Electronics, motion control and verification

Slides:



Advertisements
Similar presentations
Hardware Integration of the Prototype Wes Grammer NRAO September 24-26, 2012EOVSA Prototype Review1.
Advertisements

Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
ESS LLRF System Anders J Johansson.
Status of MicroTCA LLRF Development Zheqiao Geng On behalf of the LLRF AIP team 6/4/2012.
Module 2: Hardware and Terminology
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
SCADA and Telemetry Presented By:.
Susanne Kersten, Wuppertal University November 21/22, 2013.
March 2011 AMC and uRTM load boards Introduction Main functionalities and features Block diagram overview Status and plan.
DFC on behalf of controls software and electronics groups Tango meeting March 19 th 2007 Status of Alba Controls.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
ESS LLRF and Beam Interaction. ESS RF system From the wall plug to the coupler Controlled over EPICS Connected to the global Machine Protection System.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ACT20X Ex isolator/ amplifier. Page 2 ACT20X (Ex isolators family) Overview - Connects to process equipment in Class/Div, or Zone 0 - Zone 2 areas - ACT20X.
BCM electronics: status and plans BI forum (Feb. 10 th and 11 th 2016) Hooman Hassanzadegan ESS, BI section 1.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
Krzysztof Czuba, ISE, Warsaw ATCA - LLRF project review, DESY, Dec , XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Master Oscillator.
ESS LLRF and Beam Interaction
MicroTCA Development and Status
MICE RF System Power Supplies, Control and Monitoring Status report
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
Analog FE circuitry simulation
SCADA for Remote Industrial Plant
Overview and System Design for ESS LLRF Systems
Injectors BLM system: PS Ring installation at EYETS
Christian Veelken last updated 11/09/06
Construction and Commissioning of Electronic Test Benches
New xTCA Developments at SLAC
352MHz Klystron Control for the 3MeV Linac test stand
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
Status of the Front Tracker GEM
Front-end electronic system for large area photomultipliers readout
Electronics: Demod + 4Q FE
LLRF and Beam-based Longitudinal Feedback Readiness
Pierluigi Paolucci - I.N.F.N. Naples
BESIII EMC electronics
MCP Electronics Time resolution, costs
TPC Detector Control System
RF Local Protection System
BCM-BIS Interface Szandra Kövecses
Testing and deployment
Ion Source and LEBT control system topology, Interlock strategy
Krzysztof Czuba ESS LLRF Quarterly Meeting
Risk, Schedule, Deliveries
Safety, reliability and maintainability
PID meeting Mechanical implementation Electronics architecture
icBLM verification plan
MPS commissioning at ESS
Towards final BCM firmware and interface to MPS Hooman Hassanzadegan BI forum, Nov 2018, Lund
Control Systems for the APTM and GRID
Hilko Spoelstra, Vacuum Group Specialized Technical Services / AD
Cables, Racks, and the rest
Clement Derrez European Spallation Source ERIC Date
Clement Derrez Test Engineer
RF introduction Anders Sunesson RF group leader
Beam Position & Charge Monitors LCLS Lehman Review July 11, 2007
Response to the BCM PDR recommendations
ISrc & LEBT – ICS Installation Readiness Review
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Electronics, motion control and verification CDR DTL FCs Electronics, motion control and verification www.europeanspallationsource.se Lund, December 13rd 2018

Electronics – system overview All LINAC FC electronics located in FEB-030ROW:CNPW-U-007 Based on mTCA upgrade of the LEBT FC system Motion control, Interface with HVPS and MPS: EtherCAT Additional feature on DTL FC: Low latency link with BCM for differential measurements

Electronics – system overview One mTCA crate for all systems, equipped with: MRF EVR CPU PS MCH Signal acquisition: Struck SIS8300 AMC and SIS8900 RTM Same hardware family as the BCM. Facilitates the low latency link implementation Front End: Consists of a resistor and surge protection (added after Catania experience) at rack patch panel level. Cable length on DTL FC is double the one of the LEBT FC (60m vs 30m). FE Electronics in the tunnel is avoided if possible. One ISEG HV module per FC One Ethercat crate for all systems Interface with MPS: Movement permit in Cooling status out Controller health status out

Electronics – Front End Requirements: Accuracy: 10 % FS ( 10 mA) Bandwidth: 300 kHz mainly limited by cable length LEBT cable length: 30m, DTL: 60m Overvoltage protection: using a surge arrestor and protection diode at the back of the RTM Based on simulations and measurements results on the LEBT FC system, extrapolating for twice longer cables:  Better than 2 MHz bandwidth  Better than 1 mA pkpk noise To Do: verification tests with long cables in lab. We can use a twinax cable reference for lower capacitance

Ethercat – system overview Each Faraday Cup uses the following modules ES3602: analog input, bias current and voltage read back from ISEG (2 channels module) ES4134: analog output, ISEG bias current and voltage setpoints (4 channels module) ES2124: digital output 5V, ISEG bias output control (4 channels module) ES2004: digital output 24V, move FC, MPS outputs (4 channels module) ES1014: digital input 24V, in and out switches readout, water flow sensor, MPS input (4 channels module) EL3214: 4-channel input terminal PT100 To and from mTCA: Ethernet ECAT + To and from MPS PP, 3 cables To and from HVPS (ISEG, SUBD9)

Ethercat - motion Faraday Cup motion: pneumatic actuator Based on a Festo electrovalve reference 2 sets of end of stroke switches: one directly connected to MPS one connected to EtherCAT control system FC moves out of beam if we loose power on the LEBT system

Verification LEBT FC verified before first beam Handed over to operation, although verification with beam not complete First beam measured in september Same verification will be performed sequentially on the DTL FC channels Verification in BD lab cold check-out commissioning with beam Differential measurements tests with BCM added to verification plan