Certification of ICAO compliant GBAS Cat-I in Australia

Slides:



Advertisements
Similar presentations
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Advertisements

Session No. 3 ICAO Safety Management Standards. The Big Picture Two audience groups Two audience groups States States Service providers Service providers.
The Future Air Traffic Control System Presented by: Geoffrey BaileyKors van den BoogaardDon Willis EurocontrolInternational Air Transport AssociationU.S.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
GLOBAL ink VHF Digital Link Mode 2 Progress Report to ICAO AMCP WG-M/2
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
U.S. Plans for ADS-B Briefing for
FANS (Future Air Navigation System) Flight Crew Procedures
Satellites –part of the solution for global Air Traffic Management An Airbus view Peter Potocki de Montalk – Director, Air Traffic Systems 3 March 2006.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
GROUND BASED AUGMENTATION SYSTEM System Overview Christophe DEHAYNAIN Direction Générale de l’Aviation Civile FRANCE.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
ADS-B Seminar and 11th Meeting of ADS-B SITF
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Performance-based Navigation Honeywell SmartPathTM
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
Report on New Technologies ACI TSSC May New Technologies  The emerging technologies for aircraft management and surveillance offer significant.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Federal Aviation Administration Navigation Services Overview Briefing to Air Traffic Management Bureau of the Civil Aviation Administration of China (CAAC)
Regulatory Plan to support the future ATM system in Australia UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10.
Federal Aviation Administration GPS Augmentation Systems Status Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) September 2009.
A ERODROME T RAINING M ODULE 5 P ART 2 Electronic Navigation Aids.
1 FAA New Technologies Workshop III 9 January 2007 “Making Ground Based Landing Systems a Reality” Keith McPherson Manager GNSS FAA New Technologies Workshop.
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
CGSIC Manchester 7 May 2006 Presented by John Wilde for Keith McPherson Manager GNSS Presented by John Wilde for Keith McPherson Manager GNSS Beta GBAS.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
Air Berlin discovers GLS Marc Altenscheidt
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
European Commission International Civil Aviation Organization Status of industry standards for GNSS CAR/SAM ATN/GNSS Seminar Varadero, Cuba, 6 to 9 May.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
GROUND-BASED AUGMENTATION SYSTEM Airservices Australia Australian airspace GROUND- BASED AUGMENTATION SYSTEM (GBAS) Presented by Keith McPherson Manager.
Satellite Navigation Program Federal Aviation Administration.
GNSS Aviation Applications
Transportation Applications: Now and Future Session 1: Overview: GNSS-Based Application Areas United Nations/Zambia/ESA Regional Workshop on the Applications.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
ICAO Requirements on Certification of Aerodromes Module - 2
Michael Underwood Director, Business Development
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
1 2 nd Australian based CGSIC Meeting Ground based Regional Augmentation System (GRAS) Keith McPherson, Manager GNSS.
Federal Aviation Administration 0 GPS, WAAS, GBAS Overview March 8, GPS Integrity RAIM, WAAS, and GBAS: Concepts and Status Federal Aviation Administration.
Lecture 7: Global Positioning System (GPS)
Federal Aviation Administration Newark Project Overview January 2009.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Complex Procedure Development Plan
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Lecture 8: INSTRUMENT LANDING SYSTEM (ILS)
SmartPath® Ground Based Augmentation System (GBAS) A New Era in Precision Navigation.
Presentation to US Space-Based PNT Advisory Board
1 Introduction of EGNOS operations: the perspective of an Air Navigation Service Provider METIS Workshop Benefits of EGNOS in Civil Aviation Istanbul 18.
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
FAA NAVAID Rationalization / Resiliency Overview
UPDATE ON CASA RULEMAKING IN THE YEAR SINCE SITF/10
ADS-B OUT - IATA VIEW ADS-B SITF/11 – Jeju, Korea 24 – 27 April 2012
Workshop on preparations for ANConf/12 − ASBU methodology
CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization
Presentation transcript:

Certification of ICAO compliant GBAS Cat-I in Australia Keith McPherson Manager GNSS Keith.mcpherson@airservicesaustralia.com

ICAO Document “A32-19: Charter on the Rights and Obligations of States Relating to GNSS Services” ………. 2. Every State and aircraft of all States shall have access, on a non-discriminatory basis under uniform conditions, to the use of GNSS services, including regional augmentation systems for aeronautical use within the area of coverage of such systems. 4. Every State providing GNSS services, including signals, or under whose jurisdiction such services are provided, shall ensure the continuity, availability, integrity, accuracy and reliability of such services, including effective arrangements to minimize the operational impact of system malfunctions or failure, and to achieve expeditious service recovery.

Technology Overview NPA 400-600ft GRAS 250ft GBAS 200ft GRAS Transmitters Sydney Airport Regional Airport Increased safety, accuracy & integrity More efficient approaches Reduced infrastructure & real estate Increased Guided missed approaches Increased Integrity Supports ADS-B - accurate surveillance Assists UPR & UPT Mixed Mode operation with RNP Guided Departures Situational Awareness Accurate departure tracks Environmental saving

GBAS System Ground Based Augmentation System GBAS Features GBAS is Airport Based GRAS Regional System GBAS Features Replaces ILS Covers all runway ends Curved approaches Terrain Issues Environmental Reduced real estate More stability Less signal Interference Less maintenance

Equipment on the Hook at Sydney Airport GBAS Cat-1 Sydney Equipment on the Hook at Sydney Airport

The “Hook” at Sydney airport extending into Botany Bay GPS Reference Receiver Antennas VHF Data Link Antenna GLS Facility Shelter The “Hook” at Sydney airport extending into Botany Bay

GBAS Cat-1 Equipment

GLS – Primary Flight Display 4000 GLS CMD G/S LOC SPD 1200 140 GMWH /220o RW22C 4.4

GLS – Radio Tuning Panel

GLS – FMS Selection

Multiple Approach Capability of GBAS 80 Multiple Approach Capability of GBAS

Current Status GBAS Cat-I ICAO GBAS Cat-I SARPs already issued Approved ICAO compliant system in Australia (Part 171 change) in 2008 at Sydney International Airport Strong support from international airlines Qantas, Lufthansa, Fedex, Continental Air Micronesia Sydney Beta GBAS Cat-I – installation completed October 2005 Sydney Beta GBAS Cat-I – first broadcast 29 October 2005 DFS Germany has a beta GBAS Cat-I (Frankfurt, soon Bremen) AENA Spain has a beta GBAS Cat-I (Malaga) Memphis Tennessee has beta GBAS Cat-1 Global reach of GBAS Cat-I is increasing Goal - gate to gate precision navigational service for aircraft

B-737NG GLS Certification Status Certification Flight Test Verification, validation complete Demonstrated at SeaTac & Moses Lake using Beta LAAS Operations (including automatic landings) demonstrated at adjacent airports: Ephrata, Boeing Field & Paine Field Test airplane flown against FAA prototype ground station at Rio de Janeiro (Galeao) with approaches to adjacent airport (Santos Dumont) QANTAS - 9 B-737NG with GBAS Cat-1 avionics - 24 B-737s may be retrofitted with GBAS Cat-1 avionics Boeing and Airbus plan to introduce GLS on all forward fit aircraft and retrofit where cost effective

A-380 GLS Certification Status QANTAS will take delivery of 12 x A-380s with GBAS Cat-I avionics Other Airbus aircraft to be procured will be fitted with GBAS Cat-I avionics Boeing B-737NG, B-787, B-777 (New), B-747-8 will all gave GBAS Cat-1 as standard avionics fitment

Australian Augmentation Experience LAAS SCAT-1 Melbourne Airport (Honeywell SLS-2000) LAAS SCAT-1 Canberra Airport (Raytheon DIAS-3100) LAAS SCAT-1 Avalon Airport (Honeywell SLS-2000) LAAS SCAT-1 Norfolk Island (Honeywell SLS-2000) GBAS CAT-1 Sydney Airport (Honeywell SLS-3000)

ICAO Compliant GBAS Cat-I in Australia Airservices Australia negotiated with Honeywell International to bring an ICAO compliant GBAS Cat-I to completion Approximately 22 months to complete RTCA DO-178B/278 compliant software – commenced 10 April 2006 Approximately 6 months of certification Civil Aviation Safety Authority involved from Day 1 Aim is to have CASA approve Part 171 change to allow operation of completed system by 3rd quarter 2008 or earlier Germany, Spain and USA offered to assist and those offers were accepted. GNSS Technical Memorandum of Cooperation signed with FAA 9 February 2006

2nd Last Message New aircraft are being fitted with GBAS Cat-I avionics B-737s will be retrofitted with GBAS Cat-I avionics Qantas has taken the lead internationally GBAS Cat-I is HERE and it is HERE to STAY 73% of the world’s airports are GBAS Cat-I (IATA study) GBAS Cat-I offers more than ILS Legacy aircraft will be around for a long time and SOME ILS will remain but not as many

No single augmentation system provides a global answer – Final Message: No single augmentation system provides a global answer – There is a synergy between, and a need for, all four ICAO augmentation systems

Thank you