EPIC UK funding situation

Slides:



Advertisements
Similar presentations
John Womersley The Science and Technology Facilities Council and Nuclear Physics John Womersley Director, Science Programmes October 2008.
Advertisements

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director.
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
WG1: High Power Targets PASI 2013 Working Group Sessions Introduction Convened by: Dr. C. Densham (STFC/RAL), Mr. P. Hurh (FNAL)
Nuclear Physics Peer Review Processes 1.Objectives 2.Types of activities and relevant processes 3.New project /major upgrade 4.Project R&D 5.Exploitation.
The Physics of Nuclei, Nuclear Matter and Nucleosynthesis Report of the Nuclear Physics Advisory Panel.
NSF Experience with Management of Research Infrastructure
National Center for Research Resources NATIONAL INSTITUTES OF HEALTH T r a n s l a t i n g r e s e a r c h f r o m b a s i c d i s c o v e r y t o i m.
Mount up with wings of Eagles Adoption and Commercialization of Technology Innovations Dr. Steve Jarrett Dolphin & Eagle Consulting, Inc. Charleston, SC.
A better place Karen Balfour Be Birmingham VCS Matters Summit 23 June 2010.
N Network for Active Targets 12 institutions (France, Spain, UK, Germany, Poland) GANIL, France CENBG Bordeaux, France SPhN/DAPNIA/DSM Saclay, France IPN.
ISOL-SRS project.
Analysis and Control of Beam Dynamics in EMMA Kai Hock and Andy Wolski STFC PPRP Meeting, Glasgow, 24 June 2009.
HEPAP and P5 Report DIET Federation Roundtable JSPS, Washington, DC; April 29, 2015 Andrew J. Lankford HEPAP Chair University of California, Irvine.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Overview of UK Nuclear Physics Paul Nolan. Structure of how nuclear physics is organised in the UK Nuclear Physics funding in the UK Numbers to indicate:
Office of Science U.S. Department of Energy RHIC Users Meeting BNL; June 8, 2006 Gulshan Rai RHIC/AGS Users Meeting Gulshan Rai Program Manager for Heavy.
BROOKHAVEN SCIENCE ASSOCIATES Peter Bond Deputy Director for Science and Technology October 29, 2005 New Frontiers at RHIC Workshop.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
State-of-the-Art Accelerator Technology Peter McIntosh, STFC HEPTech Environmental Applications of Accelerators 9 th July 2013.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
Nuclear Structure/Direct Reactions Experiments …became a broader discussion about how to initiate collaborations.
2 Workshop 2014 Status of the Project Klaus Blaum, MPI for Nuclear Physics, Heidelberg for the Collaboration CERN, Geneva,
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Forest Knowledge Know-how Well-being Luke’s and VTT’s joint research and innovation programme 2012–2016.
Nigel Lockyer Fermilab Operations Review 16 th -18 th May 2016 Fermilab in the Context of the DOE Mission.
UNEP in collaboration with DISTRICT ENERGY IN CITIES A GLOBAL INITIATIVE TO UNLOCK THE POTENTIAL OF ENERGY EFFICIENCY AND RENEWABLE ENERGY Ms. Lily Riahi.
Marcel Stanitzki Rutherford Appleton Laboratory
Presentation to PPAP meeting
Final CALICE OsC meeting: Status and summary of project
CLIC work program and milestones
PH Department News Discussion with management
ARIES Industrial and Societal Applications Network
From Accelerators Physics to Nuclear Medicine
LCC L. Evans, Santander, 2nd June 2016
Accelerator R&D for Future Neutrino Projects
Introduction to ASTeC Programmes
Nuclear Physics Group: changes since July 2011
ThorEA Science Minister Report
for the EURISOL Steering Committee
Accelerator Research and Innovation for European Science and Society
John Womersley Super-B Workshop Oxford May 2011
Ways to industry participation in CLIC 24th October, 2017
Teach the Teachers John Roberts School of Physics and Astronomy
UK Status and Plans Scientific Computing Forum 27th Oct 2017
Science parks and technological support at ELI Beamlines
DOE Nuclear Safety Research and Development Program
Standards for success in city IT and construction projects
V. Fedosseev, R. Losito AB/ATB/LPE ISCC, 31/10/2005
Research Program Strategic Plan
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC
DOE Office of Science Graduate Student Research (SCGSR) Program
PI: Prof P. Sellin University of Surrey Dr Neil Gaspar Nuclear Threat Reduction, AWE STFC Nuclear Science Community Meeting January 2018.
BEIS Local Energy Team Stuart Chapman, Local Partnerships Manager
Government Funding Opportunities for Energy Innovation
Fixed Decay Station at ISOLDE
Particle Astrophysics Advisory Panel
UK Nuclear Physics Nuclear Physics Advisory Panel update April 2018
A High Intensity Neutrino Oscillation Facility in Europe
Director Be Birmingham Third Sector Assembly, Annual Conference
The European Consortium working on the ESSνSB project
Director Be Birmingham Third Sector Assembly, Annual Conference
Government Funding CABC March 2019 Presented by: Samad Hosseini Thinker Technology Disclaimer: the information is.
Richard Catherall EN-STI-RBS
Sustainable Agricultural Lands Conservation Program
Is STEM for me ? What’s a STEM career ? STEM in career STEM employment
Presentation transcript:

EPIC UK funding situation Kieran Flanagan GUI meeting 3/6/2019

Priority Project Exercise 2018 50+ large scale projects were submitted to STFC in 2018 Reviewed by Science Board in October 2018 All STFC communities (advisory panels) ask to internally prioritize projects. Nuclear Physics Advisory Panel selected ISOLDE upgrade (EPIC) Involvement from across UK ISOLDE user community (Liverpool, York, Surrey, Manchester, Edinburgh, UWS) Accelerator and High power target groups contacted.

Presented Project Three major components High-power beam production and dual/parallel operation of low and high energy radioactive beam lines. The construction of a compact storage ring. The design and deployment of the next generation of detector systems. Break down allows CERN and UK leadership within aspects of the project (detector and laser expertise within user community). Cost estimates £110M capital and £70M resource over 8 years. NB: This exercise did not map to a funding call.

EPIC Schematic ISOLDE-V Accelerated Beams £27M £46M Enhanced proton beam delivery and dumps Four high power target stations and new separator area £46M Accelerated Beams STAR-MAKER storage ring Consolidation of HIE-ISOLDE £27M Advanced spectroscopy techniques In-ring and ISS DSSD +ASIC detectors MAXIBALL (silicon tracker array and expansion of MINIBALL) Advanced high resolution RILIS £38M Execution of the components of the project can be timed and organized to best match a constrained budget envelope.

Management Funding Bodies International Advisory Board CERN Resource Review Board Physics working group EPIC project management board ISCC KT group Collaboration Resource Board Technical Board Project management office WG1 WG2 WG3 Institutes

Potential involvement with community Conversations in 2018 with heads of groups ISIS high power target group at RAL Accelerator institutes in UK Potential future champions Advanced Materials (Henry Royce Institute) and radioisotope probed (in construction and as a future user) Advanced Manufacturing Other UK national research institutes

Next steps and funding Establish working groups and identify conveners and leaders Technical design study and costing Organize upgrade workshops at CERN STFC opened (at extremely short notice) the Opportunities call to pump prime major initiatives. £140k per bid to cover networking and proof of concept studies over 18 months (1 FTE technical fellow for 12 months + travel + PI). (Personal view) Expand user community and relevance of ISOLDE to drive large scale investment.

TDR phase Funding Bodies International Advisory Board CERN Resource Review Board Physics working group EPIC project management board ISCC KT group Collaboration Resource Board Technical Board Project management office WG1 WG2 WG3 Institutes