Asset condition and priority in Maximo

Slides:



Advertisements
Similar presentations
HP Quality Center Overview.
Advertisements

Software Modeling SWE5441 Lecture 3 Eng. Mohammed Timraz
HSE’s Ageing and Life Extension Key Programme (KP4) and Human Factors
NCHRP 07-21: Asset Management Guidance for Traffic Control Devices, Barriers, and Lighting 2014 ATSIP Annual Meeting Presented by Nancy Lefler Vanasse.
ITIL: Service Transition
Copyright © 2007 Advantica Inc. (USA Only) and Advantica Ltd. (Outside USA). All rights reserved by the respective owner. Benefits of an Integrated Compliance.
Aust. AM Collaborative Group (AAMCOG) An introduction to ISO “What to do” guide 20th October 2014.
1 Anglian Water - Sewernet David Singerton, Innovation Projects Manager Evolving an Extreme Rainfall Management system Sewernet proposals 20 th November.
Blue Drop 10yr plan Indaba Auditorium, Rand Water, Rietvlei Kista Naidoo 18 February 2015.
Front Page …..is an Asset Management tool designed to record and aid the analysis of activities affecting Production capability and costs. …..promotes.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Enterprise Asset Management
Hazard Identification
Margin Management Tool (MMT) Recommended Approach 23-January-2014
HUMAN RESOURCE PLANNING
Value Driven Maintenance Discover The Hidden Treasure In Your Organization Mark Haarman, Managing Partner Birmingham, 18 April 2012.
Systems Development Lifecycle Project Identification & Selection Project Initiation & Planning Analysis Logical Design Physical Design Implementation Maintenance.
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
KPIs report Requirements for KPIs – lagging vs leading
Knowledge Management in a fast changing world Kate Elphick
1 Underground Asset Management Jonathan Mongie. 2 Asset Management ► Improved Asset Condition l Increased System Efficiency ► Prolonged Asset Life l Reduced.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
WRAP Committee and Forum Updates WRAP Board Meeting Salt Lake City, UT October 15, 2003.
Project Tracking and Monitoring QMS Training. 2 Objective To track and monitor the progress of the project and take appropriate corrective actions to.
RBM and Asset Strategy.
C6 Databases. 2 Traditional file environment Data Redundancy and Inconsistency: –Data redundancy: The presence of duplicate data in multiple data files.
1 Introduction to Software Engineering Lecture 1.
Lecture 14 Maintaining the System and Managing Software Change SFDV Principles of Information Systems.
Copyright 2003 – Cedar Enterprise Solutions, Inc. All rights reserved. Business Process Redesign & Innovation University of Maryland, University College.
Project Portfolio Management Business Priorities Presentation.
Digital recordkeeping strategy for mobile work processes Joel Smith HPRM System Administrator.
Module 4: Systems Development Chapter 13: Investigation and Analysis.
System Maintenance Modifications or corrections made to an information system after it has been released to its customers Changing an information system.
19/11/2015 PSB and PS&TT2 Facilities YETS L. Kobzeva.
Minimising IT costs, maximising operational efficiency IO and NIMM: Now is the time Glyn Knaresborough Director of Strategic Consulting.
ACEC National Energy and Environment Challenges in Asset Management? Brian Long Transmission Line Performance Xcel Energy August 15, 2015.
© 2015 IBM Corporation Introducing. © 2015 IBM Corporation 2 SELF-SERVICE Covers a wide spectrum of users Power users Consumers Creators Level of Management.
LECTURE 5 Nangwonvuma M/ Byansi D. Components, interfaces and integration Infrastructure, Middleware and Platforms Techniques – Data warehouses, extending.
A Risk Based Approach to Asset Management of Alcoa’s Civil Infrastructure in WA Presented by DENNIS FOO, Industrial Maintenance Roundtable ( IMRt )
Towards a dependable and sustainable National IT Infrastructure MANAGING IT INFRASTRUCTURE ASSETS: IMPLEMENTATION NEEDS.
© 2013 IBM Corporation IBM Predictive Maintenance & Quality Orchestration BA Technical Seller Training 1.
Road Investment Decision Framework
PRACTICE INTO ACTION Briefing to. About the Road Efficiency Group (REG) A collaborative initiative by the road controlling authorities of NZ Driving value.
1 © Trinity Horne Limited Analysing pollution and targeting prevention activity in a UK water company Alec Ross Senior Statistician Luke Cooper.
Asset Degradation Modelling at Townsville Water
5th Shire River Basin Conference 22 February 2017 Shire River Basin Management Project Shire Basin Planning Tool Sub-Component A1 Development of a.
2017.
Contract Lifecycle Management In the Disruptive Age
Test Roles and Independence of Testing
An oil company in Canada
CIM Modeling for E&U - (Short Version)
Performance monitoring framework for the technical infrastructure
Planning Monitoring & Controlling the Maintenance Programme
Presented by Jon Pastuszynski, Lead M&D Engineer
Galt WWTP Clarifier Renewal Program
University of Bristol Service Management Project
The Internet of Things (IoT) and Analytics
TechStambha PMP Certification Training
Smarter Analytics An oil and gas producer in Canada improves safety and reliability with insights into equipment failure and preventive maintenance USD478,000.
Welcome: How to use this presentation
Introduction to Systems Analysis and Design
Project Ideation Agile Down-to-Earth © 2016.
CIS12-3 IT Project Management
Chapter 8 Software Evolution.
Driving higher profitability through Machine learning
Operational Excellence - Transforming our operations
5.b3 Monitoring & Reporting 2019
SESSION 1 ANALYTICS AND TRENDS KIMBLE AUTUMN USER GROUP 2018
Driving Successful Projects
Presentation transcript:

Asset condition and priority in Maximo Moving from works management to asset management Vic/Tas Maximo User Group, Nov 2018, Zoltán Kelly

Traditional approaches at Melbourne Water Water supply is critical infrastructure: approaches to asset management are highly risk averse, leading to over-servicing of assets Set and forget: Maintenance and asset replacement regimes defined by standards without ongoing consideration of operating context Reviews and optimisation require effort - manual aggregation of data Strategy Planning Maintenance Operations

Approach so far Maintenance – KPIs for work effectiveness (on time/on cost). Assumptions that the correct work is being requested - High volume of manual inspections Operations – Driven by product quality as top priority. Decision making through based on plant performance within SCADA Strategy and planning – renewal planning and risk assessments managed outside of the asset management system at a high level

Revised approach Where and how is it cost effective to introduce condition assessments? How can we convert asset condition to asset and work priority? How can we ensure the insights are consistently interpreted throughout the asset lifecycle?

What does this mean in reality? AUTOMATED (real time) Integrations from SCADA+IoT in to Maximo to trigger work (meter based PMs) FORM-BASED (daily/weekly) Present data in mobile apps (service requests, work orders). Fit for purpose electronic forms (PEGA, ESRI Survey123) synced back to Maximo to capture in-field condition assessments EXTERNALLY CAPTURED (monthly-annually) Where real-time/sensor data is not available, capture SME knowledge as quantified measure (e.g. meter reading or static attribute on assets). Follow consistent business process to maintain this (annual reviews) Make asset condition data available wherever the decision is being made 2-way integration. Show live data or near real-time data in desktop tools (SCADA); mobile systems, dashboards, and analytics platforms (BI)

Maintenance What is this informing? Condition assessments > work order prioritisation Incident response Secondary: inventory management; workforce skill prioritisation How can we use Maximo to inform these decisions? Use Condition for Work (HSE) and Reason for Work (HSE) to calculate Work Priority and remove subjectivity Make visible in Scheduling applications (manual) Future state: Drive schedule through optimisation engine

Prioritisation Matrix (HSE) Asset Criticality Consequence x Likelihood >> Location Priority   Consequence Low High Likelihood E D C B A 1 2 3 4 5   Reason for Work INVESTIMPROVE HEALTHSAFETY . Loc Priority 1 2 3 4 5 Low 7 11 8 12 15 6 9 13 16 18 High 10 14 17 19 20 Location Priority x Reason for Work >> Work Priority:

New Work Order mobile app

Operations What is this informing? Priorities for plant availability Permit and isolation management How can we use Maximo to inform these decisions? Capture operating context and operating procedures Consideration of priorities when raising defects / breakdowns Future state Capture benefits and losses Incident response

Real time data, analytics, and Maximo Receive: Meter readings Send: Asset history Work history Federated MBOs

Planning and asset strategies What is this informing? Replace or extend asset life Maintenance regime cost optimisation (e.g. iterative RCM) How can we use Maximo to inform these decisions? Analyse performance vs maintenance Age-based degradation Predictive (meter-based) PMs Future state - All of the above (not yet started)

‘Best Practice’ Business process maps Files from IBM Bluemix, see http://www-01.ibm.com/support/docview.wss?uid=swg21994865 HSE Process Maps use APQC process classification framework

Using ML to bridge gaps in data PCR codes - Initial proposal - use natural language processing (e.g. IBM Watson Natural Language processing) to recommend a PCR codes to be assigned to a work order based on input from structured (asset class) and unstructured data (descriptions) - Use this to backpopulate PCR codes for historic work orders Environmental health of waterways Waterways condition assessed at spot points along waterways (water quality and bug monitoring) Boosted regression tree model to interpolate data to give all waterways assets a priority ranking based on habitat suitability 5 year research program with Melbourne University

Combined result – observed vs expected sewer flows Observed (SCADA) over expected (modelled) flows Operations can pre-empt network issues and changes. Informs maintenance coordination. Feedback loop to planners regarding model accuracy.

Move from a top-down approach to an iterative lifecycle Result Design Acquire Install Operate Maintain Refurbish Move from a top-down approach to an iterative lifecycle Consistent understanding across the business Secondary benefits: allows for staff rotation; comparison across different sites