© Be selective and prioretize in order to be on time!

Slides:



Advertisements
Similar presentations
Construction Costs         DM-L2 Objectives: Apply the unit cost of materials and labour to a measured project, in order to determine an overall cost.
Advertisements

Powered by INTRODUCTION TO RAPID Introducing a breakthrough digital short to medium run label press by Rapid Machinery. Powered by.
Transmission Electron Microscopy (TEM)
R&D in Norwegian Public Roads Administration Director Helen Riddervold.
USC Viterbi School of Engineering. Information Technology Goals Perform the fundamental research and develop the software components for automating mega-
Name: ………………………………………………………… Class:……………… Teacher:…………………………………………..
USC Viterbi School of Engineering. Automated Construction by Contour Crafting Automated Construction by Contour Crafting Behrokh Khoshnevis University.
SpaceExtrusion Design Automation for Extrusion Dies.
Slide 1Fig. 15.1, p.453. Slide 2Fig. 15.1a, p.453.
What is Additive Manufacturing More common name: 3D-printing Layer-based technology Designs are created or scanned using computer software, usually CAD.
Slide 1Fig. 11.1, p.337. Slide 2Fig. 11.2, p.338.
Slide 1Fig. 19.1, p Slide 2Fig. 19.2, p. 583.
Slide 1Fig. 21.1, p.641. Slide 2Fig. 21.2, p.642.
Slide 1Fig. 10.1, p.293. Slide 2Fig. 10.1a, p.293.
Data Clustering Methods
Slide 1Fig. 5.1, p.113. Slide 2Fig. 5.1a, p.113 Slide 3Fig. 5.1b, p.113.
Computer Simulations of Wind Tunnel Experiments
Date:2011/06/08 吳昕澧 BOA: The Bayesian Optimization Algorithm.
Environmental Engineering
P Fig. 6-1, p. 193 Fig. 6-2, p. 193 Fig. 6-3, p. 195.
Slide 1Fig. 4.1, p.78. Slide 2Fig. 4.3, p.78 Slide 3Fig. 4.4, p.80.
Printers. What are the printers used for? They are used for printing the computer output on paper.
Tutorial 1: Computer Aided Drafting (Concepts in Engineering Designs) 小明 in ERB106 SolidWorks Reference (Online resources) 
Printing Information on a paper is known as “Hard Copy”. There are two main types of printers: - Impact - Non-Impact.
Business Systems Planning (IBM Corporation) Initial work on BSP began in the early 1970s. At first, it was for IBM internal use only; later it was made.
1 Veltrup Technik Philippines, Inc. Manila, Philippines Cleaning of Big Supply lines Diameters of 25” – 36” The Roto-Fan system of Veltrup Technik Philippines,
1 PRODUCT ENGINEERING TOOLS It allows exactitude on: - Materials and pieces control - Weight and centroids Estimation - Cost estimation 3D MODEL
ABRASIVE JET MACHINE.
Wes Marshall, P.E. University of Connecticut March 2007
Engineering Design Process
Sole Supports Imaging Software Group 9: Edward Krei (BME) Edward Krei (BME) Michael Galante (CompE) Michael Galante (CompE) Derrick Snyder (CompE) Derrick.
6.3 Conditional Probability.  Calculate Conditional Probabilities  Determine if events are independent.
computer
BY: QUANISHA BRUCE DATE: 23 RD MARCH 2014 BLOCK: 1 ST Engineering Problems.
Integrating SMS 2003 Into a Work Place Environment Adam Bolton EKU, Dept. of Technology, CEN/CET.
Slide 1Fig 28-CO, p.858. Slide 2Fig 28-1, p.859 Slide 3Fig Q28-19, p.884.
Developed by Tim Bell Department of Computer Science and Software Engineering University of Canterbury Human Computer Interaction.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 08, 2011 Fully automated machine that proves the concept of automated construction.
Re-Do It -- Faster, Cheaper, Greener Pavement Renewal Solutions.
P&W Expectations for QAT AST was a successful NASA/Industry program, provides a blueprint for QAT QAT is funded at 1/2 of AST Noise Element, that has an.
Working Drawings Introduction To Technology Shenendehowa High School
Integration of practices, crosscutting concepts, and core ideas. NGSS Architecture.
Team #5 Nicholas Baker Alejandro Haller Matthew Hudson Cristobal Riojas Sep 09, 2011 Fully automated machine that proves the concept of automating construction.
Introduction to Engineering Introduction to 2-D CAD Reference – CADKEY Project Book Chapter 3 – Creating Basic 2-D Geometry.
Output Devices. Any items of hardware that the computer uses to present data to the user –Can output text, images, video, sound or other types of data.
Operation/Maintenance Fix small problems before they become big ones.
David Luebke 3/5/2016 Advanced Computer Graphics Lecture 4: Faster Ray Tracing David Luebke
4 PRINTER PROBLEMS AND THEIR QUICK SOLUTIONS. Printers, in some cases they work just fine, sometimes they do not, as well as generally, it is by the time.
All about Factors K. Ganesan Grade Level: 5-8. Introduction What is a factor? F is factor of N if N / F has remainder 0. Example: The factors of 18 are.
1 Presented By: Yasir Ali. 2 Printers Impact Printers Non-Impact Printers Daisy wheel Dot- Matrix Inkjet Thermal Laser.
Aim: How can we apply Newton’s 1st and 2nd Law?
BACK SOLUTION:
Sketching Design & Drafting Unit 4.
Taking the “P” Out of Splash-Back
مبررات إدخال الحاسوب في رياض الأطفال
Marketing in Engineering Design
Building Drawings.
Start Finish Find the solution 42 out of out of 2200
Jigar.B.Katariya (08291A0531) E.Mahesh (08291A0542)
I PRO' -.._ r.. f FOLLOW I 0.
21twelveinteractive.com/ twitter.com/21twelveI/ facebook.com/21twelveinteractive/ linkedin.com/company/21twelve-interactive/ pinterest.com/21twelveinteractive/
Automated Software Integration
Scientific Inquiry Observe & Explore Ask Questions “Wonder”

CSCI 130 Classes and Objects.
Exercise Tool Life An engineer is interested in the effects of four factors on y = life of a tool: A: Cutting speed B: Cutting angle C: Tool hardness.
Towards Using Microbes for Sustainable Construction Materials:
LESSON 7–5 Parametric Equations.
Practice Geometry Practice
Presentation transcript:

© Be selective and prioretize in order to be on time!

Automated construction of concrete block pavements Insitu concrete 3D-print Automated construction of concrete block pavements Be selective and prioretize in order to be on time!

Research Concept @ TU Wien Accelerated Pavement Tests Full scale experiments Material and interaction behavior testing PD PA block pavement PA CE PD PC PB computational engineering - optimization

HARD WORK FOR MORE THAN 4000 YEARS Be selective and prioretize in order to be on time! HARD WORK FOR MORE THAN 4000 YEARS

Construction mistakes Problems Expensive Construction mistakes Be selective and prioretize in order to be on time! Cutting necessary (waste of material, noisy, fine dust pollution) Limited design possibilities

Solution Insitu 3D Print Speed ~ 1h pro m2* Nozzle Be selective and prioretize in order to be on time! Speed ~ 1h pro m2* Nozzle Paving block contours * Depending on resolution, finishing and geometry