Km (Onagawa Nuclear Power Plant) Reachable by Roads Unreachable by Roads Remarks Futaba Niigata Airport Runway A 1,314m Runway B 2,500m Normal Operation.

Slides:



Advertisements
Similar presentations
Set Up Instructions Place a question in each spot indicated Place an answer in each spot indicated Remove this slide Save as a powerpoint slide show.
Advertisements

Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 5 Author: Julia Richards and R. Scott Hawley.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Calculate Quickly! Created by Inna Shapiro ©2008.
Jeopardy General Compare & Order AdditionSubtraction Vocabulary Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Miss Woodworth Math Jeopardy Multiply Money Time zone Rounding Numbers
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire?
Learning to show the remainder
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
ZMQS ZMQS
1 Copyright Copyright 2012.
1 s Share 2 s Share 3 s Share settles with 1 for $200,000 (the limit of 1 s insurance policy) settles with 1 for $700,000 Fault allocation: =0%, 1 =50%,
Break Time Remaining 10:00.

1 Competitive Privacy: Secure Analysis on Integrated Sequence Data Raymond Chi-Wing Wong 1, Eric Lo 2 The Hong Kong University of Science and Technology.
Division- the bus stop method
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Capacity and Constraint Management
Presented to: By: Date: Federal Aviation Administration Federal Aviation Administration Airports Division Financial Programs Yampa Valley Reg. Airports.
Logo Add Your Company Slogan Tianjin Airport International Logistics Park Tianjin Airport Industrial Park Enterprise First Service First Efficiency First.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Squares and Square Root WALK. Solve each problem REVIEW:
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
We are learning how to read the 24 hour clock
1 Town of Colchester FY 12 Budget. 2 Current Financial Challenges Vermont and the nation are coming out of a recession Expenses rarely go down.
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Januar MDMDFSSMDMDFSSS
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Partial Products. Category 1 1 x 3-digit problems.
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Houses are shown in flames while the Natori river floods over the surrounding area with tsunami tidal waves in Natori city, Miyagi Prefecture, Northern.
is a world in which all people displaced by disasters and humanitarian crises are rapidly provided with emergency shelter and vital aid, which will help.
Economic Impact of the Great East Japan Earthquake and current status of Recovery Ministry of Economy, Trade and Industry.
Damage of infrastructures due to the 2011 off the Pacific Coast of Tohoku earthquake and tsunami - Case study for water outages and sewerage disruption.
Personal Information facebook Japanese Earthquake & Tsunami (JET) All times and dates are local Japanese time WallPhotosBoxesJapanese Earthquake & TsunamiLogout.
OPERATION TOMODACHI HA/DR 18 MARCH N 14154E N 14054E N E N 14015E – 3948N 13940E N 14001E N 14130E N.
PowerPoint Show by Emerito
Presentation transcript:

km (Onagawa Nuclear Power Plant) Reachable by Roads Unreachable by Roads Remarks Futaba Niigata Airport Runway A 1,314m Runway B 2,500m Normal Operation Time 7:30 20:30 Ports Confirming the Utilization Active Ports (Including probable recovery) Odate Noshiro Airport Runway 2,000m Normal Operation Time 8:00 19:30 Misawa Airport Runway 3,050m Normal Operation Time 8:30 20:00 Kashuminome Station Runway 708m Runway 400m I: Soma Port J: Onahama Port G: Ishinomaki Port F: Ofunato Port E: Kamaishi Port D: Miyako Port C: Kuji Port B: Hachinohe Port A: Aomori Port Uetsu Line Ouu Line Active Freights Railways Hachinohe Garrison Runway 2,250m Active Airports Shonai Airport Runway 2,000m Normal Operation Time 7:00 22: (Road, Railway, Civil Aviation and Ports & Harbors Bureaus) Recovery of Transportation :00 By Geospatial Authority Electronic Land Ibaraki Airport (Hyakuri) Runway A 2,700m Runway B 2,700m Normal Operation Time 9:30 21:00 Tokyo Intl Airport Runway A 3,000m Runway B 2,500m Runway C 3,000m Runway D 2,500m Normal Operation Time 24 Hours Closed Airports Self-Defence Forces Garrisons Akira Freight Station Hirosaki Station Sakata – Ko Station River Bureau & Geospatial Authority, MLIT Fukushima Nuclear Power Plant Narita Intl Airport Runway A 4,000m Runway B 2,500m Normal Operation Time 6:00 23:00 Active Passenger Railways Jyoetsu Line Niigata Freight Terminal Aomori Airport Runway 3,000m Normal Operation Time 7:30 21:30 Hokuriku Line Utsunomiya LIne Takasaki Line Jinmachi Garrison Yamagata Airport Runway 2,000m 24 Hours Operation for Disasters Normal Operation Time 8:00 19:30 Hanamaki Airport Runway 2,500m 24 Hours Operation for Disasters Normal Operation Time 8:00 19:30 Akita Airport Runway 2,500m Normal Operation Time 7:00 21:30 Somagahara Garrison Runway 500m Fukushima Airport Runway 2,500m 24 Hours Operation for Disasters Normal Operation Time 8:30 20:00 Sendai Airport Runway A 1,200m Runway B 3,000m Operation Time 7:30 21:30 Temporary Use for 1500m Runway (Rescue Only, 24 Hours) Utsunomiya Freight Terminal Kuragano Station H: Sendai Shiogama Port (Sendai Area) Sendai Shiogama Port (Shiogama Area) Ibaraki Port (Hitachi Port Area) Ibaraki Port (Hitachinaka Area) Ibaraki Port (Oarai Area) Kashima Port