Task Force 1: Protection against Water

Slides:



Advertisements
Similar presentations
Task Force 3: Electrolyte leakage Last update- 12/05/
Advertisements

TF8 – OICA considerations for the draft annex for heavy vehicles.
EVS TF6-SOC 19th Mar CCFA 2 Rue de Presbourg Paris JASIC.
Progress report of e-Lab sub-group (WLTP rev1e)
Progress report of TFG 7 “Fire resistance test” June 5, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Progress report of TFG 7 “Fire resistance test” Mar 18, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
Task Force 1: Protection against Water China Mar 19 , 2015.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
Progress Report, EVS SOC-TF May 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DC
Volker Rothe, OICA October 23, 2012 Draft Global Technical Regulation Electric Vehicle Safety Outline of the OICA proposal.
Draft Proposal ECE-R 100 protection against electric shock
9 th EVS GTR Meeting Task Force #9 Status Report Changchun, September 17th 2015.
Task Force 3: Electrolyte leakage Last update- 11/11/ EVS-06-19e.
Task Force 1: Protection against Water Jun 4th , 2015.
TF8 work report for 9 th EVS-GTR conference Changchun.
Task Force 3: Electrolyte leakage Last update- 01/06/
TF5 – Status report on thermal propagation EVS-GTR 9 th IWG meeting Changchun, China 2015/9/17.
Flooding Test of Electric Vehicles FAW , CHINA
Progress report of TFG 7 “Fire resistance test” Mar 19, 2015 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute (KATRI)
9th GTR EVS meeting TF4 status report
Progress report about RESS activities Gerd Kellermann, Germany Informal document GRSP (50th GRSP, 6–9 December 2011, agenda item 15)
Task Force 3: Electrolyte leakage Last update- 19/03/
Progress report of TFG 7 “Fire resistance test” (rev.1) Nov 19, 2014 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
EVS-GTR TF5 Update Progress
1 TF8 : Applicability for Commercial Vehicles EVS 8th Meeting June 4th , Washington DC.
Task Force 3: Electrolyte leakage Last update- 14/09/
EV Safety GTR Task Force Group #2 – Low Electric Energy #9 EVS GTR Status Briefing September, 2015.
Task Force 1: Protection against Water September 14th , 2015.
Purpose of Water Test Purpose of Water Test is to evaluate protection performance against the electric shock of vehicle in normal operation. Requirements.
Progress report of TFG 7 “Fire resistance test” Mar. 3rd, 2016 Korea Transportation Safty Authority (TS) Korea Automobile Testing & Research Institute.
Task Force 1: Protection against Water February 29th , 2016.
Review of EVS 9 th Meeting 1> TF8 catch an agreement on the definition of heavy duty electric vehicles as below: heavy vehicles cover the vehicles belong.
TF#4 – Mechanical Integrity Approved Japanese proposal for addition of vehicle mechanical protection structure into mechanical integrity requirement. EVS-11-17e.
1  Position of China and Japan  The water test should be included in EVS-GTR Phase 1.  Test exemption for vehicles with isolation monitoring system.
Task Force 8: Heavy Duty Vehicles
OICA input on TF1 discussions for GTR-EVS
TC22 SC37 WG3 Liaison Report for EVS-GTR Thermal Propagation Work Item
WLTP IWG ISC Taskforce: Starting note
Task Force 3: Electrolyte leakage
Task Force 3: Electrolyte leakage
10th EVS-gtr IWG Progress Report TF6 - SOC 2nd March
Electric Vehicles Safety Global Technical Regulation
EVS-11-22e Summary Report on TF8 Washington DC, US 2016/06/16.
Co-Sponsors: China, Japan, EU and US 59th Session GRSP May 9-13, 2016
Report Task Force UNR46 5th Meeting OICA Paris, 26-27th September 2016
JASIC Japan ______ 61st GRSP Session May 2017
Task Force Outline Submitted by an expert from the Republic of Korea
Outcome of TFCS-12 - summary slides - (detailed meeting minutes will be provided separately) April The Shilla Seoul, ROK.
TF4 report (Tokyo, 2016/03/03) 1. Mechanical integrity test
Task Force 3: Electrolyte leakage
Informal document GRE-79-04
Task Force 1: Protection against Water
WLTP-DTP Subgroup Additional Pollutants Progress report
WLTP-DTP Subgroup Additional Pollutants Progress report
Task Force 1: Protection against Water
WLTP Phase 2 Presentation and discussion of the Term of Reference for the Durability Task Force Paris, April th WLTP IWG meeting DG GROW.C4.
Status report of TF-CS/OTA
EVS-06-10e Progress Report on TF5 Nov. 3rd, 2014.
Japan’s response to Action item 2 EVS-GTR IWG#17.
Chair: Jin Seop Park, Republic of Korea Secretary: Thomas Kinsky, OICA
WLTP-DTC Air Pollution Control and NIR Division
Discussion at 21 September 2016 IWG meeting
8th all TF F2F Meetings EVS Washington DC
WLTP-DTP Subgroup Additional Pollutants Progress report
TF9 Meeting: Warning Light Indicator
Task Force 1: Protection against Water
TF5: Cell/module/system test
TF1 Meeting content Open issues of EVS 10th meeting
Status of discussion after 7th meeting
Status of discussion after 8th meeting
Presentation transcript:

Task Force 1: Protection against Water September 16th,2015

Outline 1 2 3 General information about TF1 TF1 working progress Conclusion

1. General information about TF1 TF1 working scope To prevent the person from electric shock :washing and flooding. TF1 working objective To form the requirements in the GTR regulations. The working group No. Members 1 Nha Nguyen (USA, NHTSA) 12 Mr. Brian Lawrence, JLR. 2 Mr. Thomas Goldbach, GM 13 Alexandra MULOT, UTAC(France) 3 Mr. Volker Rothe, GM 14 Mr. Olaf Boese, SK Continental 4 Mr.Heiko Mertens (OICA, Volkswagen) 15 Mr. Karim Kortlaender 5 Mr. Uwe Lachmund, VW 16 Mrs. Samarendra Triphathy, Renault 6 Mr. Willi Josefowitz, VW 17 Mrs. Annika Tidblad, Scania 7 PaulineLejeune, PSA Peugeot Citroen (OICA) 18 Mrs. Laura Schenk,Daimler 8 Kazuya Ohzono(Japan, Honda) 19 Michael Guse, Daimler 9 Mr. Masaaki Iwasaki, Toyota 20 Mr.Zhan Wenzhang, China, BAIC GROUP 10 Mr. Takahiko Miki, Toyota 21 Mr.Chen Ping   Chnia ,CHANGAN 11 Mr. Naoki Kinoshita, Honda 22 Mr. ZhangTianqiang, China, FAW

2. TF1 working progress The 4th EVS meeting TF1 was set up. TF1 discussed the requirements and test procedures of insulation resistance proposed by FAW(China). The 6th EVS meeting EVS IWG asked TF1 draft a proposed text for inclusion in the draft GTR. The 7th EVS meeting TF1 proposed draft to the EVS IWG. The 8th EVS meeting TF1 experts reached an agreement about the draft except one open issue—detailed parameter of the flooding test procedure.

3. Conclusion We had TF1 F2F meeting on this Monday, and all the members agreed to propose the GTR draft to EVS IWG. The future work: Provide more justification for the flooding test parameters. Keep on discussing whether the REESS condition (fire/explosion) should be checked after vehicle test. Keep on discussing whether flooding test method are suitable for heavy duty vehicles with TF8.

Thank you for your attention!