Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL 2017 - SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.

Slides:



Advertisements
Similar presentations
East Carolina University Compressed Gas Safety Training Program
Advertisements

Cryo Capture Cavity II Progress Mike McGee April 6, 2005.
Gauges and well logging
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
ESS cavities interfaces
Joint ILC/CLIC Safety document ► Incentive for this document:  Share effort to define a coherent safety protocol for future linear colliders.  Insure.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Safety Requirements and Regulations 10/3/20121Safety Requirements & Regulations James Sears.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Preliminary Functional Analysis of ESS Superconducting Radio-Frequency Linac C. Darve, N. Elias, J. Fydrych, D. Piso European Spallation Source ESS AB,
Manufacturing process, validation and factory test
Date 2007/Oct./23 FNAL-GDE-Meeting Global Design Effort 1 Cryomodule Interface Definition (FNAL-GDE-Meeting) N. Ohuchi.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Reliability of SNS Superconducting Linac April 12, 2011 Jeff Saunders SNS/ORNL.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
Safety - Lessons learnt from the design, commissioning and operation of the HIE-ISOLDE cryomodules Safety overview ESS 8 June 2016 AP.Bernardes/EN on behalf.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
Overview of elliptical cryomodules vacuum system Vacuum Equipment Standardization meeting February 2014 P. Bosland – C. Darve – N. Elias.
DTU A VISION OF SUPPORTING NEUTRON CHOPPER ESS PT 1 - BUNKER SYSTEMS Discussion Document.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
Crab Cavity Technical Coordination meeting:
Status of the M-ECCTD F. Peauger - P. Bosland
Medium Beta Elliptical Cryomodule CDR Closeout
Cryomodule test stand at ESS site
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
at STFC Daresbury laboratory
Medium beta cryomodule demonstrator M-ECCTD
T5.2: Harmonization - Material and Component Reference
DESY Experiences on Use of Gas overlay during Assemblies
Uppsala Commitment to ESS and FREIA Planning
Definition of work flow for string DESY Example on critical operation
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
XFEL Tuner system non-conformities Detected At saclay
UK RFD Pre-Series cryomodule
WP 3 coordination meeting Saclay May 2008
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
East Carolina University Compressed Gas Safety Training Program
MAX IV Beamlines Maintenance
ESS elliptical cryomodule
Installation Binder / IRR – an example
Cryomodule Assembly Plan
Daresbury ESS In-Kind Contributions
F. Peauger (mainly for CM components)
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Radiation Protection Handbook
System tests at CEA O. Piquet 19/03/2019
Quality assurance and Quality control organisation
Parker domnick hunter. Safety of Electrical and
Bonjour. Franck Peauger. Je suis Ingénieur RF accélérateurs au SACM
ACCSYS Collaboration Board Triestre, 3rd october 2017
Burst Disc Experiences at CEA Test Stand
CEA: Status of CEA Activities on the SRF cavities and cryomodules
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL 2017 - SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND SAFETY MANAGER)

SAFETY FOR THE ESS CRYOMODULE 03-04/04/2017 Safety and RAMI inputs

ESS tests areas N Both CV2 : Cryo & RF tests for cavities BOTH: reception, control, storage, assembly area ESS/SARAF bunker : RF conditionning & tests for CM Barge RF Cleanroom : couplers & cavity string assembly RF conditionning for couplers CV2 : Cryo & RF tests for cavities Chemicals treatments for cavities CV2 N 03-04/04/2017 Safety and RAMI inputs

Safety Risks analysis « Prototype phase » « Industrial phase » Safety studies of existing experimental stations ESS safety study for the CEA Saclay Safety Local Commission (CLS) authorization (April-May 2017) Radiation protection study Equipment under pressure study (PED) Prevention plans, fire permits, etc. for work sites to fit out ESS areas « Industrial phase » Safety & environmental requirements for ESSI specifications ESSI safety study for the CEA Saclay Safety Local Commission (CLS) authorization Prevention plan with the chosen industrial partner for the assembly production 03-04/04/2017 Safety and RAMI inputs

MAIN Hazards for ESS tests in saclay Risk of anoxia Cryogenic hazard Chemical hazards Noise Ergonomics Ionizing radiations Non ionizing radiations (RF) Handlings Electrical hazard Fire Interferences 03-04/04/2017 Safety and RAMI inputs

Safety management & exploitation Works, logistics, environment, health and safety team 2 Team leaders on each experimental station General safety rules, procedures, safety instructions Twice-monthly meetings to manage exploitation and prevent interferences Quaterly meetings for land use of Synergium infrastructure Prior authorization sheet to begin a test Safety inspections & safety drills Periodical and regulatory controls of equipments Safety training plan, medical supervision, personal protective equipments 03-04/04/2017 Safety and RAMI inputs

Ionizing Radiation protection for CM Tests (1/2) Radiation calculations and simulations 15 MeV (uprating) Beam toward the North Usual concrete (uprating) Cartography in hourly dose rate (H*(10)) for an electrons flow at 0,1 nA (adapted for a 4% pulsed cycle) >> Exposure level outside bunker compatible with public people 03-04/04/2017 Safety and RAMI inputs

Ionizing Radiation protection for CM Tests (2/2) Radiation protections : concrete bunker with roof Homogeneity control of the bunker with an Xray generator Plugging of leaks with Lead (bricks, leaves, balls) Safety chain RF shutdown beyond public level outside Controls of the chain by radiation protection team Monitoring of radiations levels : > Gamma rays measurer (hourly dose rates) > Neutrons measurer (hourly dose rates) > Cartographies around the bunker by radiation protection team > Dosemeter films around the bunker Radiation prevention plan (DIMR), procedures, signs, restricted access area Authorized staff, safety trainings Ionizing chamber 150 nSv/h-0,15 Sv/h OK for Pulsed cycle 03-04/04/2017 Safety and RAMI inputs

RAMI RAMI = Reliability, Availability, Maintainability and Inspectability Objective: reduce the risk level of a main function breakdown decrease the time to repair WHAT can go wrong, WHERE and WHEN Strategy: spare components back-up systems Maintenance component standardization systems design optimization 03-04/04/2017 Safety and RAMI inputs

What can go wrong Very preliminary analysis WHAT PROBLEM WHERE 1 Cavity failure 2 Stepper motor Tuning system 3 Piezo actuator break 4 Cryogenic circuit Flange leak Gasket connections 5 Elastomer gasket degradation Vacuum vessel 6 Internal RF cable From cavity pick-up port to vacuum vessel port 7 Helium valves Top of the vacuum vessel extremities 8 Vacuum gate valves vacuum vessel extremities 9 Ceramic Power coupler or pick-ups 03-04/04/2017 Safety and RAMI inputs

Thank you Safety and RAMI inputs Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | 91191 Gif-sur-Yvette Cedex T. +33 (0)1 69 08 76 11 | F. +33 (0)1 69 08 30 24 Etablissement public à caractère industriel et commercial | RCS Paris B 775 685 019