Hector Novella Deputy project manager

Slides:



Advertisements
Similar presentations
Software Quality Assurance Plan
Advertisements

ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
CS 360 Lecture 3.  The software process is a structured set of activities required to develop a software system.  Fundamental Assumption:  Good software.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Smart Home Technologies
Neutron Chopper Technologies Work Package
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Software Development Process CS 360 Lecture 3. Software Process The software process is a structured set of activities required to develop a software.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
Responses to recommendations of TAC 11 Integrated Control Systems Henrik Carling ESS/ICS Date:
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ESS Machine protection review Welcome Henrik Carling ESS/ICS Date:
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Rob Connatser NSS Instrument Work Packages and XLPM.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
Agenda ESS Schedule Objectives and Current status Overview/Introduction Tools and Process ESS integrated master schedule Milestones.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
ESS Timing System Plans Timo Korhonen Chief Engineer, Integrated Control System Division Nov.27, 2014.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
1. WELCOME Project Management Cycle (P.M.C.) What is a project? : What is project management?: Project management life cycle : Phase 1 st : Phase 2 nd.
Status of Integrated Control Systems
CMGT 410 aid Education Begins/cmgt410aid.com
The Work Breakdown Structure and Project Estimation
Work Breakdown Structure (WBS)
Supportability Design Considerations
Project Management Systems
Making Difficult Decisions in a Transparent Way –
(Selected) Project Management Processes at the XFEL
For University Use Only
Project Management Lifecycle Phases
Work Breakdown Structure (WBS)
IEEE Std 1074: Standard for Software Lifecycle
Software Project Planning &
CMGT 410 Possible Is Everything/snaptutorial.com
CMGT 410 Education for Service-- snaptutorial.com.
CMGT 410 Teaching Effectively-- snaptutorial.com.
ENGINEERING MANAGEMENT (GE 404)
John D. McGregor Session 4 Requirements V & V - continued
Methodologies For Systems Analysis.
ENGINEERING MANAGEMENT (GE 404)
Management Breakout: MREFC Budget Summary Victor L
Software life cycle models
ARB Schedule Locations
ICS update 7th Experiment Control Workshop
Bunker Internal Review Welcome & Charge
Testing Coordination at ESS
PSS verification and validation
Safety Readiness Review (SRR) Thomas Hansson, ESH
NSS integrated installation plan workshop Introduction
Machine Protection PLC Based System Verification and Validation Plan
Licensing update ESHAC #7, October 2017
Lessons from the 1st Safety Readiness Review
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Agenda Integration services framework
Information system analysis and design
Presentation transcript:

Hector Novella Deputy project manager TAC 13 Parallel Sessions - Integrated Control System ICS project replanning Hector Novella Deputy project manager www.europeanspallationsource.se 2016-04

ICS project replanning TAC 13 Outline ICS planning process ICS planning implementation ICS planning status 2016-04-07

ICS project replanning TAC 13 Outline ICS planning process Boundaries Scheduling process System life cycle stages and milestones Top level scope decomposition ICS planning implementation ICS planning status 2016-04-07

ICS planning process Foundations Based on ESS Process for Planning (ESS-0019598) Conformant with ISO/IEC 15288 (Systems Engineering) Approach taken: ICS construction planning is Schedule oriented (vs Cost) and Time oriented (vs Resource). Top-down approach for most of the plan, with some refinements bottom-up. Rolling out detail in stages. One plan (work packages or work units are integrated). Automated scheduling (supported by Primavera et al.). Deliverable or Milestone-focused (seeking robustness to uncertainties) Deliverable or Milestone-focused. Seeking robustness to uncertainties (scope adaptation to meet time and budget) 2016-04-07

Boundaries ICS planning process Fixed budget for ICS. 50% cash, 50% IKC. ICS budget may be distributed among Work Packages according to ICS criteria. ESS Integrated Master Schedule is our reference to report on the same milestones. ESS top level requirements for reliability and availability set the quality level of ICS deliverables. 2016-04-07

Scheduling process ICS planning process Plan from the top down Start thinking about the overall project deliverables Break down into greater detail Add tasks and milestones Outlining deliverables and activities (in a measurable way) Timescale in relation to detail Key milestones at key decision points Enter work against tasks Best-guess (“duration” in exceptional cases; “work” = ManMonth) Large-duration: rolling wave / estimated (late tasks) Link related tasks together (logical sequence) Benefit from L1, L1b, L2, L2b milestones Resource load the schedule IKC, personnel, services (consulting, travel, etc.) Milestone levels: L1: ESS Project 0 L1b: Shared among divisions L2: ICS Project 14 relevant L2b: Shared among Work Packages 2016-04-07

System life cycle stages and milestones ICS planning process ISO/IEC-15288 Systems Engineering. When no other external milestone applies. Phase (system stages) Milestone (end of phase) …   Requirements SRR: System Requirements Review Design PDR: Preliminary Design Review CDR: Critical Design Review Development (from design to complete system) TRR: Test Readiness Review Integration and Test (conformance to requirements) SAR: System Acceptance Review Production (system into operation, resolve problems from Integration and Test) ORR: Operational Readiness Review Operation & Maintenance (yearly? maintenance review) Disposal Construction Phase Initial Ops Operations Phase 2016-04-07

Top level scope decomposition ICS planning process Work package 01 Management and administration Work package 06 Equipment Work package 07 Control system infrastructure Work package 09 Personnel safety systems Work package 05 Machine protection Work package 03 Software core Work package 02 Software Applications Work package 08 Physics Work package 04 Hardware core Work package 14 Test Stands Work package 13 Integration - Conventional facilities Work package 10 Integration - Accelerator Work package 11 Integration - Target Work package 12 Integration - Instruments Work package 20 Installation 2016-04-07

ICS project replanning TAC 13 Outline ICS planning process ICS planning implementation Rationale under ICS planning Graphical example PSS correlated overview MP correlated overview CS integration correlated overview Beam on Target challenges High level schedule – Project ICS ICS planning status Further ToDo:s 2016-04-07

ICS planning implementation Overview input ICS Project Charter* ICS Concept output ICS Planning ICS Requirements* ICS Schedule* ICS Project Mgmt Plan** * Ongoing ** Pending 2016-04-07

Rationale under ICS planning ICS planning implementation To help seeing the relation of ICS activities with the rest of ESS systems, we can categorize them according to what is needed to switch-on the Machine. ICS critical activities are: PSS (Personnel Safety System) MPS (Machine Protection System) integration CS (Control System) integration ICS enabling activities are: Software core systems CS development Hardware core systems Infrastructure ICS complementing activities are: Operations oriented applications Physics oriented applications This will give us an idea of prioritization. High Dependencies on other Division’s specifications Minimum Viable Product to guarantee Beam on Target for ICS activities 2016-04-07

Beam on Target challenges ICS planning implementation Under ICS perspective, BoT milestone implies some constraints: PSS, MPS and control systems integration are a must. The scope for BoT is directly related to the effort needed in ICS. We believe that a scope of Low Power Beam on Target without instruments is still feasible and compatible with today’s ICS plans. After that BoT, a transient period with iterative extension will be needed to: Accommodate to a High Power Beam and Operational Modes. Accommodate new Neutron Scattering Systems. For the future success of ESS as a research facility, Operator Applications and Physics Oriented Applications is a must and requires continuous activity. Just READ 2016-04-07

High Level Schedule – Project ICS ICS planning implementation 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 Global & Project MS First Installations Handover Completed First Beam on Target #1: Isrc+LEBT WP Integrations Controls ready for integrated testing #1 #2 #3 #4 #5 #6 #2: +RFQ+MEBT #3: +DTL1 In this presentation, skip this fast. #4: +DTL2-4 #5: +NCFE+... to DUMP NMX controls ready for cold commissioning 1st Bldg integration complete #6: to TARGET WP Personnel Safety Accelerator PSS-1 Accelerator PSS-2 complete Target PSS complete WP Machine Protection Beam Interlock System installation started Beam Interlock System ready for High power beam commissioning WP SW, HW & Infrastructure Timing system components ready for procurement Temporary control room operational 2016-04-07

ICS project replanning TAC 13 Outline ICS planning process ICS planning implementation ICS planning status Project Plan Optimization Conclusions 2016-04-07

ICS planning status Overview WP Title Work package manager Status Artefacts In P6 01 Administration Henrik Carling Done 75 02 Software Applications Leandro Fernandez Ongoing 03 Software Core Susanne Regnell 04 Hardware core Timo Korhonen 05 Machine protection system Annika Nordt 260 06 Equipment Not applicable 07 Control system infrastructure Remy Mudingay 160 08 Physics Garry Trahern 150 09 Personnel safety system Stuart Birch 250 10 Integration accelerator Han Lee 11 Integration target Benedetto Gallese 275 12 Integration NSS David Brodrick 13 Integration CF Nick Levchenko 610 14 Test stands Daniel Piso Pending 20 Installation Achievements: Beginning to have a hierarchy of milestones. Raised internal awareness of the importance of consistency in the plan (EVM reports) Some WP are now better oriented towards deliverable products and/or review milestones. Making them more robust to uncertainties. Unfortunately, not everything that I would like is done.  For example: We still lack comprehensive milestones inside the WP:s. We still lack a clear view of our scope of work, reflected in deliverables traceable in the plan. Everything takes time and not everything is yet in the MS Projects: I still need to synchronize some data from P6 (it is not so straightforward). I still need to update some MS Projects with data from the Excel files we were working up until now. Then I would like to define L2 (ICS level), L2b (between ICS WPs) and L3 (inside a WP) milestones. I would also like to include the Deliverables for each WP. Finally, I would like to simplify the way the activities are expressed, to make our monthly reports more consistent and predictable. (with the use of milestones and deliverable linkage). Main missing element: Traceable list of deliverables. 2016-04-07

Project plan optimization ICS planning status 2016-04-07

Conclusions ICS planning status The previous slides show part of the work done during the last 4 months. ICS construction cost estimates do not include all research and development costs from other areas/labs that are needed to support ICS. Furthermore, since significant R&D activities to support ICS remain to be completed and technical uncertainties persist, the cost of ICS could grow and completion could take longer. To avoid cost increases and schedule delays ICS is trying to improve on management and oversight. With emphasis on having an integrated management team. Independent reviews are expected to be effective on examining both the construction project and its supporting external activities (R&D, IKC). Focus on (1) planning for the complexities associated with assembling and installing the linac controls along with the target and instrument controls in stages, and (2) refining the cost estimations as soon as new data is disclosed. Supported on more systems engineering focus within ICS work package managers; in order to better identify the full scope of ICS and realistically estimate the project’s engineering complexities. Project management decisions could be affected by unrealistic budgets (IKC) or the fast-track construction strategy imposing substantial cost pressures. 2016-04-07