Illinois Department of Nuclear Safety

Slides:



Advertisements
Similar presentations
21M062007D The Shaw Group Inc. ® An Analytical Screening Technique to Estimate the Effect of Cooling Ponds on Meteorological Measurements – A Case Study.
Advertisements

Training Guide. `
CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Carbon 14 Gaseous Effluent Dose The importance of Human Performance Ron Chrzanowski Corporate Chemistry Manager Exelon Nuclear June 27, 2011.
RETS-REMP WORKSHOP June 25, 2012 Greg Jones R. E. Ginna Nuclear Power Plant Constellation Energy Nuclear Group, LLC 1.
14th Annual RETS/REMP Workshop June 28-30, 2004 U.S. Nuclear Power Sister Plant Radiological Effluent Release Comparisons J.T. Harris 1,3, D.W. Miller.
HPT Rev. 2 Page 1 of 17 TP-1 ACADs (08-006) Covered Keywords History, post-accident sample, containment air, three mile island, NUREG 0578, NUREG.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Temporal Comparison of Atmospheric Stability Classification Methods
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
Implications of Tritium Dose Conversion Factors in Deriving Regulatory Limits for Drinking Water and Effluent Compliance Ken Sejkora Entergy Nuclear Northeast.
Modeling boiling water reactor main steam isolation valve leakage using MELCOR Presented at the 21 st Annual Regulatory Information Conference March 10-12,
Weather and X/Q 1 Impact Of Weather Changes On TVA Nuclear Plant Chi/Q (  /Q) Kenneth G. Wastrack Doyle E. Pittman Jennifer M. Call Tennessee Valley Authority.
ISTOG MOV TESTING TRANSITION Prepared by: E. Cavey DTE-Fermi 2 Page 1 The GOAL of this effort was to develop implementation guidance for ASME Code Case.
The State of the ODCM 2004 RETS/REMP Workshop Jim Key Key Solutions, Inc.
Safety at ESS. Thomas Hansson Nuclear Safety Engineer at ESS, since November 2011 Experience from Swedish Nuclear Power Plants since 1991 (Mainly Fuel.
Using ARCON96 for Control Room Radiological Habitability Assessments
Environmental Health and Safety Radiation Control and Radiological Services.
OEC Webinar on Nuclear Safety New Airborne Dispersion Modeling and Its Impact on Safety Basis Documentation at a DOE Waste Handling and Processing Facility.
DO NOW: The highs and lows of a fluctuating stock price are hard to predict. As a new stock trader, have you found it difficult to “time the market?” For.
AL-QADISIYIA UNIVERSITY COLLEGE OF ENGINEERING SELF ASSESSMENT REPORT Submitted by SAR committee.
Investigation of Meteorological Tower Siting Criteria Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented at the 15 th Annual RETS-REMP Workshop.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Training Session Product File Notes and Registration Reports, 23 October Registration Report: General aspects M. Trybou Federal Public Service of.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Derivation of Dose-Based Detection Limits for Drinking Water and Effluent Compliance Ken Sejkora Entergy Nuclear Northeast – Pilgrim Station Presented.
PROTECTFP PROTECT Questionnaire Responses Jo Hingston.
Nuclear Power Regulatory Overview The Keys To Our Success By Bob Wills RRPT GEL Laboratories, LLC.
The “Nature of Science”
1 American Society of Quality September 20, 2005 Presented by Linda Smith USNRC Region IV.
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
Regulatory Framework for Uranium Production Facilities in the U.S.
REMP Reports Improvements?. Why? Why now?  NRC/Public Interest (plant life extension, new plants, Fukushima)  Differences at various sites (Millstone,
1 NEI Process Discussion. 2 Topics for Discussion Relationship to NFPA 805 Relationship to Regulatory Guide Technical Process currently in NEI
Introduction to a Safe Workplace
Comparison of the AEOLUS3 Atmospheric Dispersion Computer Code with NRC Codes PAVAN and XOQDOQ 13th NUMUG Conference, October 2009, San Francisco, CA.
Engineering Economic Analysis - 9th Edition Newnan/Eschenbach/Lavelle Copyright 2004 by Oxford University Press, Inc.1 Engineering Economic Analysis 9th.
SAD/ASE Lessons Learned A Safety Re-Assessment at Jefferson Lab in Accordance with DOE-O-420.2B Phil Mutton August 13, 2008.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
PRACTICAL USER TIPS FOR ARCON96 10 TH NUMUG MEETING Wilmington, NC June 2005 By Y. J. Lin Bechtel Power Corporation Frederick Maryland.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
Welcome Descriptive vs. Quantitative Risk Assessment of Genotoxic Carcinogens 2 nd April 2009.
1 EVALUATING DIVERSITY IN DIGITAL I&C SAFETY SYSTEM DESIGNS Michael E. Waterman Digital Instrumentation and Controls Branch Division of Engineering Office.
NUMUG - Oct Atmospheric Stability – Methods & Measurements Robert F. Yewdall PSEG Nuclear LLC.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Proposed Fire Risk Meter Workshop Information IAEA Workshop.
Ashley Finan, 2006 Page 1 Nuclear Energy and Oil Sands? Ashley Finan Massachusetts Institute of Technology Department of Nuclear Science & Engineering.
Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.
1. 2 How to Read and “Right” a Causal Factors Analysis Report ISM Workshop – Feedback and Improvement Session B-2 Richard S. Hartley, Ph.D., P.E. November.
Energy Auditing – Energy Conservation and Efficiency Measures PRESENTER Mr. A. Hamukale BENG, Meng,MBA,PEEIZ,REng.
Various Methodologies for Calculating the Impacts on Delta-T From Independent Spent Fuel Storage Installations (ISFSI) Jim Holian and Steve Mirsky, SAIC.
Planning for Sustainability 1 Susan Ramsey Pearls of Wisdom Consulting Lia Katz ASTHO (202)
Safety of At-Reactor High-Density Storage of Fuel in Pools Steve Jones Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission International.
Abstract A step-wise or ‘tiered’ approach has been used as a rational procedure to conduct environmental risk assessments in many disciplines. The Technical.
On-site Storage of Spent Nuclear Fuel in the United States
EPRI Comments Re: NRC “Low-Level Radioactive Waste Disposal”
Lisa Edwards Sr. Program Manager LLW Forum April 13-14, 2016
Recent Developments Regarding Control Room Habitability Assessment
Professor Mahesh Pandey Institute of Risk Research and
International Topical Conferences on Nuclear Safety, IAEA, June 6-9, 2017, Vienna Workshop 2: An Introduction and Further Explanation on Design Extension.
The ORR/RA and the Authorization Basis May 2005 Revision
Implementation of the Revised Branch Technical Position on Concentration Averaging and Encapsulation A. Christianne Ridge Division of Decommissioning,
Document Evaluation Process May 2005 Revision
Lab Roles and Lab Report
Modeling Iodine Released During a Nuclear Power Plant Accident
Robert Kahler Branch Chief
U.S. Nuclear Regulatory Commission Radiation Safety Standards
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
IAEA – Safety Demonstration of Advanced Water Cooled Nuclear Power Plants Session: Digital I&C Systems Topic: Defence in Depth & Diversity – Challenges.
Presentation transcript:

Illinois Department of Nuclear Safety GOOD SCIENCE VS UNCERTAIN REGULATORY GUIDANCE OR HOW CHI/Q AFFECTS NUCLEAR SAFETY Ken Evans Illinois Department of Nuclear Safety 1035 Outer Park Drive Springfield, Illinois 62704 217-558-0499 evans@idns.state.il.us

Introduction X/Q Calculations used to be simple As a result of tracer studies more realistic models were developed Regulatory Guidance has not always followed the best science

Development of ARCON-96 Regulatory Guide 1.145 recognized the existence of plume meander and building wake There was no attempt to develop an accurate model of these two terms NUREG/CR-5055 was a first attempt to develop a more realistic model ARCON-95 was the first realistic model to predict the effects of plume meander and building wake.

ARCON-96’s Results The results of the new X/Q are spelled in on page 44 of ARCON-96 “…there are numerous instances where ARCON-96 predicts concentrations that are more than a factor of 10 lower than the Murphy-Campe model predictions.”

The Source Term Issue NUREG-1465 Published in 1995 It received much attention because source terms were known to be overly conservative. Conservatism in X/Q’s not as well understood

Clinton’s RAST Team Clinton Power Station decided to form a team to evaluate the new source term. The Revised Accident Source Term (RAST) team’s mission was to look for economic benefits. The RAST Team also evaluated the effect of ARCON-95

First Case The timing aspects of the new source term only were used. Other aspects of the new source term such as chemical species and accident analysis were more difficult to calculate. In 1996 it was not clear what methodology the NRC would approve for revised design basis calculations.

Results For Timing Only Reduction in dose less than a factor of 2. Did not produce enough benefit to pursue further.

New X/Q Case Take credit for Suppression Pool Scrubbing Calculate new X/Qs using ARCON-95 Use current Reg Guide 1.3 Source Term Results Approximately a factor of 10 reduction

Control Room X/Q The Clinton calculations for Control Room were reduced by a factor of 4 for occupancy. The new guidance in DG-1111 allows a factor of 10 for Clinton’s design of air intakes.

Reg Guide 1.183 Reg Guide 1.183 provides guidance on use of new source term It is silent on use of ARCON-96 for other than control room dose Defense in Depth must be maintained, i.e charcoal trains can not be eliminated.

SUMMARY AND CONCLUSIONS ARCON-96 as well as the NUREG 1465 Source Term result in lower dose when performing design basis calculations. The design of nuclear plants has been based on conservative analysis The regulatory dilemma becomes recognizing improvements in the science without obviating the required safety systems that are now in place.