SPP Wind Workshop: SPP Update on Internal Process Improvements

Slides:



Advertisements
Similar presentations
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Advertisements

Example T1: T2: Constraint: Susan’s salary = Jane’s salary
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
©Brooks/Cole, 2001 Chapter 2 Introduction to The C Language.
Microsoft Excel Integration Project Linking an Excel Worksheet to a Word Document and Web Discussions.
Introduction to Computer Science /16/15. Introduction and Attendance Handout.
Permit Implementation Regulations (AB 1497) Package Update Key Issues 1. Significant Change and Modified Permit Process 2. Public Noticing and Hearing.
SPP.org 1. 2 Aggregate Transmission Service Study (ATSS)
Martin Kelly Using the Tutor Guide: Communication Units in HNCs and HNDs The purpose of this document is to provide a selection of formative exercises.
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
The Journey We made it! But the journey is not over…
Paul Cotton, XML Query WG1 Querying XML Documents Paul Cotton ZIG Washington, Dec 7, 2000.
1 Copyright © 2004, Oracle. All rights reserved. Introduction.
SACM Requirements Nancy Cam-Winget March 2014.
NACCC Website A brief introduction AGM Has your centre registered yet?
Course FAQ’s I do not have any knowledge on SQL concepts or Database Testing. Will this course helps me to get through all the concepts? What kind of.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC September 2 nd, 2010.
Indexes and Views Unit 7.
UNFCCC WORKSHOP ON METHODOLOGIES ON CLIMATE CHANGE IMPACT AND ADAPTATION back-to-back with UNDP-GEF WORKSHOP FOR DEVELOPING AN ADAPTATION POLICY FRAMEWORK.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
2013 Wind Conference. Transmission Service Study Process Steve Purdy.
WEBSITE DESIGN PROPOSAL Presented By. CONTENT Requirements summarize Web site content Demonstration of prototype Competitor website in market.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
May 11, 2012 RPG meeting YTP Scope and Process – RPG Comments.
1 Announcements Reading for next week: Chapter 4 Your first homework will be assigned as soon as your database accounts have been set up.  Expect an .
DWG Procedural Manual: Wind Model Requirements DWG Request to ROS August 11, 2006.
International Conference on Smart Energy Systems and 4th Generation District Heating Copenhagen, August 2015 A methodology for designing flexible.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Operational Planning Jason Smith. Operational Planning Goals –What Ops Planning is –What Ops Planning is not –What rules we operate under –Limitations.
SPP-Entergy Market Power Analysis Update Presented By: David B. Patton, Ph.D. President, Potomac Economics April 16, 2008.
HISTORICAL MARKER: SOUTHWEST RANCHES COMMUNITY AND HURRICANE KATRINA.
EIM/EDT Update ColumbiaGrid Planning Meeting June 2, 2011.
WebServices Testing – Functional / Non Functional Rajesh Charles.
Don’t reinvent the wheel: resources to support the teaching of academic skills across the curriculum. Helen Howard and Michelle Schneider
Reliability Must Run Workshop Introduction May 24, 2016.
Presentation 15.1 Proposed revision points of PSIP Preparation Handbook Yuki Kobayashi-Sangala JICA-CEPSIP2 August 2015.
Grant Funding Workshop
PEL Vs MDX By Jeremy Kashel TVP, 17th July 2008
Final Checks Finish your essay.
Database Fields for DR PNDRP January 2014.
SysML 2.0 Model Lifecycle Management (MLM) Working Group
Shankar Chandrasekaran
يقول الخلاق العليم: (والله أخرجكم من بطون أمهاتكم لا تعلمون شيئًا وجعل لكم السمع والأبصار والأفئدة قليلاً ما تشكرون) ("النحل" 78)) . الإهتزازات والموجات.
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.
زبان بدن Body Language.
Campus-Wide Business Manager’s Meeting August 18, 2016
Support services survey Update
مناهــــج البحث العلمي
Chapter 1: Introduction
2013 Wind Conference.
Western Electricity Coordinating Council
State of play endocrine disruptors
Financial Feasibility studies
Rule 21 Working Group 2 IN-PERSON WORKSHOP August 29, 2018
Western Electricity Coordinating Council
Request for Information IDC Granularity Option 3/3A
For Board Meeting Updated Projected Budget Deficits FY 2012/13 $ --
TC3 Workshop.
Chap 5: HSQL: A Historical Query Language
Virtual Campus Orientation
Change Highlights January 2013
Business Logistics Management
LANGUAGE EDUCATION.
OASIS Subcommittee Update 2/20/2018
Going Paperless with NCOPE
Developing On-Line Contact or Creating an On Line Learning Environment
Accelerator Safety Workshop SLAC
Presentation transcript:

SPP Wind Workshop: SPP Update on Internal Process Improvements August 6, 2013 Brian Strickland bstrickland@spp.org· 501.688.8308

Wind and Other Non-Dispatchable Resources

WNDR Webpage

FAQs around Curtailments

Link to Presentations

Query for Historical Constraint Information

Curtailment Reports

Other Helpful Links

Addition of Language in Aggregate Facility Study Reports Curtailment and Redispatch Evaluation Study Analysis Results Introduction

Additional Language Included in GI reports

Questions or Comments ?