ENTERGY ENGINEERING HUMAN PERFORMANCE APPARENT CAUSE DLA July 2007

Slides:



Advertisements
Similar presentations
Presenting: Units A1 and A2
Advertisements

OOAD – Dr. A. Alghamdi Mastering Object-Oriented Analysis and Design with UML Module 3: Requirements Overview Module 3 - Requirements Overview.
Radiopharmaceutical Production
Pre-registration training website The pre-registration portfolio is completed in an online capacity. This e- presentation will guide you though a series.
ISO 9001:2000 Documentation Requirements
Module 2.4 Workforce Transition Planning and Tool March
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Pipe Supports and Hangers
Patrick Walsh Nine Mile Point – Human Performance HPRTC Conference -June 10 Improving Administrative Procedure Use and Adherence.
Guide to using the myNATE website
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Essentials of Effective Training Programs Cheryl J. Greathouse, MPA, RPL Director, Instructional Services Georgia Public Safety Training Center.
By: Farzad Dadgari Soil and Environmental Specialist SWHISA.
COURSE ADDITION CATALOG DESCRIPTION To include credit hours, type of course, term(s) offered, prerequisites and/or restrictions. (75 words maximum.) 4/1/091Course.
Preceptor Orientation
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
February 28, 2008The Teaching Center, Washington University The Teaching Citation Program & Creating a Teaching Portfolio Beth Fisher, Ph.D. Assistant.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
AR354: Advanced Billing Welcome to AR354: Advanced Billing.
WELCOME BACK! (Project Lead the Way Engineering Design & Development Course) Block 3 (12th Grade) BCIT Medford Room E110.
Insert Graphic Presentation Title Name Title Location.
“Teaching”…Chapter 11 Planning For Instruction
Copyright 2010, The World Bank Group. All Rights Reserved. Development of Training and Procedural Manuals Section B 1.
Title of Training Presentation Presented by Your Name.
INFOSYS JOB ANALYSIS AND JOB DESIGN
CHAPTER 11 PLANNING FOR INSTRUCTION. Lesson Planning Course Planning Curriculum Educational Standards.
Introduction to Developing Learning Objectives Course Introduction Go to Lesson Two Go to Lesson One.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Standard Design Process (SDP) Interfacing Procedures Ashley Taylor TVA
Project Work Order Generator
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
VISION Learning Station
Use Cases Discuss the what and how of use cases: Basics Benefits
Module 6 Corrective Action Request (CAR) Overview
TA-V eB Performance Improvement Overview
Written Instructional Materials
Session 30 Transition to the Certification Phase of Training
Interest To give the theory lesson a platform or foundation to work from this aids both the trainees and the instructors. This structure that ensures.
SCC P2P – Collaboration Made Easy Contract Management training
Intermediate Small Business Programs, Part B SBP 202 Lesson 1: Introduction February 2017 Lesson 1: Introduction.
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Skills for Success! Strategy & Implementation Guide
Systems Analysis and Design
Portfolios Digital Electronics © 2014 Project Lead The Way, Inc.
Preparing to Teach and Overview of Teaching Assignments
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Introduction to Internal Audits
Contamination Control
U.S.VETS Career Network Resume Building 101
Forging the Innovation Generation
Design Portfolio.
EDD/581 Action Research Proposal (insert your name)
Topic Principles and Theories in Curriculum Development
Project Management Process Groups
Requirements Management
Writing reports Wrea Mohammed
Train the Trainer Your Name.
EDD/581 Action Research Proposal (insert your name)
Preparing to Teach and Overview of Teaching Assignments
PROPOSAL FOR REDUCED HOURS FOR NAME
Portfolios.
Apply for CIMA Membership - Existing Practical Experience Requirements
Title of Program segment
Radiopharmaceutical Production
PowerPoint Presentation Guide
Directions for this Template
Role of the Internal Verifier
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Permit to Work Process​ HSE GROUP RULE (CR-GR-HSE-402)
Introduction to Extended Reflection 1 Term 1, Development Day 1
Presentation transcript:

ENTERGY ENGINEERING HUMAN PERFORMANCE APPARENT CAUSE DLA July 2007 Number: STTP-PROG-COURS (15 characters total; Should match Training material number) S- Site Identification. AS For ANO Shared A1 For ANO Unit 1 only A2 For ANO Unit 2 only E For Fleet/Region use G For Grand Gulf R For River Bend W for Waterford TTP - Course Type LP for lesson Plan three or less characters PROG - Training Program Identifier four or less characters COURS - Unique identifier for document or course seven or less Characters. REVISION: # APPROXIMATE TIME: X Hours REFERENCES: Use document numbers and titles so they have meaning to the instructor Procedures, ER, Technical manuals etc. PRESENTATION MATERIALS: List Presentation Materials needed other than this power point to present lesson. HANDOUTS: List any handout needed for the student. COMMITMENTS: List any commitment applicable to this lesson. All slides should have slide number. NOTE: Slide design is at the instructor’s discretion.

OBJECTIVES Evaluate Engineering Personnel Skills in Preparing and Reviewing Apparent Cause Evaluation (ACE) Reviews. Evaluate Engineering Personnel use of Human Performance Tools and Trap Identification during an ACE Review. State objective with objective number in the notes section of power point. The objective number is needed to maintain the training to task matrix. Objective number is not required on the slide, see above. Terminal OBJECTIVES: Upon completion of this lesson and given applicable reference materials, the student should be able to demonstrate mastery of the following objectives by scoring at least 80% on a written examination: Bulleted objectives. Enabling Objectives: DRAW a one-line diagram of the RCS. [4] STATE the purpose of the RCS. [1] IDENTIFY locations where thermal sleeves are used in the RCS. [2]

WHY APPARENT CAUSE EVALUATION DLA? Engineering Product Quality Review Results Inconsistent ACE Product Quality Problem Statement and Extent of Condition Vague/Interpretative Guidance Inconsistent Format Change Management New Fleet ACE Procedure Given the Technical Specifications and plant status, IDENTIFY and EVALUATE the operability, actions, and bases for the following: [3] TS 3.4.3.1, Pressurizer TS 3.4.3.2, Auxiliary Spray

DLA DEVELOPMENT Pre DLA Training Exercise Scenario Selection Task Development Proctor Script Development DLA HU Observation Card Design Proctor Assignment Schedule DLA HU Tool Usage Results Post DLA Effectiveness Assessment Insert Notes for instructor may include OE specifics, Plant CR details etc, Any information to help instructor prepare for the lesson goes in the notes section. The left hand column of a two column format lesson plan. The number of slides depends on material, use as many slides as needed. Examples Display Figure XX while talking about this slide. In the above picture note XXX explain why you have the picture in power point give details here in notes. Hyper links should be minimized in the approved lesson plan. The links change often and they may not work the next time a class is presented. Instructor may add links to an approved lesson plan to present a lesson. In notes field include Lesson objective number applicable to slide.

PRE DLA Training Change Management - New ACE Procedure Class Room Training Objectives ACE Section Requirements Effective Problem Statements (WHAT) Explanation of Problem (HOW) Apparent Cause Analysis Techniques (WHY) Extent of Condition Development (WHAT ELSE) Corrective Actions (RESOLUTION) {Insert your presentations slides here or use this slide to begin construction of your presentation.}

DLA EXERISE SCENARIO SELECTION Activity Selection Considerations: Completion Time Approximately 1 Hour Typical Engineering Personnel Task Reference Material Available HU Traps embedded Inconspicuously Specific Technical expertise not required SCENARIO - ACE REVEW

TASK DEVELOPMENT Modify Actual Condition Report Description for Exercise Scope Single Train (B) Repetitive Valve Packing leaks vs Both Trains (A)&(B) Modify Apparent Cause for Review to Match CR Scope/Work History w/HU Taps ACE written for A train not B train No references for Work History NOTE: This is an “if applicable” type slide. It does not need to be a stand alone slide (the needed information can be included on any slide). This slide can be repositioned or duplicated as needed. Industrial safety issues should be seamless to presentation and relevant to subject. Safety should be seen as a seamless transition part of the presentation. Safety should be part of all lesson plans Should include specific safety details in notes. High point bullets should go on slide above.

TASK DEVELOPMENT Prepare Pre Job Brief Brief Check List (Level Determination) INPO HU Tools for Engineers List of Relevant ACE Term Definitions Current Relevant Valve Data

TASK DEVELOPMENT Assemble Reference Information ACE Relevant Procedures Valve Partial Work History w/references Valve Complete Work History w & w/o references Referenced Drawings, Referenced Vendor Information

DLA HU TRAPS Phonetic Alphabet Not Used to Present ACE To Student Product Quality Check or CR are not Provided To Reviewer With ACE ACE Specified Valve Train A, CR Train B No Pre-Job Brief Offered by Proctor Initial Work History w/ACE Contained no Reference Document Information

DLA HU TRAPS 2nd Work History Incomplete w/References 3rd Work History Complete w/o References Referenced Vendor Information not Provided Referenced Calculation not Provided ACE Problem Statement Not Concise Corrective Actions Assigned to Wrong Disciplines, Some Not Related to Cause, Long Term Actions Not Approved

Proctor Script Development Provide Brief Description of the Exercise Scenario List Required Skills Student Are Required to Demonstrate in Exercise Describe Simulated Work Area and Required Equipment Instructions Prior to Start of Task – Introduction Explanation of Exercise – Student Task Overview NOTE: This is an “if applicable” type slide. It does not need to be a stand alone slide (the needed information can be included on any slide). This slide can be repositioned or duplicated as needed. Equipment reliability issues should be seamless to presentation and relevant to subject. OE should be seen as a seamless transition part of the presentation. Do not put an unrelated OE to get credit for including OE, it must be relevant. And should use most current material. Applicable plant & industry operating experience should be built into presentation as appropriate. Make it specific to material being covered. Good idea to include document number. OE number form INPO CR Number Plant experience Etc Details should be in notes bulleted high points on slide above

Proctor Script Development Task Initiation Tab Contents Exercise Start Instructions Initial Task Document (ACE) Task Assignment Description/Deliverable Proctor ACE Prep Role Associated HU Trap Descriptions

Proctor Script Development Pre-Job Brief Tab (If Requested) Job Briefing Expectations/Level Selection Pre-Job Brief Checklist Task Taps and Tools - INPO HU Tools Definitions of Terms Current Technical Data

Proctor Script Development Procedure Tab –(If Requested) Expected Behavior Description Demonstrate How to Find Procedures Verify Procedure Requirements Copies of Procedures

Proctor Script Development Additional DLA Tabs w/ Trap Descriptions Valve History Tab Drawing Tab Vendor Information Tab Calculation Tab

Proctor Script Development HU Tap Descriptions Problem Statement Trap Description Not Concise – Non Condition Information Extent of Condition Trap Description No Extent of Condition Selection Justification Extent of Condition CR Question Corrective Action Trap Description Assignment Errors & Long Term CA Approval

DLA HU Observation Card Design Observation Card HU Tool Categories Job Briefing Coaching Self Checking Effective Communication Procedure Use Knowledge Place Keeping Questioning Attitude

DLA HU TOOL USE RESULTS DLA HU Observation Card Data 48% Did Not Request a Pre-Job Brief 71% Did Review ACE Procedure 56% Did Not Review CA procedure 62% Acceptable Knowledge Tool Use 53% Acceptable Questioning Attitude

DLA HU TOOL USE RESULTS DLA HU Observation Card Data Knowledge HU Tool Use NI Categories Identify Extent of Condition CR Challenge Qualifications Verify CA Due Date Requirements Problem Statement Description Deficiencies Check for Calculation Change Notices Extent of Condition/CR Reviews

DLA HU TOOL USE RESULTS DLA HU Observation Card Data Questioning Attitude Tool Use NI Categories Calculation Update Extent of Work History Review Source/References of Work History Repetitive Lower Packing Bolt Torque Use Verification of Vendor Information Product Quality Check List Review Recognition of CR/ACE Valve ID Discrepancy

DLA EFFECTIVENESS ASSESSMENT ACE PI Metric = Avg. EPQR ACE Grade PI Goal = Avg. ACE EPQR Grade < 2.0 Evaluation period - 8 Month After Start of Training ACE EPQR PI reached < 2.0 (GREEN) In 3 months ACE EPQR Grades Remain within Goal for 21Months After Training Completed

Proctor DLA Exercise Schedule Assign 1 Proctor per 4 – 5 Students WF 3 used 9 proctors Performs DLA w/ 1 – 2 students per week completed all DLA training in 3 weeks Schedule had minimal work load impact for proctors and students

Questions?