Friday morning 08:00 Stable beams with 840b.

Slides:



Advertisements
Similar presentations
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Advertisements

:30 meetingEBH 1  7:53 start VdM scans LHCb  8:18 beam dump: RF M2B1 crowbar (3 rd time within 24 hours)  Access for RF  Changed thyratron.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Friday 15th June 01:11 Injection.
Wednesday September 14th
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Tue :25 Beams dumped due to RF vacuum interlock
Saturday 12:00 Fill 1992 in stable beams.
LHC Morning Meeting - G. Arduini
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Scrubbing progress - 09/12/2012
Friday 31st August & night
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Mike Lamont, Jorg Wenninger
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Monday Morning – recovery from cryo.
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
Friday Morning 7:30 injection for fill 2908
Sunday
Programme for VDM measurements Friday Oct 15
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Sunday/Monday & :30 Stable beams. Fill #1851.
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Tuesday morning 08:30-09:00 Squeeze with probe.
Tue/Wed 12/ :00 Probe beam back again
Thursday 26th July 13:21 Fill 2880 beam dumped
Friday 07:00 Fill 1729 dumped. Movement device allowed flag switching to FALSE. From the logs, it seems the energy went to FFFF/7860 GeV. To be confirmed.
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
LHC Status Fro Morning 9-Sep
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Saturday 26 November 2011.
Tuesday
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Tuesday
Presentation transcript:

Friday morning 08:00 Stable beams with 840b. Nice smooth cycle. 08:15 Losing on non-colliding (and no LR) bunches when trimming down the octupoles. Had to back off in octupole current to stabilize. Sign that we should avoid bunches without head-on in IR1/5 in the filling schemes. 6/8/2019 LHC 8:30 meeting

Friday continued 09:40 Beam dump, trip of RCBXH3.R1. No faults, reset and go. 10:20 Lost cryo in S78 due to DFB levels. Unfortunate error while reconnecting the distribution between heat shields. An interlock was left unmasked, and an interlock triggered, closing valves on the 4.5K distribution line. In the context of decoupling S78 and S81. Some accesses (LHCb, CMS) during cryo recovery. Collimator T sensor on TCSG_4R6_B1_TTRU with strange reading disabled (1 out of 4). 15:30 Cryo S78 is back. 6/8/2019 LHC 8:30 meeting

Friday afternoon 17:00 Filling with standard schema, 1.4E11 p/b, as far as vacuum allows. Had to stop at 726 bunches, vacuum in interconnection > 1E-8. 6/8/2019 LHC 8:30 meeting

Friday afternoon 18:40 Stable beams, fill 3109, L ~3E33 cm-2s-1, 726b. Smooth, a few poor quality batches made it through (we had a some issues with PS bunch length) – reflected in losses. 21:40 Start of ATLAS VdM scans. 23:10 Beam dump – lost cryo sector 78 due to communication with vacuum. 6/8/2019 LHC 8:30 meeting

Evening 00:00++ Access LHCb. Followed by CMS. Then vacuum for PLC restart. 00:50 No more logging of some systems (LHC BI) – server hardware failure. 03:30 End of access. Pre-cycle. 04:30 Injection – 1374 bunches @ 1.4E11 !! 6/8/2019 LHC 8:30 meeting

Morning 05:00 Server for logging repaired. 05:40 Lost BCT information. 06:30 Stable beams fill 3110, L ~ 5.3E33 cm-2s-1. Lumi optimization by hand, as FBCT down (should not be like that…). LHCb leveling does not work as no Xing plane scan done  manual forcing by Richard. 07:10 Beam dump – electrical glitch affecting S78 and S81. Apparently related to the UPS. 6/8/2019 LHC 8:30 meeting