London City Airport Bernard Lavelle Sales
Where are we today? Days before London City Airport London City Airport today
The ONLY Airport in London!
London City Airport: Connections
Service Features – 20/10 No queues 20 minute check in Easy and quick access to London Business environment 10 minutes from plane to taxi Fastest processing times in Europe Quick, easy & efficient to get through LCY Fast track airport – no fuss, no bother, no reason not to use LCY
LCY v LHR/LGW – Typical Cost Waterloo – LHR/LGW Tube £4.50 HEX/GEX £20.00 (£25.00 on board for HEX) Total £24.50 Waterloo – LCY Tube/DLR £4.50 Difference £20.00 Assume 20,000 journeys pa Minimum saving £400,000 £ £ £ £ £ £ £ £ £ Add in time saving on top (c3 hours for a round trip)
LCY m passengers in M expectation Airlines, 44 destinations Largest airline by pax & Capacity is BA
Current Operators
Current Route Map
Connecting flight opportunities from LCY Connect To Dep Aberdeen Amsterdam Antwerp Basel Dundee Dublin Edinburgh Frankfurt Glasgow Geneva Nuremburg Rotterdam Zurich Connect To: Arr Arlanda (Stockholm) Billund Edinburgh Glasgow Linate (Milan) Madrid Orly (Paris) Rotterdam Zurich Connect To Dep Orly (Paris) Geneva Connect To Arr Amsterdam JFK (New York) Luxembourg Nante Zurich Connect To Dep Amsterdam Arlanda (Stockholm) Billund Bern Dresden Dublin Frankfurt Geneva Jersey Luxembourg Madrid Rotterdam Connect To Arr Antwerp Dundee Edinburgh Glasgow Kristiansand Rotterdam Assumes 30 MCT, 90 minute max wait Min 24 Destinations
London City Airport: IOM-LCY History
Jersey European/British European Euromanx & VLM (Euromanx stops May08) 2009 Aer Arann & VLM (VLM stops July 09) April 2012 Aer Arann 2012 June - BA Chequered History….. Connection into London & the business & financial district important? Never been a better product!
London City Airport: Into The Future
LCY: City Airport Development Programme (CADP)
LCY: Vision for the Future LCY: a Vision for the Future Permission granted for 120k movements per annum A vision of 6 million passengers by 2023 Development of the airport to provide additional business & leisure destinations LCY as the gateway to London – as London moves east
Peaks - Optimising Runway Capacity Current configuration – 38 movements per hour Additional entry point – 42 movements per hour Full parallel – c50 movements per hour16
London City Airport 2020
East Development: Indicative Visualisations (WIP)
London City Airport: Divider 2011 London City Airport Thank you!