Shahab Hasan, Principal Investigator Rosa Oseguera-Lohr, NASA Langley, Technical Monitor Dou Long, George Hart Mike Graham, Terry Thompson, Charles Murphy.

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

Chapter 7 System Models.
Part 3 Probabilistic Decision Models
UNITED NATIONS Shipment Details Report – January 2006.
Scalable Routing In Delay Tolerant Networks
Flight Operations.
Module N° 6 – SMS regulation
NextGen and Its Impact on Performance Worldwide Symposium on Performance of the Air Navigation System ICAO Montreal, Quebec, Canada March 26-30, 2007 Victoria.
1 NAS Performance and Analysis: The Role of the Airspace Laboratory Airspace Laboratory May 2002 Toulouse, France.
1 NEXTOR Monitoring and Modeling NAS Performance at the Daily Level Mark Hansen Performance Metrics TIM May 2002.
Development and Validation of Simulation Metrics FAA-EUROCONTROL Technical Interchange Meeting Performance Metrics in Air Traffic Management Toulouse,
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
1 Performance indicators, targets, steering Technical Interchange meeting Toulouse, May 2002 Xavier FRON Head Performance Review Unit.
Measurements and Their Uncertainty 3.1
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Evaluating Provider Reliability in Risk-aware Grid Brokering Iain Gourlay.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
Webinar: June 6, :00am – 11:30am EDT The Community Eligibility Option.
© 2010 The MITRE Corporation. All Rights Reserved. Sector Capacity Prediction for Traffic Flow Management Lixia Song April 13 th, 2010.
CHARLES N. GLOVER MICHAEL O. BALL DAVID J. LOVELL Collaborative Approaches to the Application of Enroute Traffic Flow Management Optimization Models.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Solve Multi-step Equations
Week 2 The Object-Oriented Approach to Requirements
Pole Placement.
Traffic Analysis Toolbox & Highway Capacity Manual Transition
Chapter 5 – Enterprise Analysis
Effective Test Planning: Scope, Estimates, and Schedule Presented By: Shaun Bradshaw
Chapter 18 Methodology – Monitoring and Tuning the Operational System Transparencies © Pearson Education Limited 1995, 2005.
Air Traffic Analysis, Inc Using WITI for Airport Arrival Performance Analysis A report on work-in-progress December 2010.
Testing Workflow Purpose
By: Tony Diana, Date: September 19, 2005 File: apo130\ASPMDocs\ASPM Presentation 05.ppt Federal Aviation Administration Presentation of the.
Modeling Airport Capacity
Capacity Planning For Products and Services
Environmental Impact Assessments: A Statistical Encounter Dave Saville Saville Statistical Consulting Ltd P O Box Lincoln 7640 New Zealand.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR DXXX-1A AI Planning at airports:Departure Management PLANET Industry Day.
Discrete Event (time) Simulation Kenneth.
- European CDM - Collaborative Departures Sequencing Optimising departure sequence according to the priorities of Airline and Airport as well as Tower.
Project Management from Simple to Complex
Project Scheduling: Lagging, Crashing, and Activity Networks
Target Costing If you cannot find the time to do it right, how will you find the time to do it over?
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Quantitative Analysis (Statistics Week 8)
© 2012 National Heart Foundation of Australia. Slide 2.
Forecasting using Discrete Event Simulation for the NZ Prison Population Dr Jason (Qingsheng) Wang Mr Ross Edney Ministry of Justice.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Functional Areas & Positions
Chapter 10: The Traditional Approach to Design
Systems Analysis and Design in a Changing World, Fifth Edition
Fundamentals of Cost Analysis for Decision Making
ICAO Environment Tools
PSSA Preparation.
Testing Hypotheses About Proportions
Mani Srivastava UCLA - EE Department Room: 6731-H Boelter Hall Tel: WWW: Copyright 2003.
Aircraft Emissions Reductions Through Improved Operations En-Route and Around Terminal Areas Bruno Miller John-Paul Clarke JUP Meeting Princeton University.
LMI Airline Responses to NAS Capacity Constraints Peter Kostiuk Logistics Management Institute National Airspace System Resource.
A Perspective on NASA Ames Air Traffic Management Research Jeffery A. Schroeder Federal Aviation Administration* * Formerly NASA Ames.
CVG 2005 Restructuring Overview Largest one-time restructuring of CVG hub set in motion to return hub to profitability and “right-size” to local market.
Federal Aviation Administration ATO Future Schedule Generation Performance Analysis and Strategy January 27, 2010.
LMINET2: An Enhanced LMINET Dou Long, Shahab Hasan December 10, 2008.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Federal Aviation Administration System Airport.
Ames Research Center 1 FACET: Future Air Traffic Management Concepts Evaluation Tool Banavar Sridhar Shon Grabbe First Annual Workshop NAS-Wide Simulation.
F066-B Public Release No.: © 2010 The MITRE Corporation. All rights reserved. Demand Generation for System-wide Simulation Glenn Foster MITRE.
EUROCONTROL European Organisation for the Safety of Air Navigation.
COLLABORATIVE DECISION MAKING
Joint Planning & Development Office Evaluations & Analysis Preliminary Scenario Analyses Strategy Assessment to Provide a Basis for Prioritizing Investments.
NY/NJ/PHL Metropolitan Area Airspace Redesign Record of Decision (ROD) Announcement Congressional Briefing Name: Steve Kelley Date: September 5, 2007 Federal.
Federal Aviation Administration Data Communications Program Final Investment Decision (FID) – Update on May 30, 2012 Presented to:SC-214/WG-78 Plenary.
Federal Aviation Administration Integrated Arrival/Departure Flow Service “ Big Airspace” Presented to: TFM Research Board Presented by: Cynthia Morris.
Airports Division Great Lakes Region Overview of Airfield Capacity
Presentation transcript:

Shahab Hasan, Principal Investigator Rosa Oseguera-Lohr, NASA Langley, Technical Monitor Dou Long, George Hart Mike Graham, Terry Thompson, Charles Murphy January 28, 2010 Integrated Analysis of Airport Capacity and Environmental Constraints

P A G E 2 Task Objective Identify and rank key factors limiting the achievement of NextGen goals Identify capabilities required and gaps in available tools for conducting system-level trade and benefit studies Results will help prioritize NASAs research to enable NextGen

P A G E 3 Overview of Subtasks 3. Develop List of Critical Airports 1. Develop Scenarios 2. Develop Metrics 4. Analyze Airportal Capacity Constraints 5. Analyze Airportal Environmental Constraints Runway Constraints Taxiway Constraints Gates Constraints Fuel Constraints Emissions Constraints Noise Constraints

P A G E 4 Overview of Subtasks Subtask 1: Develop Set of Scenarios –2015 and 2025 flight schedules, generated by FAA, used by JPDO –NextGen capacities developed and used by JPDO Subtask 2: Develop Set of Metrics –Throughput is our primary metric –Delay is also used for assessing the robustness of future operations Subtask 3: Develop Set of Critical Airports –110 large airports with capacities used in prior LMI analyses plus 200 additional airports with capacities developed by the team The next largest airports from NPIAS with consideration of infrastructure, location relative to major metropolitan area or airport, and traffic mix –Total of 310 airports –98.6% of air carrier operations, 99.8% of air carrier enplanements

P A G E 5 OEP 35 Airports

P A G E 6 FACT 56 Airports

P A G E 7 LMI 110 Airports

P A G E 8 LMI 310 Airports

P A G E 9 One-Off Constraint Analysis Methodology Estimate the effect of one constraint by assuming there is no other constraint, at each of the critical airports Capacity constraints –Runway capacity –Gate capacity –Taxi capacity Environmental constraints –Fuel burn targets –Local NOx targets –Noise targets Method: Trim flights from the unconstrained demand schedule to satisfy the constraint

P A G E 10 Subtask 4.1: Analyze Airport Capacity Constraints (Runways) Runway Capacity Analysis at 310 Critical Airports We assume no change to the airport capacities at the smaller 200 airports –Likely cost prohibitive for NextGen deployment For the 110 larger airports, their capacities can be increased by –New runways –NextGen technologies One primary airport runway configuration for each meteorological operating condition Airport runway configurations based on analysis of FACT2 and FAA configurations, airport diagrams, capacity data, procedure charts, and knowledge from prior tasks

P A G E 11 Subtask 4.2: Analyze Airport Capacity Constraints (Taxiways) Methodology Three-pronged approach for taxiway constraint analysis: 1.Airport Elimination – establish a conservative lower bound for taxi capacities at 310 critical airports It is very difficult to determine the exact taxiway capacity for a given airport – by establishing a lower bound for taxiway capacity and comparing it to peak demand, we can determine with confidence whether the airport will be taxi-constrained 2.Configuration Analysis – determine if airports are unlikely to have taxi capacity shortages based on their layout and configuration Taxi capacity can be determined not to be a constraint if the airport is laid out or operated in such a way that runway/taxiway interaction is minimal 3.Event simulation models at most of the OEP 35 airports Simulation is well-suited to modeling the complex surface interactions between aircraft, however building simulations for all 310 airports would be too time consuming for this task

P A G E 12 Subtask 4.2: Analyze Airport Capacity Constraints (Taxiways) Approach 1: Airport Elimination Method Goal: determine those airports whose demand levels are so low that they will never encounter delays due to taxiway constraints Approach: transform each airport into an abstracted generic inefficient airport by making the following assumptions: 1.Airport has only 1 active runway and that all operations take place on this runway 2.All traffic must taxi across this runway at a single crossing point in order to takeoff or arrive at the terminal 3.Each runway operation requires the closing of the runway and runway crossing for 60 seconds 4.Each runway crossing takes 30 seconds

P A G E 13 Subtask 4.2: Analyze Airport Capacity Constraints (Taxiways) Approach 2: Configuration Analysis Taxiway delay is believed to be caused by interaction between the taxiways and the runways Therefore, if an airport consistently operates under a configuration (at least 60% of the time) that does not include this interaction, taxiway delay at the airport will be minimal We used airport configuration data from the FAAs 2004 Airport Capacity Benchmark study and from ASPM (limited to the 77 airports covered by ASPM) All of the OEP 35 airports were either eliminated using this approach or simulated explicitly (Approach 3, next slide)

P A G E 14 Subtask 4.2: Analyze Airport Capacity Constraints (Taxiways) Approach 3: Simulation of Taxi Operations Arena simulation models for 20 of the OEP 35 Airports –ATL, BOS, CLE, CLT, CVG, DCA, DFW, EWR, HNL, LAS, LAX, LGA, MCO, MDW, ORD, PHX, SAN, SEA, SLC, and STL –Airports modeled using their most common configuration according to FAAs 2004 Airport Capacity Benchmark Models differentiate between delay caused by runway congestion and delay caused by taxiway congestion Simulations use an iterative approach, trimming flights when delays exceed tolerances (individual flight delay > 15 mins)

P A G E 15 Subtask 4.2: Analyze Airport Capacity Constraints (Taxiways) Taxiway Capacity Model Example: ORD Arrivals Departures Taxiway/Runway Crossing Points

P A G E 16 Subtask 4.3: Analyze Airport Capacity Constraints (Gates) Gate Capacity Model Summary LMI developed a new, Java-based model to model gate capacity and demand Model execution time is less than 10 minutes Calculate each airports gate availability over time using –Gate Capacity: the airports total number of gates –Gate Demand: a schedule of arrivals and departures of aircraft requiring gate access –Reference Point: a known number of aircraft at the gates at some point in time The model focuses on gates with passenger bridges The model analyzes all 310 airports, identifies those that are gate constrained, and determines what percentage of flights that would need to be trimmed in order for the airport to remain under capacity

P A G E 17 Subtask 4.3: Analyze Airport Capacity Constraints (Gates) Model Execution: Trimming Flights Flight trimming takes place between 5:30 AM and 11:00 PM local time. –Flights arriving outside of this window are not subject to gate constraints –This policy is designed to account for airports practice of shuffling aircraft off the gates and into remain-overnight parking areas when gate space is limited If gate capacity is exceeded, we create an alternative arrival schedule: –Any arrival that would bring the total number of aircraft on the ground over the airports limit is trimmed from the schedule –A corresponding future departure is also removed from the departure schedule We record the total number of arrivals trimmed, as well as the resulting arrival acceptance rate

P A G E 18 Subtask 4.3: Analyze Airport Capacity Constraints (Gates) Model Execution 1.Calculate the reference number of aircraft at the gates 2.Build an airport-by-airport, epoch-by-epoch schedule of arrivals and departures 3.Cycle through each 15-minute epoch, creating a running count of the change in the number of aircraft at the gate 4.Add these net change values to the baseline value to provide the total aircraft at the gates throughout the day 5.Compare these values to the airports gate capacity 6.Trim arrivals and departures so that airports capacity is not violated; decrement baseline aircraft 7.Repeat steps until arrival denial rate matches baseline percentage reduction

P A G E 19 Overview of Subtask 5 Analyze Airportal Environmental Constraints Fuel constraint analysis –Analyze/trim flights at all 310 airports based on the current JPDO fuel efficiency metrics –Use the current JPDO goal of 1% improvement per year compounded annually to define the future fuel efficiency targets Emissions constraint analysis –Analyze/trim flights at all 310 airports using the production of NOx as the metric –Apply the fuel efficiency goal to NOX as well, 1% improvement per year compounded annually to define the future targets Noise constraint analysis –Analyze/trim flights at all 310 airports based on the current JPDO noise metrics of population exposed to 65 dB DNL –Use the current JPDO goal of 4% improvement per year compounded annually to define the future noise targets

P A G E 20 Subtask 5: Analyze Airportal Environmental Constraints Environmental Methods Considered Level 1: Schedule Based –Noise/Fuel/Emissions calculations are based solely on flight schedules, no track data used Level 2: Simplified Flight Tracks –Noise/Fuel/Emissions are based on straight in/out flights tracks and schedules along with runway use Level 3: Radar Based –Noise/Fuel/Emissions are based on a radar sample of actual radar track data and known flight schedules

P A G E 21 ModelPurposeSystem Inputs & Assumptions User Inputs ResultsTechnology (Underlying Models) Environmental Sensitivity Tool Light-weight Spreadsheet Based Simple Interface Low Fidelity Trend Analysis Results in Secs ICAO/EDMS times-in-mode for fuel and emissions ICAO distance based fuel burn matrix AEM Noise Coefficients Population density by airport based on 2000 US Census. Day/Night distribution Schedule of operations (origin, destination, aircraft, departure time) Fuel per flight divided by mixing height. Emissions per flight Population exposed to noise for 55 & 65 dBA DNL. EDMS BADA AEM NAS-Wide Environmental Screener Light-weight Java Based Simple Interface Medium Fidelity Policy/Trend Analysis Results in Mins US 2000 Census Flight performance database of all aircraft times-in-mode based on stage-length Great-circle distance fuel burn Noise maps database for all aircraft Schedule of operations (origin, destination, aircraft, departure time, arrival time) Runway configuration and use. Fuel per flight divided by mixing height. Emissions per flight Population exposed to noise for 55 & 65 dBA DNL. Noise Contours EDMS BADA NIRS NASEIM Regulatory Tools Heavy-weight Java/C++ Based Simple Interface High Fidelity Policy/Regulatory Analysis Results in Hours/Days US 2000 Census EDMS (AEDT) fuel and emissions below 3K BADA based fuel above 3K SAE based aircraft performance for noise Schedule of operations assigned to trajectories. Simple one to one trajectory or detailed backbones. Fuel per flight divided by mixing height. Emissions per flight Population exposed to noise for 55 & 65 dBA DNL. Noise Contours EDMS BADA NIRS NASEIM Subtask 5: Analyze Airportal Environmental Constraints Variable Fidelity Terminal Area Modeling

P A G E 22 Subtask 5: Analyze Airportal Environmental Constraints Terminal Area Level 2(NES) Modeling IAD New Runway EIS 210 Noise Contour (65+ DNL) IAD NES 2007 Noise Contour (65/55/45 dB DNL)

P A G E 23 Subtask 5: Analyze Airportal Environmental Constraints Terminal Area Level 3 Modeling Level 3: Regulatory Tools (NASEIM/NIRS) –12,140 flight tracks –111 backbones serving 10 runways –Each profile generated to match the existing flow Legend 30 Day Radar Sample – ORD Arrivals 40 nmi from ORD Backbones – ORD Arrivals

P A G E 24 Subtask 5: Analyze Airportal Environmental Constraints Airports Environmental Analysis Input For the level 2 modeling we developed lower fidelity terminal areas based on runway configuration and weather data for all 310 airports. For the level 3 modeling we developed higher fidelity radar driven terminal areas inputs for the FACT 56 airports. –Used two sources (ATA-LAB or PDARS) –Updates to the OEP Airports New runways - ATL, BOS, CVG, LAX, MSP, STL Runway extensions – PHL –Generation of the terminal areas for the additional 21 ABQ, AUS, BDL, BHM, BUR, GYY, HOU, HPN, ISP, LGB, MKE, OAK, ONT, PBI, PVD, RFD, SAT, SJC, SNA, SWF, TUS

P A G E 25 Results At each of the 310 critical airports –Projected throughput under each constraint –Primary and secondary constraints Aggregate results –by group: busiest 10, OEP 35, LMI 110, and LMI 310 –and by constraint Capacity: runway, taxiway, and gates Environmental: emission, NOx, and noise –and by year: 2015 and 2025

P A G E 26 Primary and Secondary Constraints at 10 Busiest Airports in 2025 Similar tables are created for each of the 310 critical airports for both years

P A G E 27 Constraints for the Busiest 10 Airports, 2025

P A G E 28 Constraints for LMI 310 Airports, 2025

P A G E 29 Constrained Airports in 2025

P A G E 30 Conclusions Even with full NextGen implementation, some constraints will still exist at some airports –The overall system projected throughput will be no more than the worst constrained case, losing about 15% of total operations in 2025 (310 airport case under noise) –Runway constraints are more binding for the largest airports (top 10), losing about 11% operations –Environmental constraints are widespread and noise is most binding The environmental goals are quite aggressive and directly affect the results of this study

P A G E 31 Caveats and Limitations Decomposing the system constraints is an analytical technique; we recognize that in the real world, everything is interconnected and mostly inseparable Demand forecasts are ever-changing and never perfect; the analysis necessarily is a snapshot Capacity estimates are analytically rigorous and our assumptions are reasonable and clearly documented; however, fully successful and timely R&D and implementation of capacity enhancements is an optimistic assumption The projected throughput metric, while very useful, models an extreme response (flight trimming) and, in this analysis, we did not model other likely operator responses such as schedule smoothing and use of secondary airports