Discussion on MERIT Cryogenics Specifications

Slides:



Advertisements
Similar presentations
Mar 13, Low-energy RHIC electron Cooler (LEReC) CRYOGENICS Mar 13, 2014.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
MERIT Review Meeting: Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug CERN Cryogenics for Experiments Accelerator Technology Department Presented by Adrian.
CERN P186 Magnet cryogenic system update Yury Ivanyushenkov RAL December 7, 2004.
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Hydrogen system R&D. R&D programme – general points Hydrogen absorber system incorporates 2 novel aspects Hydrogen storage using a hydride bed Hydrogen.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
R. Than J. Huang P. Orfin T. Tallerico Jan. 19, 2011
Exhaust to atmosphere G1 V1 V2 V3 LN2 Storage Vessel 150 l Dewar Cryostat Exhaust to atmosphere Nitrogen or helium gas bottle LN2 Circuit for MIT Test,
Johan Bremer, 22th-26th September 2008 Cryogenics Operations 2008, CERN, Geneva, Switzerland 1 CRYOGENICS OPERATIONS 2008 Organized by CERN Safety aspects.
To TT10 Nitrogen or helium gas LN2 Storage vessel buffer storage vessel G1G2 Magnet cryostat VALVE BOX Schematic diagram of the cryogenic system.
Restoring Komag Yasuhiro Makida Consideration of restoring and modifying Komag for a stand alone operation without the refrigerator. Contents 1.Magnet.
Installation of the T600 at Fermilab CSN2, September 22,
Reviewers report of the LHCb C0 2 cooling EDR EDR date: 3 rd of December January
Cryogenic Cooling Schemes for the SPL U. Wagner TE-CRG.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
LCLS-II Prototype Cryomodule Vacuum Vessel and HGRP Tom Peterson 4 December 2014 Design Review.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
AT-ECR/C.FabreMay 31, 2007 Cryogenics for Liquid Argon Calorimeters Caroline Fabre on behalf of the ATLAS Liquid Argon Cryogenics Collaboration.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
ProtoDUNEs Interface documents (NP-02, NP-04) David Montanari (on behalf of Redouan A, Mark A, Johan B, Michel C, Joaquim C, Aurelien D, Kevin H) Apr 14,
WA105 6x6x6 Cryogenics David Montanari / Johan Bremer Sep 21, 2015 Rev. 1.
ProtoDUNE Single Phase (NP-04) P&ID David Montanari (on behalf of Mark A, Johan B, Michel C, Joaquim C, Kevin H) CERN Neutrino Platform General Meeting.
R. van Weelderen and U. Wagner CERN
Final Design Cryogenic and mechanical configurations
R. Panchal, GLN Srikanth, K. Patel, P. Shah, P. Panchal,
IBBelle: Status & Plans
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973
Magnet cryogenic system update.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
IT-4189 Supply and installation of a cryogenic distribution system
at STFC Daresbury laboratory
Proximity Cryogenics P&IDs Meeting
MERcury Intense Experiment Experiment Layout
Cryogenic behavior of the cryogenic system
MICE Meeting at RAL, Oct-23, 2005
Proximity Cryogenics P&IDs meeting
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Teleconference ACS – FREIA 10th May 2017
LARP Vertical Test Facility
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
Teleconference ACS – FREIA 31st October 2017
Status of the cryogenic system for B180
ILC Cryogenic Systems Draft EDR Plan
LN2 Circuit for MIT Test, September 2005
IBBelle: Status Commissioning at MPP Transport to KEK
TEST PLANS for HL LHC IT STRING
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
Cryogenics – The Basics
ACT1 LOFA model updates and LOCA analyses
SNS Cryoplant Commissioning Past Experiences
Nitrogen release from the TT2A cryogenic solenoid systems
Schematic diagram of the cryogenic system
MERIT – status and schedule
as a prototype for Super c-tau factory
Cryogenic behavior of the magnet
Budker Institute of Nuclear Physics,
Cryogenics – The Basics
UPPSALA UNIVERSITY_GERSEMI PROJECT
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
Presentation transcript:

Discussion on MERIT Cryogenics Specifications Outline List of questions & comments Possible roadmap Ilias Efthymiopoulos, CERN Generally look at the titles! 1/3, 1/1, 3/1 VRVS Meeting CERN – December 15, 2005

3. FLOW SCHEME, FUNCTIONALITY LN2 Surface dewar Redundant gas bottles (for pressurisation) Main transfer line Magnet Cryostat DVB Phase separator P&I Diagram Transfer lines Distribution Valve Box (DVB) N2 Exhaust (ambient temp.) Heater June 27, 2019 I. Efthymiopoulos, A.Fabich - CERN

Question #1 Filling of the magnet Fill the cryostat from the bottom rather than the top. If required by the magnet design, it should be like this. The "He/LN2 port" will be used instead to support a room-temperature pressure relief valve for the N2 volume of the magnet The valve CV203 not in use and could be omitted Wire scanners: “slow” measurement! I. Efthymiopoulos, A.Fabich - CERN June 27, 2019

Question #2 Filling rate of the magnet The flow capability of the line between the phase separator and the drain port of the magnet to be increased from 200 g/s to 300 g/s. To assure the 100 g/s boil off rate  20min cycle As a consequence the size of CV204 should be modified accordingly The design of CV204 can handle 200 g/s which is a large quantity per time unit Increasing flow specifications results in a cost increase May risk to bypass the 100g/s boil off rate in which case we must close CV204 further  Can big valves control small flows? Can the magnet drains support that increase and what would be the corresponding pressure rise? How important is to stick to 20min cycle? If it becomes 40min what we would really loose? Wire scanners: “slow” measurement! I. Efthymiopoulos, A.Fabich - CERN June 27, 2019

Question #3 Safety aspects Complete the design and indicate the pressure relieve valves and other safety items. Where will the released N2 gas go? Is there any risk to have activated gas spread into the tunnel? As a consequence the size of CV204 should be modified accordingly It is mandatory and the design should show it that all the gas releases go to TT10 tunnel. A collector will be installed somewhere  should be shown in some design Wire scanners: “slow” measurement! I. Efthymiopoulos, A.Fabich - CERN June 27, 2019

Question #4 Pressure issues What will be the estimated supply pressure from the 6000L dewar source to the phase separator/valve box? Why is important to design for 20 bar when we may not exceed the 10 bar pressure? It is mandatory from the CERN standards for pressure vessels in underground areas Wire scanners: “slow” measurement! I. Efthymiopoulos, A.Fabich - CERN June 27, 2019

Question #5 Detailed design Need to define all the engineering aspects for the system such as dimensions, physical space, weight limitations, interconnections, etc. Define the safety and other standards the system must meet. All these, and others, will be part of the specifications document that is currently under completion. Wire scanners: “slow” measurement! I. Efthymiopoulos, A.Fabich - CERN June 27, 2019

A Possible Roadmap Target date: Installation of the system underground in November 2006 The magnet arrives from US The cryogenics system is lowered down from bat.180 Count backwards: 2 month setting up and testing at the surface with dummy load (bat.180) 5 months production of CVB Milestone to place the contract to the company: March 2006 Today: Address the remaining open issues in the design; go ahead and complete the specs. Action: Friedrich Haug Milestone to have the specs ready: January 16, 2006 Wire scanners: “slow” measurement! I. Efthymiopoulos, A.Fabich - CERN June 27, 2019

A Possible Roadmap Next steps: Should we find it necessary after today’s discussion: Call an Engineering Review with external experts (3?) to validate the design in case we find it necessary after today’s discussion Agenda: Magnet system by P. Titus Cryogenics system by F. Haug Organize it around January 20 >January 20: RAL takes over and does the tendering. Action: Y.Ivanyushenkov Follow-up production by Yury + Friedrich Delivery at CERN in September 2006 Wire scanners: “slow” measurement! I. Efthymiopoulos, A.Fabich - CERN June 27, 2019