Vance Brand Municipal Airport

Slides:



Advertisements
Similar presentations
Chapter 7 EM Math Probability.
Advertisements

Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Determining and Forecasting Load Reductions from Demand Side Programs September 11-12, 2007 Presented by: Bill Bland, V.P. Consulting, GoodCents Liza Thompson,
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
Prepared for: Ohio Department of Transportation Office of Aviation Prepared by: April 11, 2006 R.D. Zande CCI.
Performance Chapter 11.
Sl No Top-up Amount No Of Affiliate Ads Payment Per Day By Affiliate Ad Total Affiliate Ad Income 1.5,000/- Daily 2 ad for 100 days 100/- Affiliate.
Certification of Pilots, Aircraft, and Repairmen for the Operation of Light-Sport Aircraft Rule December
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Final Exam Sample Problem
Modeling Airport Capacity
Airport Planning and Design
McClellan-Palomar Airport Part 150 Noise Compatibility Study Update Public Meeting - Kickoff March 27, 2003.
Purpose To update the existing master plan To present development options for the airport To create an airport layout plan to document current and future.
Tulip City Airport Airport Master Plan Update Work Team Meeting April 30, 2009 Holland, Michigan.
Airport Sustainability Planning Charlie McDermott, LEED AP Planning Department Manager C&S Companies.
DANVILLE CITY COUNCIL WORK SESSION AUGUST 3,
North American Aviation System Part 2 Standard 3 Objective 1.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
Instrument Approach Charts
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
VNY Part 150 and Part 161: Status Update Presentation to the Board of Airport Commissioners February 1, 2010.
1 Los Angeles World Airports | LAX Interim Runway Safety Improvement Project Update of Interim Safety Improvement Planning Presentation to Board of Airport.
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
HB 1048 / SB 518 Adjustments for Local Programs May 13, 2014 Jennifer B. DeBruhl Director, Local Assistance Division.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
Planes, Boats & Planograms Howard Bergman. The Power of the Customer There is only one boss. The customer. And he can fire everybody in the company from.
Tailwinds Flying Club Spring Safety Session Engine Takeoff Lake Elmo Airport (21D)
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
ANM Emergency Exit Access Review of Documents
1 Comprehensive Management Plan for East Hampton Airport  Safety, Noise and Operations Peter J. Kirsch December 1, 2011.
WHAT AIRPORT MANAGERS NEED TO KNOW ABOUT TERPS Association of California Airports Lake Tahoe, California September 10, 2014 QED Airport & Aviation Consultants.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
1. This airport sign indicates? A) Left turn to Taxi A
Auburn-Lewiston Municipal Airport Runway 4-22 Safety Area Environmental Assessment May 10, 2011.
Aircraft Characteristics
Office of Safety Recommendations and Advocacy Previous Safety Board Recommendations Jeff Marcus Safety Recommendations and Advocacy.
Airport Lighting Brett Malloy
Office of Aviation Safety Delta Connection Flight 6448 Operated by Shuttle America Airport Issues.
“LEGAL ISSUES ASSOCIATED WITH AN RSA PROJECT” Mark Bautista Deputy General Manager Monterey Peninsula Airport David Prentice Scott Huber Stephanie Alford.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Mark George Survival Factors Division
Working Paper One/ Study Committee Meeting May 2015.
Valkaria Airport Master Plan Update Public Information Meeting February 25, 2015 Viera Government Center.
JOHN WAYNE AIRPORT PROPOSED SETTLEMENT AGREEMENT AMENDMENT & EIR 617 Presented to: Orange County Business Council Infrastructure Committee Presented by:
Community Development Department Oare MPD Development Agreement Amendment Application #2719.
Tailwinds Flying Club Winter Safety Session – 2010 Night Flying.
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
Federal Aviation Administration Friedman Memorial Replacement Airport EIS Date: August 6, 2008.
Young Eagles Presenters Steve Brady –FAA Flight Instructor –FAA Designated Pilot Examiner –Aviation Safety Counselor –FAA Production Crew –Flight Instructor.
State Safety Inspections and Sponsor Expectations.
ASTM E17 Committee Mini-Seminar Dec. 5, 2006 Federal Aviation Administration 1 FAA PERSPECTIVE Airfield Pavement Roughness Presentation to: ASTM E17 Committee.
Presented to: By: Date: Federal Aviation Administration Topic of the Month May 2015 Aircraft Performance.
Definition: Preliminary Geometric Design of an Airport in Palestine.
Presented to: By: Date: Federal Aviation Administration Noise 101: Federal Noise Laws and Regulations Town of Payson M.L. Chittick, Scottsdale FSDO January.
Aviation Seminars1 #3259. What is pressure altitude? A- The indicated altitude corrected for position and installation error. B- The altitude indicated.
Study Advisory Meeting June 11, Study Advisory Meeting June 11, 2008 Project Development Process Planning Study (Recommendations) Environmental.
10/31/2012 PROGRESS REPORT Prepared for the Texas Department of Transportation.
Gary Stowell Noise Abatement Manager San Jose International Airport The Next Step - An Airport Perspective.
Young Eagles Presenters Steve Brady –CFI of Year –FAA ORL –ATP –EAA Young Eagle Presenter.
NBAA Conference - Friends/Partners Aviation Weather (FPAW)
Presented to: By: Date: Federal Aviation Administration Federal Aviation Administration Topic of the Month August Fly the aircraft First.
Ohio Aviation Association Airport Airspace Zoning Ohio Airports Conference April 12 and
PRESENTATION TO: CITRUS COUNTY BOARD OF COUNTY COMMISSIONERS 11 AUGUST 2015 INVERNESS AIRPORT MASTER PLAN UPDATE.
Port of Bellingham Briefing BELLINGHAM INTERNATIONAL AIRPORT MASTER PLAN BRIEFING April 2014.
Environmental Impact Statement (EIS) August 6, 2008
Airport Planning.
CY 2017 Goals and Objectives
Pierre Regional Airport Master Plan Update
Presentation transcript:

Vance Brand Municipal Airport Airport Master Plan

Based Aircraft Forecast

Runway Length Guidelines AIRPORT AND RUNWAY DATA Airport elevation . . . . . . .. . . . . . 5055 feet Mean daily maximum temperature of the hottest month 88.00 F. Maximum difference in runway centerline elevation . . 24 feet EXISTING RUNWAY LENGTH  . . . . . . .. . . . . . . . 4800 feet RUNWAY LENGTHS RECOMMENDED FOR AIRPORT DESIGN  Small airplanes with less than 10 passenger seats 75 percent of these small airplanes . . . . . . . . 4610 feet 95 percent of these small airplanes . . . . . . . . 6200 feet 100 percent of these small airplanes . . . . . . . .6360 feet Small airplanes with 10 or more passenger seats . . . 6360 feet   Large airplanes of 60,000 pounds or less 75% of large airplanes at 60% useful load 6860 feet Source: FAA software.

Preliminary Alternatives Alternative 1 – Do-Nothing (Maintain 4,800’ length) Alternative 2 – Extend runway to 6,360’ Alternative 3 – Extend runway to 6,860’

Final Alternatives Alternative 1 – Do-Nothing (Maintain 4,800’ length) Alternative 4 – Extend to 5,650’ (adds 850’ fully usable length and does not relocate N. 75th Street) Note: Alternatives 2 and 3 were eliminated from further consideration by vote of the Airport Advisory Board. Alternative 4 was added following the first public information meeting and third regular meeting of the AAB.

Alternative 1: Do Nothing

Alternative 4: Extend Runway (adds 850’ fully usable length)

Evaluation Criteria Safety Ability to meet aviation needs Airspace Surface Access Environmental Factors Availability of Utilities Land Requirements Costs Community Compatibility Local Acceptability

Evaluation Results Safety: Alternative 1 does not address the needs of larger aircraft types that currently use the airport e.g., Cessna Citation Bravo, KingAir 90, etc. Alternative 4 provides additional distance for take-off, landing, and emergency operations.

Evaluation Results Meet Aviation Needs: Alternative 1 (current length 4,800’) meets the needs of 75 percent of small airplanes with <10 passenger seats. Alternative 4 provides (length of 5,650’) nearly 90 percent of the runway length recommended for these small airplanes.

Evaluation Results Airspace: Alternative 1 does not alter existing airspace requirements. The change imposed by Alternative 4 is to small to cause any major disadvantage.

Airport Influence Area: Do-Nothing and Alternative 4

Evaluation Results Surface Access: Neither Alternative requires an disruption of the surface access system, notably North 75th Street, in the area of the airport.

Evaluation Results Environmental Factors: Alternative 1 enjoys an advantage because it does not require any development. Alternative 4 would generate construction impacts (dust, etc.) that will need to be mitigated. Alternative 4 will also require land acquisition (approx. 27 acres and relocation of one affected owner. Noise exposure exceeding 65 Ldn would not extend beyond proposed airport land and easements.

Evaluation Results Availability of Utilities: The alternatives are considered equal with respect to this criterion. Neither will impose significant new requirements.

Evaluation Results Land Requirements: Alternative 1 does not require land acquisition. Acquisition of avigation easements would be recommended. Fee simple acquisition of approximately 27 acres and one residence would be recommended under Alternative 4.

Evaluation Results Costs: Alternative 1 does not require capital expenditures for runway extension. Estimated costs for Alternative 4 are $2.4 million ($2.16 FAA; $120,000 state; and $120,000 local)

Evaluation Results Community Compatibility: Alternative 4 requires no zoning or land use changes and community compatibility impacts are minimal. It requires no zoning or land use changes. Alternative 1 has no additional compatibility effects.

Evaluation Results Local Acceptability: Alternative 1 is preferred by opponents of airport expansion. Alternative 4 is a compromise generating less opposition than more ambitious runway extension alternatives.

Conclusions Alternative 1 imposes fewer impacts because it makes no improvements. Alternative 4 addresses aviation safety for airplanes that use the airport now and in the future. Consultant’s and AAB’s recommendation: Alternative 4.

South Side Airport Development Current and Proposed Master Plan

VANCE BRAND AIRPORT DEVELOPMENT Compatible Commercial Development Options: Aviation Manufacturing Operations Non-Aviation Manufacturing Operations Community College Aviation Technical School Aviation Paint Shop Aircraft Maintenance Facility

VANCE BRAND AIRPORT DEVELOPMENT Compatible Commercial Development Options: Aircraft Restoration Service Fixed Base Operator Avionics Repair Facilities Commercial Restaurant Aviation Related Service Operations

South Side Airport Development Current and Proposed Master Plan FRCC CAMPUS (30 acres)

Airport Noise Abatement Procedures: Updated in 2002.

New Procedures Include: Traffic pattern altitude 6,050 MSL (raised 150 feet) Pilots should climb to at least 500 hundred feet AGL after takeoff before turning crosswind. Pilots are requested to avoid making touch and go landings at the Longmont Municipal Airport before 8AM and after 8 PM. Avoid flying over the city and outlying residential areas as much as possible.

Airport Master Plan Summary and Notes: The Airport Master Plan is a planning tool to help guide the future of the airport for all aspects of aviation and community needs. This is a ten-year plan that will be updated again in the future. The projects contained in the Airport Master Plan are unfunded at this time.

Airport Master Plan Schedule: Staff and AAB to receive City Council direction on January 7, 2003. Approximately 6 weeks for completion of final draft. Final “Draft” of the Master Plan with the Council chosen options to be presented in March 2003. Anticipate adoption of final Master Plan by Resolution in April 2003.