PDK Declared Distances

Slides:



Advertisements
Similar presentations
FAASTeam CFI Workshop 8 Pilot Deviations Including Runway Incursions
Advertisements

Part 139 Training 1.
Hi, Im Mark McFarland! Presenting the finer points of how not to look too bored while attending these sessions when you could be on the on the golf course,
RECORD KEEPING Cooperative Development of Operational
Course Schedule three Assessment Scenarios Discussion Groups Discussion Groups.
ICAO State Safety Programme (SSP) Implementation Course
ICAO Part 139 Review Aerodrome Certification Rule Design Proposal
Performance Chapter 11.
1 FLL Construction Playbook RWY 10R / 28L April 17, May 6, 2013 Phase 1 Only ~ RWY 9R Closes.
AeroMetric, Inc. Presents: An Airports GIS Lecture Series
Airport Layout Plans (ALPs)
International Coordinating Council of Aerospace Industries Associations Preventing Runway Excursions Technical solutions From the Design and Manufacturing.
Presenter Todd G. Johnson, Airport Solutions Specialist September 14, 2012.
Colorado Springs Airport
Vance Brand Municipal Airport
FAA Airports GIS (AGIS)
Airport Obstruction Issues GAA Workshop March 14 th, 2014 Presented by: Alan Hood, Georgia Department of Transportation Airport Safety Data Program Manager.
Federal Aviation Administration FAA Airports Programs Update IRWA Federal Agency Update Washington, DC March 24, 2014 Rick Etter FAA Office of Airports.
ATO-NATIONAL FLIGHT PROCEDURES GROUP NEW YORK FLIGHT PROCEDURES GROUP FEB 2006 Federal Aviation Administration 1 February 2006 NY FPO OFFICE LATERAL PRECISION.
29 th Annual Airports Conference Hershey, PA Kenneth Jacobs FAA Airport Engineering Division March 1, 2006 Federal Aviation Administration Runway Safety.
Caltrans Division of Aeronautics1 Association of California Airports Conference, South Lake Tahoe September 19-22, 2007 California Aviation System Plan:
Airport Development Process - Airport Capital Improvement Plan (ACIP)
MAJOR REPAIRS AND ALTERATIONS
Lecture 3: Take-off Performance
 Premise 1 – What we don’t want ◦ We don’t want to own it. ◦ We don’t want to pay for it. ◦ We don’t want to maintain it.  Premise 2 – What we want.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
Flight Instructor Seminars August 2007
MIT Lincoln Laboratory RWSL OpEval PilotTraining, page 1 Aug 2006 MPK Pilot Training for Continued Operational Evaluation of Runway Status Lights (RWSL)
Quintin Watkins,P.E. Prime Engineering, Inc., Atlanta, GA
CERTIFICATION PRINCIPLES AND PROCEDURES
Best Practices for Taxi Operations at Towered & Non-Towered Airports
By: Date: FAA Overview Freely Associated States Jim Spillane, Sr. FAA Rep., Pacific Rim April 5, 2013.
Presented to: By: Date: Federal Aviation Administration Federal Grants and Airport Capital Improvement Programs Western-Pacific Region Association of California.
Presented to: By: Date: Federal Aviation Administration AEA Office of Runway Safety Runway Safety Initiatives Airports Conference Runway Safety 04/02/2012.
The airport operator’s perspective on runway excursion hazards and mitigation options Session 3 Presentation 3.
Auburn-Lewiston Municipal Airport Runway 4-22 Safety Area Environmental Assessment May 10, 2011.
Vincent Chu and Peter Hwoschinsky, FAA Maria Picardi Kuffner, MIT/LL
Best Practices for Taxi Operations at Towered & Non-Towered Airports
Office of Safety Recommendations and Advocacy Previous Safety Board Recommendations Jeff Marcus Safety Recommendations and Advocacy.
RUNWAYS. Runway Length Requirements  Governmental regulations  Airport location  Critical aircraft  Sources:
Gerard van Es 58th annual Business Aviation Safety Seminar
Office of Aviation Safety Delta Connection Flight 6448 Operated by Shuttle America Airport Issues.
“LEGAL ISSUES ASSOCIATED WITH AN RSA PROJECT” Mark Bautista Deputy General Manager Monterey Peninsula Airport David Prentice Scott Huber Stephanie Alford.
1 July 18, 2011 Runway 19 Dalton Departure Procedure Flight Crews requesting the Dalton 19 Departure MUST possess the chart and adhere strictly to the.
Presented to: Orlando Florida Flying Community By: The FAASTeam - Dennis H. Whitley Date: December 9, 2010 Federal Aviation Administration FAASTeam Orlando.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
Mark George Survival Factors Division
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Michael J. O’Donnell, A.A.E. Director of Airport Safety and Standards March 2010 Federal Aviation Administration FAA Eastern Region Annual Airports Conference.
By: FAASTeam Federal Aviation Administration Land and Hold Short Operations (LAHSO)
ICAO Requirements on Certification of Aerodromes Module - 2
Airport Markings & Signs
Aviation Management College Airport Management Ms.Zuliana Ismail
ASTM E17 Committee Mini-Seminar Dec. 5, 2006 Federal Aviation Administration 1 FAA PERSPECTIVE Airfield Pavement Roughness Presentation to: ASTM E17 Committee.
Presented by: Roger Sultan, FAA, AFS-400 Date: August 8, 2012 Federal Aviation Administration FPAW Summer CFR Part 135 Automated Surface Weather.
Dublin Airport Stakeholders Forum 26 th November 2008 Irish Aviation Authority Dermot Mc Mahon.
Unmanned Aircraft Systems. What is a UAS? What is a DRONE?
Aeronautical Facilities The term aerodrome refers to any area of land or water designated for the arrival, departure, movement and servicing of aircraft.
Lecture 4: Take-off Performance Speeds
Airport FAA 5010 Safety Inspections What does that mean???? Inspectors are responsible for reporting accurate information about all landing facilities.
2010 FAA Worldwide Airport Technology Transfer Conference Risk Assessment of RSA Alternatives at San Francisco International Airport Manuel Ayres Regis.
Federal Aviation Administration 0 Maintenance Workshop June 9, FAA Perspective on Part 145 Repair Stations in Europe Presentation to: Europe/U.S.
Integrating information towards Digital ATM Notices To Airmen Presented By: Lynette M. Jamison Date:August 29, 2013.
Aircraft Arrestor Systems EMAS
Flying Safety May 5 th, Mishap Review 2.New Symbols on Approach Plates 3.NASA Reports.
FAA / OAC Grant Assurances
Research on Frangible Connections and Structures
UNIT -4 AERODROME DATA.
UNIT -4 AERODROME DATA.
Presentation transcript:

PDK Declared Distances

PDK Declared Distances FAA Order 5200.8 Runway Safety Area Program states “All Runway Safety Areas (RSA) at Federally obligated airports shall conform to the standards contained in AC 150/5300-13, Airport Design, to the extent practicable.” Regretfully, PDK’s RSAs don’t comply.

PDK Declared Distances FAA Program Guidance Provides Airport operators are responsible for ensuring that the airport information published in the A/FD is accurate and current. Furthermore; an airport operator may use declared distances to satisfy the requirement for a runway safety area off a particular runway end. This in effect would shorten the runway length available to be used for ASDA and LDA.

Example of Declared Distances

PDK RWYs 02R / 20L Application RWY 02R – 6001’ Required RSA 1000’ Actual RSA at Departure end 410’ Currently published Landing Distance Available (LDA) – 5411’ RWY 20L – 5001’ Required RSA 1000’ Actual RSA at departure end 800’ Currently published by NOTAM Landing Distance Available (LDA) 4801’ We are working diligently to ensure the correct information (published by NOTAM) is included in the next publication cycle. Additionally, we are aggressively pursuing the installation of an Engineered Materials Arrestor System (EMAS) to serve the departure end of RWY 20L. The pavement remains the same.