AVS 3220 INTERNATIONAL AVIATION

Slides:



Advertisements
Similar presentations
PROVING FLIGHTS.
Advertisements

Presented to: COSCAP SA By: Aaron E. Wilkins III / Ajay Kumar Date: April 2011 FAAs Presence in South Asia An Overview of Technical Assistance Provided.
A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Critical Infrastructure Protection and Continuity of Operations A Look at Asset Protection in the Airport Environment May 1, 2013.
Commuter Operations Tradewind Aviation.
The Next Generation Air Transportation System Future of Airports and Aviation 29 th Annual Airports Conference March 1, 2006.
Jim Rezich A&P, I.A. ATP DAR Introduction to Ejection Seat ownership.
1 Denver International Airport Ken Greene Deputy Manager of Aviation Airport Operations June 10, 2014.
Yakima Air Terminal/McAllister Field Master Plan Airport Board Briefing May 21, 2012 YAKIMA AIR TERMINAL | McALLISTER FIELD | Yakima, WA 1.
Continuous Climb Operations (CCO) Saulo Da Silva
Runway Incursion’s Affect on FAA Approved Pilot Training and Pilot and Flight Instructor Certification and Part 121 Pilot Checking – Andy Edwards – Manager.
Instrument Ground Training Module 4 & 5
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Sabre Airline Solutions
AMR Proprietary and Confidential FAA Compliance Training.
Air Transportation A Management Perspective
Textbook Reviews By Aj.Weerawit Lertthaitrakul Logistics & Supply chain management Business Administration Air Transportation A Management Perspective.
Date: 18 February 2008 Federal Aviation Administration Collaborative Decision Making at the FAA/ATO A look at how CDM is applied in the U.S.
The Maintenance and Engineering Organization
Special Topics Introduction to Aeronautical Engineering
UNITED AIRLINES LEONARD J. SALINAS FLIGHT DISPATCH 21APR2010 Congressional Hazards Caucus Alliance.
Chapter 5:intrument flight rules
Community Preparedness & Disaster Planning. Why Disasters occur ?
Office of Aviation Safety Emergency Medical Services (EMS) Aviation Operations Jeff Guzzetti Deputy Director for Regional Operations.
FLIGHT OPERATIONS AND SPACE WEATHER MIKE STILLS MANAGER INTERNATIONAL OPERATIONS UNITED AIRLINES FLIGHT DISPATCH 21JUNE11.
Module 3 Develop the Plan Planning for Emergencies – For Small Business –
Parts Part 1 – Definitions/Abbreviations Part 21 – Certification Procedures for Products/Parts Part 43 – Maintenance, Preventative Maintenance, Rebuilding,
Presented to: 2012 Pacific Aviation Director’s Workshop, Guam By: Juan S.A. Reyes, A.C.E., ACSI Date: March 13-15, 2012 Federal Aviation Administration.
FAA Guidance Material Polar Operations Establishes a uniform process to validate all operations Documents requirements for polar operations Identifies.
WHAT IS THE STATE OF INTERNATIONAL CIVIL AVIATION SECURITY IN THE POST 9/11 WORLD? 2011 Sam Nunn Security Fellows.
(MEP) Safety Forum in Riga Essential Elements: Thorough flight preparation, including: Training lesson / examination session planning (Flight Plan, sequence.
Background, Purpose, and Value of Exercises. 9/11 has changed water system security requirements Continued training for intentional incidents is critical.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
1 World Dispatch Summit Toronto, Canada May 2002 ETOPS Presentation Ralph Webster Transport CanadaTransports Canada Safety & SecuritySécurité et sûreté.
AIRTANKER BASE MANAGER (ATBM).
Office of Aviation Safety Pinnacle Airlines Flight 3701 Jefferson City, Missouri Lorenda Ward Investigator-in-Charge.
Federal Aviation Administration Presented to: 2008 US/Europe International Aviation Safety Conference By: Robert W. Reich, Asst Manager (Operations), Seattle.
The Aircraft Dispatcher “One stop shopping” source of information for the pilot.
Federal Aviation Administration TAIWIN By: Jim Riley, ANG-E282 To: Icing Wx Tools Meeting Date: 11/19/13 – 11/21/13.
Reducing Emissions through Operational Efficiency Capt. Russell Davie Cathay Pacific Airways.
Presented to: By: Date: Federal Aviation Administration Noise 101: Federal Noise Laws and Regulations Town of Payson M.L. Chittick, Scottsdale FSDO January.
Enhanced Airworthiness Program for Airplane Systems (EAPAS) Presented by: Massoud Sadeghi FAA - Aging Systems Program Manager EAPAS Workshop November 2002.
Sun-n-Fun 2001 Steve Shaffer National Runway Safety Program Steve Shaffer National Runway Safety Program April 13, 2001.
LECTURE 4: ICAO CHART requirements
Space Weather and Delta’s Polar Routes. DELTA AIR LINES, INC. Polar Routes and Fixes ABERI DEVID RAMEL NIKIN ORVIT.
FUTURE OF AIRPORT MANAGEMENT 1. Though, we cannot predict precisely what airport management be in next 100 years, but it will evolve with changes in technologies,
FlightSafety Academy Professional Flight Training.
FAA sUAS ARC Support Documentation © ASTM International. All Rights Reserved. The Unmanned Aircraft System Initiative F38 on Unmanned Aircraft Systems.
Maintenance RAST Conclusions 15 June Maintenance Procedures SE-17, SE-18, SE-19, SE-20 Output 1 (SE-17)  FAA will issue guidance, to their field.
Federal Aviation Administration 1 Collaborative Decision Making Module 5 “The Collaborative Environment”
Office of Aviation Safety Pinnacle Airlines Flight 3701 Jefferson City, Missouri Operational Factors Captain David Tew.
Zuliana-July Lecture 1: INTRODUCTION AIRCRAFT MASS (WEIGHT) & PERFORMANCE By: Zuliana Ismail, 2010.
PRESENTATION PREPARED FOR IRC INTERNATIONAL CONFERENCE DUBAI, DECEMBER 2014 Dr. Alexandrina Maria Pauceanu STRATEGIES FOR IMPROVING.
Federal Aviation Administration Presented to: OSWG Presented by: Chris Hope Date: March 9, 2016 ILS Performance Classification OpSpec C061.
Emergency Preparedness. Proposed Emergency Preparedness Rules NFR/LMC §19.326(a) deleted and moved to § for Emergency Preparedness Rules Places.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
AIR TRAFFIC ONTROL.
Collaborative Decision Making Module 5 “The Collaborative Environment”
AIRCRAFT MASS (WEIGHT) & PERFORMANCE
MGMT 203 Aerodynamics from a Management Standpoint
Continuous Climb Operations (CCO) Saulo Da Silva
Airport Planning.
Oceanic and International Operations
AIRLINE TRANSPORTATION AERO 4100 / 5100
Continuous Climb Operations (CCO) Saulo Da Silva
ETOPS PRESENTATION p1 TM-2.
Oceanic and International Operations
Presentation transcript:

AVS 3220 INTERNATIONAL AVIATION Problems and Promises in the International Air Transportation. Cross-Polar International Air Routes.

African Problems Addressing the issues Poverty Investment Infrastructure Airlines Domestic demand Addressing the issues Yamoussoukro Declaration Integration of markets *Privatization Safety improvements

Latin American Problems Competition with U.S. carriers Biased bilaterals Privatization and liberalization? Infrastructure Safety and Category II status Caribbean nations market size

Turbulence in the Middle East Mostly international travel Large number of passengers High population density Money for infrastructure improvements Limiting factor Instability and conflict

International Actions Asymmetric liberalization Flexibility in capacity and gauge Trial periods Gradual introduction Waiver of nationality/ownership Special leasing arrangements Liberal slot and national policies

National Actions Regional integration Privatization Safety and Infrastructure Training Fleet modernization Supporting Industries

Cross-Polar Flight Operations The official opening of cross-polar routes in February 2001marked an important step in air travel between North America and Asia. These new routes offer time, fuel, and environmental advantages over conventional routes and allow nonstop service between new city pairs. Operations are similar in many ways to conventional long-range routes. After two and one-half years and more than 650 demonstration flights, airlines have obtained the experience and planning tools to make polar operations routine. The U.S. Federal Aviation Administration (FAA) requires U.S. operators to obtain specific approval to conduct polar operations. The approval process validates airlines’ preparedness to conduct such operations.

Great Circle Routes in the North Pole Area

Area of North Polar Operations

The FAA Information Memorandum Guidance for Polar Operations (March 5, 2001) outlines 10 issues: Airport requirements for designation as en route alternates. Airline recovery plan for passengers at diversion alternates. Fuel freeze strategy and monitoring requirements. Communication capability. Minimum equipment list considerations. Airline training Long-range crew requirements Dispatch and crew considerations during solar flare Special equipment Validation requirements for area approval

En Route Alternate Airports The availability of alternate airports along a route is an important part of ensuring flight safety. Though much attention is paid to the very rare case of an in-flight engine failure, the vast majority of diversion causes are not engine related. It is very important, therefore, for all airplanes, regardless of the number of engines, to consider the availability and suitability of emergency alternate airfields. Considering this and the remote nature of cross-polar operations, the FAA has developed specific requirements regarding en route alternates on the polar routes.

Polar Route Alternate Airports

The FAA Requirements for Alternate Airport Capabilities A diverting airplane can land safely at the airport given the existing run-way length, width, and load-bearing capacity. The diverted airplane can be cleared from the runway so that another air-plane can land with maintenance personnel or depart with the passengers. Passengers and crew are able to deplane in a safe manner. Facilities at or near the airport can provide passengers with shelter and food while the airplane can be repaired or until alternate transportation can be provided. The recovery plan can be executed and completed within 12 to 48 hr after diversion.

Airline Recovery Plan at Diversion Alternates All operators must have an FAA-approved recovery plan for unplanned diversions. The recovery plan should address the care and safety of passengers and crew at the diversion airport and provide a plan to transport passengers and crew from that airport. Operators should be able to demonstrate their ability to launch and conduct the recovery plan on their initial applications for polar route approval. Operators must maintain the accuracy and completeness of their recovery plans as part of their annual audits.

Fuel Temperature and Crew Actions In consultation with airline dispatch and air traffic control, the flight crew decides on a plan of action: changing the flight plan to where warmer air can be expected; descent to a lower altitude within 3,000 to 5,000 ft of optimum altitude; in more severe cases, a descent to 25,000 ft might be required; the temperature may be higher at higher altitudes, in which case a climb may be warranted; increase of airplane speed; an increase of 0.01 Mach results in a TAT increase of 0.5° to 0.7°C.

Polar Route Radio Communications

Minimum Equipment List Considerations For polar operations dispatch, operators’ minimum equipment lists (MEL) must include the following: A fuel-quantity-indicating system that includes temperature indication. For two-engine airplanes, an auxiliary power unit (APU) that includes electrical and pneumatic supply to its designed capability. An autothrottle system. Flight crew communication systems that satisfy the FAA requirement for effective communication capability. An expanded medical kit with automated external defibrillators.

Airline Personnel Training Operators must meet five requirements for their training programs: 1. Training for flight crews and dispatchers on queen's field elevation (QFE), queen's normal height (QNH), and meter/feet altimetry as well as cold-temperature altitude correction procedures. 2. Special curriculum segments on cold fuel management procedures for maintenance, dispatch, and flight crews. 3. Route-specific training on weather patterns. 4. Instructing maintenance personnel to provide information on airplane system capabilities to dispatch and flight crews, which will aid flight crews in diversion decision-making. 5. The use of cold-weather anti-exposure suits.

Long-range Crew Requirements Consistent with all long-range operations, operators must have approved crew rest plans and a clear progression of pilot-in-command authority. Dispatch and Crew Considerations during Solar Flare Operators should be aware of the content of FAA Advisory Circular (AC) 120-52, Radiation Exposure of Air Carrier Crewmembers, and provide crew training as stated in AC 120-61, Crewmember Training on In-Flight Radiation Exposure. Special Equipment The FAA requires a minimum of two cold-weather anti-exposure suits on board North Polar flights so that outside coordination at a diversion airport can be accomplished safely.

Validation Requirements for Area Approval Operators are required to conduct an FAA-observed validation flight and reaction-and-recovery plan for a simulated airplane diversion at one of the designated en route alternate airports. The flight and plan implementation may be conducted together or separately. If the reaction-and-recovery plan is completed before the validation flight, the validation flight may be conducted as a revenue flight.