Feedback from IKON 14 Spectroscopy.

Slides:



Advertisements
Similar presentations
Project Cycle Management
Advertisements

FCMAT Response & Preparation: Process Outline October 25, 2006.
Page 2 Agenda Page 3 History –Blue Print, 2000 –GIS Process 1.2, 2001 (training only) –GIS Process 2.0, (ITIL based - not implemented) –Supply/Demand.
Andrea Santangelo, Kepler Center-Tü Toulouse, February 2, 2012 “The Organization of the EUSO- Balloon mission” Andrea Santangelo * Kepler Center for Astro.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Project Planning Update 13th Technical Board Meeting Luisella Lari Head planner for Accelerator & Senior Scientist May.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
UK Interest & Input to the Factories of the Future Horizon 2020 Roadmap. © ActionPlant 2011.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
ISIS Project Status Report May 18, 2006 Prepared by MAXIMUS, Inc Education Systems Division for the ABT Committee.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Interfacing instrument teams with ESS and STAPs Ken Andersen ICB5, Copenhagen 7 th March 2016.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Rob Connatser NSS Instrument Work Packages and XLPM.
ELENA installation progress F. Butin / ELENA collaboration.
Collaborative & Interpersonal Leadership
WP High Beta Cavities Delivery
Continuous Improvement Project (A Guideline For Sponsors)
Mandate Priorities Other tasks Membership Forthcoming reports to CTC
News and Introduction from CERN June 15th, 2005
Cryomodule test stand at ESS site
Areas Separate Approaches Parallel Approaches Joint Approaches
Data & Technology Updates April, 2016
ESS RF Development at Uppsala University
1) Project Outline/ Assignment Sheet 2) Project Grading Rubric
Management Breakout: MREFC Budget Summary Victor L
Welcome & Charge for the Meeting
X-DIS/XBRL Phase 2 Kick-Off
DSC ChMC CSS update 11th December 2018
ESS Project Status Roland Garoby – Technical Director August 2018.
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
ESS Freia Scope Setting ESS - Lund - 17/10/2016.
NSS Instrument Project Tollgate Coordinator
Action List.
Project delivery RIBA stages Define design deliver Key Objectives 1 2
NSS Instrument Project Tollgate Coordinator
The Bunker Project Overview Zvonko Lazic
Remote Handling Workshop Introduction
The Common Shielding Project
Industry Engagement Program Medical Diagnostic Imaging (MDI) Equipment
Bunker Internal Review Welcome & Charge
Science Support Systems at ESS
MET Session workshop Job description Integration Engineer
Imaging & Engineering STAP Meeting 12th-13th of April 2018
BEER – General Update Nuclear Physics Institute CAS Přemysl Beran
Large Scale Structures
Overview Headlines RSP – Progress Overview General progress report
Welcome Update on ESS Construction Project
TG3 Process /Part 2 Gábor László NSS Lead Instrument Engineer
Technical Updates Gábor László NSS Lead Instrument Engineer
NSS integrated installation plan workshop Introduction
Spectroscopy STAP Meeting ESS, 8th of April 2019
Feedback from Instrument Teams at IKON14
Imaging & Engineering Diffraction STAP Meeting ESS, 21th of March 2019
How to deliver a Microsoft Cloud Workshop
Accelerator NCFE Liaison Officer
Test Beamline System Requirements and Charge to PDR Committee
Executive Project Kickoff
Bunker Critical Design Review Welcome & Charge
GLAST Large Area Telescope:
DMSC IKON Feedback In which areas have we made progress during this IKON meeting? Due to increasing pace of the project necessarily more communication.
Q2 Updates on 2019 Board Priorities
Q2 Updates on 2019 Board Priorities
East Hall under construction
Overview of the TARGET Monolith Rough Vacuum
Welcome and Charge for the Meeting
Presentation transcript:

Feedback from IKON 14 Spectroscopy

IKON feedback session - Spectroscopy In which areas have we made progress during this IKON meeting ? MIRACLES/T-REX: The topics and presentations are more focused on solving particular problems in the design and construction phases of the instruments (talks were more (too) general in the past) CSPEC/T-REX: Tollgate 3 overview is appreciated, collaboration on final documentation with instrument teams is necessary. MIRACLES/CSPEC/BIFROST: Remote handling CSPEC: Timelines are clearer T-REX: Acknowledgement that timelines have to be redefined What and who enabled this progress ? [provide examples how we progressed, what has been required to succeed and name those teams who inspired / supported you] MIRACLES: Don’t know, probably the fact that some members of the instrument teams are involved in the organization, or that the NSS and Integration Engineers, have taken the lead with respect to the topics.

IKON feedback session - Spectroscopy What topics shall we address jointly now ? MIRACLES/BIFROST/T-REX: Rearrange the new schedule. Impact of delays MIRACLES/T-REX: Sample environment pool Workshops - update MIRACLES: Risk: to leave last instruments behind (rising) MIRACLES/CSPEC/BIFROST/T-REX: Ongoing discussion shielding standardization proposal? We need a detailed outline of the proposal (contract): timeline, what work will be performed, how does the shielding team envisage interacting with the instrument team, reporting structure. CSPEC: URGENT! Finalise bunker details. CSPEC: SEMI-URGENT: Monitors and interaction with ISIS to deliver thin novel monitors. T-REX: URGENT! definition of TA How can my team help ? On which timeline and with whom – from ESS core team or partner sphere ? [provide examples for a constructive way forward indicating importance / urgency, provide your (potential) contribution and what you need from others]

IKON feedback session - Spectroscopy Which focus for the next IKON meeting in Sept. 2018 ? CSPEC/T-REX: The instrument teams would really like to see some results from the other instruments – for instance all instrument teams have gone through STAP meeting which focused on sample environment(for example) – it would have been nice to see the cave structure/sample environment/real details from some of the more advanced instruments. CSPEC/T-REX: Less focus on download from ESS – we do not need talks from John, Andreas and Shane – too much overlap between these talks. CSPEC/T-REX: Number of parallel talks (3 at most) is much appreciated. BIFROST/MIRACLES/T-REX: detailed breakdown of budget for infrastructure: racks, outlets, chicanes bunker shielding, HV cables,… T-REX: time for PSS [speculate on the ‘hot topics’ in 6 months and how they can be tackled] MIRACLES: Flange and floor instruments standardization (flange-to-sample distance, SE alignment) MIRACLES/CSPEC: Utility supplies – electrical, water, gases. Full overview, exact location of outlets,.. MIRACLES: Bunker project (outcome of CDR and interfaces with instruments) CSPEC: In-bunker details, exact examples from teams showing the engineering realities, vacuum housing, cabling, remote handling realities, windows, feedthrough. MIRACLES: NBOA procurement process update MIRACLES/CSPEC/BIFROST/T-REX: Beam monitors, definition of T=0, etc… CSPEC: Shielding calculations/design Who to involve in the preparation ? Everybody?