufacturing and assembly activities are not included). Comments Integrated Schedule to be updated. Procurement strategy and schedule needs to be completed. In case for “Open Book” contract it may be much easier to have information exchange, and decision of CDR may have a certain flexibility in a post change, resulting in a reduction of schedule risk. Although there are several preceding documents, additional documents are to be developed on verification (ESS-0060210), integration plan, operation and maintenance manual(ESS-003688) and configuration management plan (ESS-0068713) . Management of dilatation joint and shielding performances. Gap streaming. The results on the streaming through the roof from the dilatation gap are preliminary but much more encouraging, if the gap is reduced from the unnecessary(? ZLa) constraint of 6.5cm.. Diagonal braces. It seems to be unclear at this point if the diagonal braces of the bunker structure would interfere with the instrument components. Their placement needs to be well communicated to the instrument teams and any clashes resolved quickly. Load requirement on the CF floor in D01/D03. Ola Jovall at CF BLT will forward a CF RFI “ Bunker Load specifications” to the Bunker team to be returned to COWI by the 11th July 2017

The bunker – Design status ~ 7000t of steel ~ 300t of Borated HDPE ~ 750t of virgin HDPE/LDPE ~ 620t of concrete ~ 970t of heavy concrete ~200t of construction steel Each bunker side measures approx. 40m long x 26m wide x 5m high ~ 10,000 tones total mass ~1400 wall & roof blocks

The bunker – Design status Frame and roof position 1700 TCS-to-bottom of the roof 1500 TCS-to-bottom of the frame TCS

The bunker – Design status SUPPORT FRAME The bunker frame has to: Support the roof load; Sustain seismic loads (up to H4); Allow easy disassembly; Ensure that blocks stacked on top, fit; Ensure repeatability of stacking/unstacking of blocks;

The bunker – Design status WALLS The bunker walls function is to: Shield (from radiation); Support (roof above); Integrate (beam feed-throughs);

The bunker – Design status ROOF The bunker roof function is to: Shield (from radiation); It also has to allow for: Reasonably fast access into the bunker cavity; Ability to unstack and stack blocks repeatedly;

The bunker – Design status ROOF The bunker roof is made out of blocks; The blocks are arranged in 3 overlapping levels; Lifting times depend on the particular point of entry;

High level Bunker manufacturing and Installation Schedule Sofie O. R6 (Jan 2019) Critical Design Review                                                           Dec 2017 Contract for manufacturing                                                 Q1 2018 First Delivery to ESS site (R6 & steel sructure)                 Dec 2018 Mid delivery to ESS site (wall blocks & first roof layer)  June 2019 Final delivery to ESS site (final roof layer)                         July 2020 LS & Insert (with Target) installation (Feb-Sep 2019) Bunker Pillars & Beams (June-Oct 2019) Bunker walls & first roof layer (Aug-Nov 2019) Instrument & TBL installation (Nov 2019 – May 2020 ) Bunker roof outer layer (June-Aug 2020) Utilities/Infrastr. & ICS installation & test (Sep-Oct 2020) Beam on Target Oct 2020 First neutron instruments planning for “In-Bunker” installation within this 6 month period. Installations assumes normal working hours and summer/Christmas holidays

High level Bunker manufacturing and Installation Schedule Sofie O. 2018 2019 2020 Q1 Q2 Q3 Q4 Procur. Colab. setup Production Frame Roof elements and subassemblies Wall elements and subassemblies Temporary shielding Installation Predrilling LOGISTICS Frame and base plates Walls Roof Utilities PSS

Predicted dose rate emitted from ‘as designed’ bunker roof Inner Zone Intermediate Zone Bunker 0.1 0.03 Dose map adapted from Reference: ESS-0114728 (Ansell & Di Julio 15 Sept 2017)

The Bunker Overview Outlook Mechanical Design – fully completed; while maintaining VE effort. We are presenting the mechanical design in models only; detailing (drawings) will be performed by the supplier (manufacturer). Physics – Change in the bunker material composition meant a fresh (updated) battery of analyses needed to be done. Continuous VE efforts also introduce additional and longer workload. The outlook is good provided we conclude all VE effort by the time the ‘metal is cut’. Documentation – Following ramp up in resources addressing this body of work, we are completing the documentation bundle. Purchasing/schedule – The purchasing strategy is set, the Integrated schedule has been updated. It is clear that there is a high risk of delays due to high degree of interdependencies between different projects working on the same (building) area.

The Bunker Overview Q/A End of presentation Q/A