London City Airport Bernard Lavelle Sales

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Opening Address: Refining and Generating Ancillary Revenue Michael Cawley, COO & Deputy CEO, Ryanair.
ThemeGallery PowerTemplate
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
Using High Speed Rail to Achieve Connectivity and Integration Prof Andrew McNaughton.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
Business Air Charter A cost effective alternative to scheduled travel - an outline of business benefits.
NORDUnet 2000 Commercial Pan-European Networks Helsinki, 29 September 2000 Frode Greisen, GTS
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
The Stockholm Trials - Congestion charge in Stockholm Muriel Beser Hugosson, PhD.
Toulouse, May 2011, Slide 1 20 x 20. Toulouse, May 2011, Slide 2 20 x 20.
Alastair Duff Chairman- Heathrow Area Transport Forum Heathrows Sustainable Transport Strategy.
Republic of Slovenia Ministry of Public Administration One stop shop for companies – never so close Tomaž Vidic, M.Sc. (Head of One stop shop.
QUIZ : A very special Trivial Pursuit : So you think you're an expert on the European Capitals of Culture? Tuesday 23 march
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
Miss Woodworth Math Jeopardy Multiply Money Time zone Rounding Numbers
Timetables. How long does a journey take? If you wish to find out how long a journey lasts, you need to know the start time and the end time of the journey.
Writing times in digital
Multiplication and Division
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Unleashing the potential of airports: Turning the Intelligent Airport vision into reality 1.
Measuring Time. Learning Goals To measure time, we start counting units of time when the activity begins and stop counting when the activity ends. The.
Break Time Remaining 10:00.
This module: Telling the time
Kronos Timecard Pay Rounding Tips.
| | 1 Intermodality Air/Rail Intermodality air/rail at Munich Airport – reality and vision Flughafen München GmbH Dr. Wilhelm Wolters.
KARACHI FASHION WEEK CHAPTER 3 JANUARY 27 – 30, 2011 FASHION RUNWAY SHOW FASHION RUNWAY SHOW BRAND PRESENTATIONS BRAND PRESENTATIONS FASHION BRANDS EXHIBITIONS.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Outline Minimum Spanning Tree Maximal Flow Algorithm LP formulation 1.
Dallas/Fort Worth International Airport Airport Overview and Air Service Development Transportation Club of Dallas/Fort Worth September 10, 2007.
© 2008 Amadeus IT Group SA 1 Amadeus Airport Express Tatyana Luchshikova, BSM CESE 26, May 2009 Taking customers further than just the airport.
Stockholm Arlanda Airport Communication – a necessity Tourists Business people Political leaders Athletes Researchers Performers Students Entrepreneurs.
Fastway & Gatwick airport Tom Hall Sustainability engagement manager.
Transportation and Air Traveler Characteristics Findings from the 2011 Washington-Baltimore Regional Air Passenger Survey Transportation Planning Board.
Three Key Process Measures: Flow Rate
1 Auckland Airport Martin Fryer Sustainability Advisor.
GM Commercial and Customer BA CityFlyer
- European CDM - Collaborative Departures Sequencing Optimising departure sequence according to the priorities of Airline and Airport as well as Tower.
Network Manager User Forum 2014 A-CDM Challenges & Perspectives Lessons learnt at Paris-CDG 29th January 2014.
15. Oktober Oktober Oktober 2012.
 Introduced in December 2009  Operated by Southeastern  At speeds of up to 140mph by Hitachi “Javelin” bi- mode electric trains.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
We are learning how to read the 24 hour clock
Adding Up In Chunks.
The Future of Higher Education in Further Education Colleges Swindon 17 May 2007.
Our trip to U.S.A (London) By Max and Sung Ju. Where are we going? We are going for a vacation in Mississippi, Washington DC, and California.
”Visioner och Vägval ” University Board term. Vision Visioner och Vägval.
Jodhpur Discom Presentation before Sh. Sudhansh Pant I.A.S. Chairman Discoms & Managing Director,J.V.V.N.L.,Jaipur
Apprenticeship Grant for Employers of 16 to 24 year olds (AGE 16 to 24) Employer Update Presented by DMT Business Services.
WA Dept of Commerce DLT Session The Future, Social Media & the Public Sector Social Media Trends - What the 3 May 2012 Perth Western.
: 3 00.
5 minutes.
Clock will move after 1 minute
NI Executive Budget 2010 Pre-Consultation. Outline Background and Context UK Fiscal Position Implications for NI Budget Way Forward Key Questions.
1 Unit 1 Kinematics Chapter 1 Day
Select a time to count down from the clock above
1 Access Line Operation Analysis & Case Study in Beijing Metro System Zhili Liu, Ph.D. School of Traffic and Transportation Beijing Jiaotong University.
FEDERAL STUDENT AID AND COMMUNITY COLLEGE STUDENTS Sandy Baum George Washington University Graduate School of Education and The Urban Institute North Carolina.
7 reasons to locate your business in the UK $17 trillion EU market 8 out of 9 of Europe’s top universities Highest graduate output in Europe Hundreds.
Norway High Speed Rail Michael Hayes Project Director Contract 5: Market Analysis.
Gordon Dewar Chief Executive Edinburgh Airport Runways Conference 2014.
1 Runways UK – FIRST CLASS PARTNERSHIPS LIMITED – All rights reserved The Train to the Plane Lessons from international best practice Michael Schabas,
Starter The following times are all in hours. Change them into hours and minutes… a)0.5 hours b)2.5 hours c)3.5 hours d)1.25 hours e)3.75 hours How would.
INCREASING THE NUMBER OF BUSINESSES IN THE AREA BY MICHAEL, JOE AND PATRICK.
Welcome to Stockholm EGEE Enabling Grids for E-Science Conference September 2009.
Trade partnership activity & Market Development 2016.
Airline Seat Capacity 2010 Mr Alan Borg, Head Airline Marketing 16 th April, 2010.
Easy Jet 2011 Q1. PART 1: EASY JET – BERLIN3 PART 2: EASY JET - DORTMUND11 PART 3: EASY JET - GENEVA19 PART 4: EASY JET – LONDON LGW27 PART 5: EASY JET.
Presentation transcript:

London City Airport Bernard Lavelle Sales

Where are we today? Days before London City Airport London City Airport today

The ONLY Airport in London!

London City Airport: Connections

Service Features – 20/10 No queues 20 minute check in Easy and quick access to London Business environment 10 minutes from plane to taxi Fastest processing times in Europe Quick, easy & efficient to get through LCY Fast track airport – no fuss, no bother, no reason not to use LCY

LCY v LHR/LGW – Typical Cost Waterloo – LHR/LGW Tube £4.50 HEX/GEX £20.00 (£25.00 on board for HEX) Total £24.50 Waterloo – LCY Tube/DLR £4.50 Difference £20.00 Assume 20,000 journeys pa Minimum saving £400,000 £ £ £ £ £ £ £ £ £ Add in time saving on top (c3 hours for a round trip)

LCY m passengers in M expectation Airlines, 44 destinations Largest airline by pax & Capacity is BA

Current Operators

Current Route Map

Connecting flight opportunities from LCY Connect To Dep Aberdeen Amsterdam Antwerp Basel Dundee Dublin Edinburgh Frankfurt Glasgow Geneva Nuremburg Rotterdam Zurich Connect To: Arr Arlanda (Stockholm) Billund Edinburgh Glasgow Linate (Milan) Madrid Orly (Paris) Rotterdam Zurich Connect To Dep Orly (Paris) Geneva Connect To Arr Amsterdam JFK (New York) Luxembourg Nante Zurich Connect To Dep Amsterdam Arlanda (Stockholm) Billund Bern Dresden Dublin Frankfurt Geneva Jersey Luxembourg Madrid Rotterdam Connect To Arr Antwerp Dundee Edinburgh Glasgow Kristiansand Rotterdam Assumes 30 MCT, 90 minute max wait Min 24 Destinations

London City Airport: IOM-LCY History

Jersey European/British European Euromanx & VLM (Euromanx stops May08) 2009 Aer Arann & VLM (VLM stops July 09) April 2012 Aer Arann 2012 June - BA Chequered History….. Connection into London & the business & financial district important? Never been a better product!

London City Airport: Into The Future

LCY: City Airport Development Programme (CADP)

LCY: Vision for the Future LCY: a Vision for the Future Permission granted for 120k movements per annum A vision of 6 million passengers by 2023 Development of the airport to provide additional business & leisure destinations LCY as the gateway to London – as London moves east

Peaks - Optimising Runway Capacity Current configuration – 38 movements per hour Additional entry point – 42 movements per hour Full parallel – c50 movements per hour16

London City Airport 2020

East Development: Indicative Visualisations (WIP)

London City Airport: Divider 2011 London City Airport Thank you!