Offshore Wind Transmission Prepared for PJM Roundtable

Slides:



Advertisements
Similar presentations
© New York Independent System Operator, Inc. All Rights Reserved. New Challenges Facing System Operators Stephen G. Whitley President & Chief.
Advertisements

Northeast Climate Change Preparedness| Manchester, NH| May 20, 2014 Presented by Fouad Dagher, National Grid Vision for The Future.
Renewables and the Grid – Challenges and Solutions A personal perspective Cameron Smith Country Manager (Scotland), Mainstream Renewable Power.
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
BOSTON CHICAGO DALLAS DENVER LOS ANGELES MENLO PARK MONTREAL NEW YORK SAN FRANCISCO WASHINGTON Governors’ Wind Energy Coalition November, 2011 Competitive.
April 30, 2015 Deborah Donovan Northeast Wind Resource Center W IND S ITING R EGULATIONS AND G UIDELINES IN N ORTHEAST A B RIEF U PDATE.
AMERICAN PUBLIC POWER ASSOCIATION NATIONAL MEETING Salt Lake City June 15, 2009 Panel: “WHAT DOES IT TAKE TO GET TRANSMISSION BUILT?” Remarks of James.
The Potential for Increased Cooperation on Offshore Wind among the Northeast States Warren Leon, Executive Director.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Oktober 2011 Opportunities sustainable Aruba TNO perspective Mart J. van Bracht.
ISO New England Regional Update Wholesale Electricity Markets & State Energy Policy Seminar Connecticut Business & Industry Association December 14, 2010.
Bringing Offshore Wind to Virginia
© Offshore Wind A big opportunity? GA-EMA Conferences 22 October 2014.
PJM© PJM Confidential PJM Generation Interconnection Overview Virginia Offshore Wind Conference Virginia Beach June 22, 2011 Paul McGlynn General.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Transmission : From Policy to Projects One Company’s Perspective November 4, 2011 Clarke Bruno 1.
ThinkEquity Summer Call Series “CAN WE DEAL WITH THE CHALLENGES TO GETTING TRANSMISSION BUILT?” Remarks of James J. Hoecker Husch Blackwell Sanders LLP.
Managing the Environmental Considerations of Power Generation Canada Europe Round Table for Business Brussels September 20, 2004 Frederick W. Firlotte.
Integrating More Renewable Energy in the Grid Bert Garvin Vice President, Regulatory Affairs July 21, 2008 NARUC Summer Meeting July 22, 2008.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
1 NAUSCA Summer Meeting Boston June 30, 3009 David W. Hadley Vice President State Regulatory Relations Midwest ISO.
Bob Cupit Manager, Energy Facility Permitting Minnesota Public Utilities Commission.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
Towards 100% RE in Denmark in 2050 Jakob Jespersen Danish Energy Agency Hai Phong, 17 December 2013 – the role of wind energy.
Environmental Compliance Workshop February 4, 2016 MISO’s analysis of the Clean Power Plan Marc Keyser Program Manager Program Strategy/Clean Power Plan.
Connecting the Dots: Policy, Markets and the Clean Energy Future New England Restructuring Roundtable Boston, MA September 30, 2016.
Regional Greenhouse Gas Initiative
Where Emera Operates 2.5 million customers 7,400 employees
Bringing Offshore Wind to New England’s Shore Restructuring Roundtable
Chairman of the Board and CEO,
Wind Development in an Evolving Power Market
Restructuring Roundtable June 16, 2017
At-Risk Nuclear Plants: Challenges and Opportunities
Patrick Smith, Vice President
The Transition to a High DER Future
Jürgen Häfner, R&D Manager - Projects, Power Systems - HVDC
Bureau of Ocean Energy Management
The Future of Demand Response in New England
Arun Vedhathiri, Director, Project Delivery, National Grid
Opportunities in the Changing Energy System
Draft 2013 Energy-Efficiency Forecast
Massachusetts Leadership in Offshore Wind
The ISLES Project Bob Hanna
First Wind Northeast Transmission Overview
Transmission As Enabler
Preserving Competition and Promoting Clean Energy (for All)
New England Resource Adequacy
Symposium on Energy in the 21st Century
Challenges and opportunities on Islands’ decarbonisation
EVP, Chief Administrative Officer
Affordable & Available: Large Scale Clean Energy for New England
"The Price, Reliability, and Environmental Impacts of Electricity- Related Fuel Diversity Trends in New England" Alan Nogee Energy Program Director.
Kurt Adams EVP&CDO Restructuring Roundtable
New England Electricity Restructuring Roundtable September 18, 2009
Panel II - Future of Competitive Transmission in the PJM Footprint December 1, 2016 Chip Richardson – PPL Electric Utilities.
Infrastructure Needs and Our Electric Grid for the 21st Century
NS4960 Spring Term 2018 U.S. Offshore-Wind Projects
Restructuring Roundtable Peter D. Fuller February 29, 2008
Northeast Regional Greenhouse Gas Initiative
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
The Role of Hydro-Québec in New England Electric Markets The New England Electricity Restructuring Roundtable June 14, 2013 Stephen Molodetz, Vice.
Anna Garcia Air Innovations Conference August 2004
Creating Benefits for New England: Putting the Pieces Together
Gordon van Welie, President & Chief Executive Officer
Meeting the challenge: Electrification and Climate Change
America’s First Offshore Wind Farm is Now Operating
State of Vermont Energy Stimulus Plan
Transforming the Electric Grid with Storage
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

Offshore Wind Transmission Prepared for PJM Roundtable Theodore J. Paradise, SVP Transmission Strategy & Counsel 04/25/2019

A Few Words About Anbaric and Our OTPP Partnership We develop clean energy infrastructure in North America, including renewable energy transmission, microgrid/storage projects and smart energy campuses. Anbaric has pioneered undersea HVDC in the northeast with two operational subsea HVDC technology projects between PJM and NYISO Anbaric Development Partners was formed in March 2017 as partnership between Anbaric and Ontario Teachers’ Pension Plan. OTPP had c$193.9B of assets under management as of June 2018. Our partnership introduced a new model for pension fund investment in infrastructure and energy that enables Anbaric to deliver efficient, patient capital for long-term projects. 60% 40% Through Anbaric Development Partners, OTPP is committed to funding development costs which are projected to produce $2 billion in fully constructed assets.

Offshore Wind Goals In East Coast RTO/ISO States Goal (MW) Procured (MW) Massachusetts 3,200 800 Rhode Island 1,000 430 Connecticut 1,000 - 2,000* 300 New York 9,000 130 New Jersey 3,500 Maryland 1,200 368 Virginia 2,000 12 Total 21,900 MW 2,040 MW * Legislation under discussion Confidential and Proprietary Information: Do Not Disclose

Leaseholds In BOEM Wind Energy Areas Confidential and Proprietary Information: Do Not Disclose

Much to Learn from the European Experience In Europe, with more than 14,000 megawatts of offshore wind developed since 1991, planning transmission has gained traction and generation and transmission are increasingly owned and developed by different companies. United Kingdom 8054 MW 1927 turbines Germany 6382 MW 1305 turbines Denmark 1294 MW 495 turbines Netherlands 1118 MW 410 turbines Belgium 1189 MW 274 turbines Europe expects to have 25,000 megawatts of capacity by 2020. Belgium under construction numbers are 1076 and 125 turbines. Germany has more under construction and 1500 more will be procured in 2019

A European Perspective From Hard-Earned Experience “Policymakers need to recognize that the ocean, if it’s to serve as a dominant energy source, must have its own planned, independent, offshore grid. In other words, governments should think beyond early procurements and insist on infrastructure that can support long-term growth.” Wilfried Breuer, Managing Director of TenneT

New York Has Formally Endorsed Planned Transmission New York’s Governor Cuomo called for 9,000 MW of offshore wind in his 2019 state of the State address. In so doing, he also called for the development of an offshore transmission system, stating: “Transmission: Initiate a first of its kind effort to evaluate and facilitate the development of an offshore transmission grid that can benefit New York ratepayers by driving down offshore wind generation and integration costs.”

Recent Brattle Group Study Findings A recent Brattle Group report (May 30, 2018) found that a planned offshore grid would provide open access to enable more competition between wind developers and between experienced transmission developers – and that competition will lead to lower prices. The study also determined that with 8,000 megawatts of combined offshore generation under consideration for MA, NY and NJ, offshore grids that integrate multiple wind plants “would create scale economies and reduce the number of necessary landing points.”

Planned Transmission Helps De-risk Project Timelines It’s important to plan the transmission to identify an efficient plan that optimizes ROW and on-land approaches. On-land permitting can consume significant time. Planning a transmission system first allows permitting to be undertaken and be in place so that system can be quickly expanded. This shows installation of the on-land portion of an Anbaric HVDC project.

Benefits of Networked Planned Offshore Transmission Planned transmission now being recognized in the Northeastern United States as the most cost effective way to reliably interconnect large quantities of offshore wind with: Less environmental impact Fewer high capacity cables means less ocean trenching of the sea floor Fewer high capacity cables means reduced impacts on fisheries The most reliability and resiliency Multiple network cables means that power from each windfarm has multiple paths to shore instead of just one – allowing for power to flow if a circuit is lost or out for maintenance Controllable lines in a network system make large amounts of offshore wind a solution for New England’s fuel security issues, eliminating RMR payments to fossil plants The way to optimize limited seafloor ROW and limited onshore substations Multi-State Cost Sharing Directly or Through Order No. 1000 Public Policy Enables competition between wind farms because generators don’t need to bring their own transmission system

What Does Large-Scale Enabling Transmission Look Like? RTO/ISO Control Area Anticipated, yet not defined, offshore wind generation Open access Transmission Platform Project Gen-tie for planned offshore wind generation

New Jersey OceanGrid Concept map of New Jersey Transmission System New Jersey OceanGridTM http://nj.anbaric.com

PJM Region Addressing Gaps for Enabling Transmission PJM has undertaken a stakeholder process to ensure that transmission-first projects that enable the later interconnection of wind can be fully studied not just for HVDC (projects already under study), but also for AC configurations. Problem statement issued early 2019 Expected tariff revisions summer 2019 This approach will help ensure open-access for grid-expanding projects that weren’t contemplated under existing tariff rules but are consistent with FERC’s Order No. 888 and Order No. 1000 principles

APPENDIX Other Regions Have Studied And Deployed Successful Transmission-First, Grid- Expanding Open Access Projects Confidential and Proprietary Information: Do Not Disclose

California ISO – Developed Rules Over 10 Years Ago *The facilities in the circle are the remote generation (1,150 MW) Confidential and Proprietary Information: Do Not Disclose

ERCOT ERCOT planned a ~ 2,400 mile transmission-first grid expansion project AC Planned ahead of generation Allowed for over 20,000 MW of wind to be quickly connected and integrated Confidential and Proprietary Information: Do Not Disclose

Questions and Discussion