EPICS at Diamond Mark Heron Head of Controls Group

Slides:



Advertisements
Similar presentations
Control System Studio (CSS)
Advertisements

V4 Status and Workshop Report CSS, DISCS, an V4 team.
EPICS V4/areaDetector Integration
EPICS Collaboration Meeting, CEA, Saclay, Oct 2014 The use of EtherCAT with EPICS at Diamond Ronaldo Mercado 22/10/2014.
EPICS Noboru Yaamamoto Jan 27, 2009 for EPICS seminar at RRCAT, Indore Installing EPICS.
AreaDetector Data Processing Pipeline In EPICS V4 Dave Hickin Diamond Light Source EPICS Collaboration Meeting Diamond Light Source 01/05/2013.
Pete Owens MICE Controls & Monitoring Workshop 25th September 2006 MICE Control and Monitoring: General Architecture Subsystem Integration User Interface.
Packaging of EPICS-basedControl System Software
Lucretia - Floodland Flight Simulator for ATF2 Glen White SLAC ATF2 Project Meeting Dec 2007.
Managed by UT-Battelle for the Department of Energy Open XAL Open Development of the XAL Accelerator Application Framework Christopher K. Allen Tom Pelaia.
Scan System Kay Kasemir, Xihui Chen Jan Managed by UT-Battelle for the U.S. Department of Energy Automated Experiment Control “Scan” should be.
SNS Integrated Control System EPICS IOCs – Relational DB Connectivity Bridge A. Liyu, A. Zhukov.
Imperial College Tracker Slow Control & Monitoring.
Automatic Regression Test Facility for Support Modules Jon Thompson, Diamond Light Source Vancouver, 1 May 2009.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Matthias Clausen, DESY XFEL Refrigerator Controls – April CSS-DCT (SNL) Training.
Main Bullet #1 Main Bullet #2 Main Bullet #3 EPICS and CLS September 18, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Core (and other development efforts) L. Dalesio. EPICS April 25, 2013.
Access Across Time: How the NAA Preserves Digital Records Andrew Wilson Assistant Director, Preservation.
Debby Quock November 13, 2012 IRMIS at CLS. IRMIS Currently at CLS PV Crawler –Perl modules that parse EPICS IOC st.cmd, db, and dbd files. Information.
Beamline Controls with EPICS at NSLS Zhijian Yin NSLS, BNL EPICS Collaboration Meeting, SSRF, March 2008.
LCLS Undulator Positioning Control System Shifu Xu, Joseph Xu, Josh Stein Control Group, AES/APS, ANL June 15, 2006.
1/15 G. Manduchi EPICS Collaboration Meeting, Aix-en-Provence, Spring 2010 INTEGRATION OF EPICS AND MDSplus G. Manduchi, A. Luchetta, C. Taliercio, R.
Elliott Wolin Hall D Online Meeting 4-Mar  A few weeks ago Elke asked how long it would take to get an EPICS system going  I didn’t know  I had.
Jan Hatje, DESY CSS ITER March 2009: Technology and Interfaces XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 CSS – Control.
Control System Studio (CSS) Overview Kay Kasemir, July 2009.
Elder Matias, Diony Medrano, Dong Liu (At Michigan State University - Nov 2011) IRMIS at CLS.
Final Review of ITER PBS 45 CODAC – PART 1 – 14 th, 15 th and 16 th of January CadarachePage 1 FINAL DESIGN REVIEW OF ITER PBS 45 CODAC – PART 1.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Matthias Clausen, DESY XFEL Refrigerator Controls – April CSS Core Applications.
Automated Testing Presentation to EPICS Collaboration Meeting DESY Paul Gibbons PhD Diamond Light Source Ltd.
15/06/2006 The Future of Visual DCT EPICS Collaboration 2006 Argonne National Laboratory
Integrating EPICS and LabVIEW on Windows using DCOM Freddie Akeroyd ISIS Computing Group.
Disk Layout/Productization Proposal Ron Rechenmacher and Geoff Savage.
EPICS Application Development At The Canadian Light Source Glen Wright.
Solve problem of integrating other control systems Solve problem of extending our control system Minimize the latency for data Minimize the implementation.
LANLLEDA, LANSCE*, AFEL ANLAPS, 25 of 37beamlines, IPNS JLABCEBAF, FEL, Halls A.B.C. LBLALS, BaBar, Heavy ion Fusion, Gammasphere, SLACPEP II*, NLC** ORNLSNS,
Controls & Monitoring Overview J. Leaver 03/06/2009.
Jan Hatje, DESY CSS GSI Feb. 2009: Technology and Interfaces XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 CSS – Control.
B. Dalesio, N. Arnold, M. Kraimer, E. Norum, A. Johnson EPICS Collaboration Meeting December 8-10, 2004 Roadmap for IOC.
R. Keitel IRMIS Workshop, APS, 9-Mar-2005 RDB Tools at TRIUMF/ISAC.
Elder Matias on behalf of CLS Beamline Control and Data Acquisition.
EPICS Noboru Yaamamoto July 11, 2006 for EPICS seminar at VECC,Kolkata Installing EPICS.
E. Matias Canadian Light Source CLS Beamline Controls.
Disk Layout/Productization Proposal Ron Rechenmacher and Geoff Savage.
Motion Control at the Advanced Photon Source Argonne National Laboratory Mark Rivers University of Chicago 7 GeV synchrotron x-ray light source, the largest.
16th Oct 08 Tom Cobb - Python at DLS 1 Uses of Python at Diamond Light Source.
Diamond Light Source Data Acquisition System Paul Gibbons.
Introduction to Control System Studio (CSS) Kay Kasemir, Kunal Shroff EPICS Fall Collaboration Meeting, October 2011 PSI.
R. Keitel Epics Collaboration Meeting, SLAC, 27-Apr-2005 RDB Use at TRIUMF/ISAC.
Generic Data Acquisition (GDA) Richard Fearn Data Acquisition Diamond Light Source.
EPIC S Noboru Yaamamoto July 11, 2006 for EPICS seminar at VECC,Kolkata Installing EPICS.
1 BROOKHAVEN SCIENCE ASSOCIATES EPICS Version 4 – Development Plan V4 Team – presented by Bob Dalesio EPICS Meeting October 7, 2011.
Tango Collaboration Meeting May 13 th 2009Sardana Status Report Sardana Status Report Tango Collaboration Meeting May 13 th, 2009 Tiago Coutinho - ALBA.
LCLS Commissioning & Operations High Level Software
JavaIOC Overview and Update
Current Status of IPM-Linac Control System
Andrew Johnson and Eric Norum AES Controls Group, Argonne
Mark Rivers University of Chicago
Integration of Blu-Ice into
EPICS and CLS September 18, 2009.
A brief history of EPICS
HAPS Controls Glen White ATF2 Software Review Workshop, LAL, June 2008
LCLS Commissioning & Operations High Level Software
Status of Fast Controller EPICS Supports for ITER Project
Getting Started with EPICS A lecture Series
Control System Studio (CSS)
NICOS – IBEX Interactions
European Spallation Source Archiving Service
Inclusions ABAP Care Package Smart Forms Creation & Enhancement
SLC-Aware IOC Magnet Functional Requirements
TANGO from an EPICS perspective
Presentation transcript:

EPICS at Diamond Mark Heron Head of Controls Group Diamond Light Source

Current Diamond Control System (1) EPICS: 3.14.12 PVs: Acc. 862,050, Beamlines 2,376,386 IOCs: Acc. 363, Beamlines 1017 Channel Archiver: 52 Archives, 256,839 PVs, 35TB EDM: ~7000 panels Gateways: ~40 Hardware: 467 VME, 56 x86 ~240 ARM, ?? Soft Extensions: asyn, Area Detector, Motor Record, Streams, …. Clients: EDM, CSS, BURT, ALH, Channel Archiver, …. Client Libs: C++, Python, GDA (Java), MML (Matlab), .Net, ….

Current Diamond Control System (2) EPICS V4 Detector integration Malcolm a middlelayer framework that implements high level configure/run behaviour for continuous scan

Future Diamond Control System (1) EPICS 7 Migration path PVA Gateway, PVA Archiver, PVA DM Moving to EDM to CSS, CA to AA PVA WebDM Services to eg Malcolm uses EPICS V4 PVA Client libraries Python, Java, .Net Blessed Area Detector NTNDArray Mark Rivers is planning IOC CA-to-PVA Gateway Training material and documentation

Future Diamond Control System (2) IOCs Dynamically create/delete records Introspect to define PVs that make up a “Device” Refresh Records Motor Record behaviour Python IOCs Build EPICS support modules in a more ‘standard’ fashion ie ./configure Removes edit of configure/* files Supports use of Continuous Integration services Stability of code base and releases

Diamond’s Commitment Historically Diamond has had at least 1FTE on working on EPICS Core Was David Hickin now with European XFEL Other developments and contribution CSS, CAtools, Area Detector, Various Device Support, Ethercat, …. Diamond very willing to contribute Needs to be against a plan for EPICS We need to show organisational benefit See EPICS council as important in defining future direction

Thank you Questions