Proposal to issue first report in December 2018 XRN4790 – Introduction of winter read/consumption reports and associated obligation (MOD0652) Proposal to issue first report in December 2018
Achieved by submitting a read in Nov/Dec and Mar/Apr each year XRN4790 – Introduction of winter read/consumption reports and associated obligation The Modification puts an obligation on the User to gain a ‘winter consumption calculation’ Achieved by submitting a read in Nov/Dec and Mar/Apr each year A winter consumption will place the meter point in the appropriate war band For Meter Points with no winter consumption calculated are assigned to a default war band (known as bucket band)
Proposal for delivery of report 1 – no read in November First report to be issued in the Gas Year provides the Registered User with a view of all meter points for which an actual read is not recorded in November Ordinarily due to be issued early December To benefit the progress for gas year 2018/19 Xoserve could run and issue this report post approval at DSC Change management Benefits the ongoing deliverable of the reports specified in the Change proposal Supported by both DSG and the proposer (will also take to UIG workgroup on 7th Dec)