IT Lobby Renovation at Merts

Slides:



Advertisements
Similar presentations
Visualize Success 2011 Allan Lee Professional Services Visual South, Inc. Quick Quote/ Estimating Window.
Advertisements

Chapter 12 Estimate Summaries and Bids. Bid Summaries The format of the summary depends for what the estimate is to be used. –Ordering materials –Calculating.
Preparing a Post Bid Report Preparing a Post Bid Report NYS OGS Design & Construction Group Cost Control.
Bids ranged from $992,264 to $1,999,305 JO-SH General Engineering was apparent low bidder Lash Construction 2 nd $1,156,453 Construction to start.
February 28, 2008 TRAINING UDOT Contractor PC USERTrust Vault World Wide Web UDOT Electronic Bid System Flow Chart.
Additive Alternates on ODOT let Projects -A discussion- Joe Anthony Supervisor, Construction Cost Section Office of Estimating.
Building Procurement Knowledge: How to do business with the University – a look at Purchasing Policy & Guidelines.
District of Columbia Dept. of General Services Natural Gas RFP Webinar November 13, :30 pm ET.
EMARS User Group Meeting Don Speer. ETHNIC MINORITY BUSINESS SMALL PURCHASES 2.
Office of Operations 2009 Fall Conference Navigating Uncertain Times October 21-22, 2009 NYS Contract Reporter – Upcoming Changes Nancy Fisher, Deputy.
A) 80 b) 53 c) 13 d) x 2 = : 10 = 3, x 3 = 309.
Facilities and Construction: Did you know your GPO can help?
Real Estate Markets Introduction. Real Estate Markets: Economic Determinants of New Construction.
ISI Request For Quote Integrates with Microsoft Dynamics GP Inventory, Purchase Order Processing and Sales Order Processing Dynamics is a registered trademark.
Chapter 1 Introduction to Cost Estimates What is an Estimate? An estimate is an evaluation of a future cost. A building cost estimate is an attempt to.
Management Summary Reports with BAMS/DSS Jeff Lee Derrer, PE, CPM Senior Consultant Info Tech, Inc. Presented September 5, 2003 at the TEA Conference in.
September 9, 2009 Report on SWGWTP Deep Well Drilling Phase 2.
UTSA PTAC Supplier Vendor Networking Breakfast Clifford Gorman Contracting and Purchasing Specialist Doing Business With SAWS Purchasing Department January.
1 ONLINE TIER II ELECTRONIC REPORTING SYSTEM “OTTERS” Jill Schunk Our Fearless Leader.
BidSync State of Utah Division Staff Account Setup and Navigation Training DHS Office of Fiscal Operations, Bureau of Contract Management.
Department of Public Works Arroyo Seco Casting Pond Renovations Contract Award to Mallcraft, Inc.
Global POSCO Family 0 Screen: Bid running status Menu path: BIDDING/Bidding running/Bid running status Description: View Bid Running Status ScreenProcesses.
Small Business and DVBE Services Branch Procurement Division Department of General Services.
Vernon L. Davis Contractor Liaison The Pennsylvania State University Office of Physical Plant SEDA COG NOV 2015.
C-4 Canal Bank Improvements Belen Phase 2 Flood Protection Berm & Wall John Mitnik, P.E. Engineering & Construction Bureau Chief John Mitnik, P.E. Engineering.
FARMWORKER ASSOCIATION BUILDING BCC Presentation October 02, 2007 BCC Presentation October 02, 2007.
California Energy Commission Update on ETEC/ECOtality Bankruptcy October 14, 2013.
1 Award of Bid #Y9-732-SB Barnett Park Gymnasium County Administration June 9, 2009.
Messer Construction Company Presented By: Mark Zimmerly.
Overview of Statutes and Regulations Sec. 46a-68j-31. Notification of contract awards by awarding agency. b. An awarding agency shall not be required to.
RESEARCH FOUNDATION PURCHASING PROCUREMENT OUTREACH TRAINING LEVEL I INTRODUCTORY INFORMATION Award Management Services.
Introduction to Procurement for Public Housing Authorities Procurement Planning: Choosing a Contracting Method Unit 2.
Presented by: CCSD Procurement Services Department How to do Business with the Cobb County School District 1.
Office of Management and Enterprise Services Central Purchasing Division Keith Gentry Contract Manager
PURCHASING 101 SECTION 1 - How to Begin. Is the purchase available from your agency or from other state agencies? ⋆ State Surplus Property ⋆ State Fleet.
Introduction to Procurement for Public Housing Authorities Small Purchase Procedures Unit 4.
Doing Business with Metra. Metra’s Database Metra Vendor Form.
The most common methods to use to obtain pricing. VERBAL QUOTES REQUEST FOR INFORMATION REQUEST FOR PROPOSAL REQUEST FOR QUOTATION INVITATION TO BID REVERSE.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
Reject all bids for Citywide Tree Trimming Services and authorize increases to Contracts No. 21,628 and No. 21,629 with George Salinas Tree Preservation,
Contract Compliance: Set Pricing Terms
Microsoft support TollFree
RFP Key Dates Identity and Access Management Systems
Robinson Park Recreation Center Renovation
Tree Trimming Services
Woodbridge Township School District Referendum 2017
Bidding Requirements Review Questions.
Presenters’ Contact Information Lee Bennett MWBE Program NYS Office of General Services (518) Susan Buckman Division.
Requisition Entry Guide
Awarded Vendors Bid No MS Packaged Ice Delivery Service Contract Term ends 5/2/2023 (6 years) Board Approved PA# Vendor Vendor# Vendor Contact .
Awarded Vendors Bid No MS Preventative Maintenance & Repair Service for Kitchen Equipment Contract Term ends 6/30/2023 (6 years) Board Approved.
Troy School District Bond Program – Series 1 Construction Update
Woodbridge Township School District Referendum 2017
Awarded Vendors Bid No MS Hood Cleaning Services Contract Term ends 4/23/2023 (6 years) Board Approved PA# Vendor Vendor# Vendor Contact Address.
State Electronic Requisition
LaSeven Inc. 215 East 58th Street Corner of 3rd Avenue
QMS Quotation Management System.
Date, location, department
How to do business with the RCSS?
Date, location, department
Department | Website | Phone Number

HOTEL ADDRESS, CITY, STATE & ZIP
SALES RECEIPT Downloaded from
INVOICE Downloaded from
Name of Event Name of Event Date, location, department
Huntsville High School Sports Lighting Upgrades
NAME OF EVENT Name of Speaker Date, location, department
How To Do Business With The RCSS
Small and Micro Purchases
Presentation transcript:

IT Lobby Renovation at Merts Bid#: 13-072   Supplier: Lee Builders, Inc. Metro Commercial Contracting, Inc. EMW Construction, Inc. Description: IT Lobby Renovation at Merts Quote: $ 81,058.00 $ 84,030.00 $ 86,000.00 Beginning Date: 02/22/13 Amount over responsible bid: N/A $ 2,972.00 $ 4,942.00 Ending Date: 03/15/13 % over responsible bid: 3.7% 6.1% Responsible Bidder: Lee Builders Awarded Price: $81,058.00 No Bids: Dunlap Construction Garber Construction Tolar Construction Pertinent Information Base bid price with Lee Builders is $73,372.00. Total Cost includes adding Creston Blackout shades for the windows and adding a Dalite projection screen at an additional cost of $7686.00 The major work will be in the Tech Room and adjacent office area in the IT department 2049 Fisher Street • Huntsville, AL 35803 • Phone: 256-881-1778 • Fax: 256-880-2484 • info@leebuilders.com • www.leebuilders.com