NGAO Uptime Budget Keck NGAO Meeting #2 Tuesday, November 14, 2006

Slides:



Advertisements
Similar presentations
Arecibo Telescope Servo & Drive System Technical Meeting May 2004 VERTEX ANTENNENTECHNIK GmbH Arecibo Telescope Servo Drive System Ideas For Computer.
Advertisements

Index Values NATIONAL STATISTICAL COORDINATION BOARD.
Zhaobo Zhang Huawei Technologies (USA)
NGAO Controls Team Meeting August 29, 2008 Erik Johansson.
NGAO System Design Review Response Peter Wizinowich, Rich Dekany, Don Gavel, Claire Max for NGAO Team SSC Meeting June 18, 2008.
System-wide issues Before we get to the telescope System integration and verification at the telescope Operations Maintenance and support.
Planning “Science Operations” tasks for the PD phase NGAO PD Phase D. Le Mignant W. M. Keck Observatory 08/19/2008.
RedundancyMiner A novel method of clustering in genomic studies Barry Zeeberg, NCI Hongfang Liu, NCI and GU.
Science Operations Replan NGAO - Meeting 6 D. Le Mignant W. M. Keck Observatory 04/25/2007.
CSE 322: Software Reliability Engineering Topics covered: Software reliability models with explicit fault removal.
Science Operations Plan NGAO - Meeting 10 D. Le Mignant W. M. Keck Observatory 09/17/2007.
NGAO interface control documents: Christopher Neyman W. M. Keck Observatory Keck NGAO PD phase Meeting #6 March 19, 2007 Videoconference.
Observing efficiency for NGAO 1.Definitions 2.Lessons learned a)Keck LGS AO “efficiency” b)Keck AO brute conclusion 3.Observing efficiency budget 4. Observing.
(c) 2007 Mauro Pezzè & Michal Young Ch 10, slide 1 Functional testing.
NGAO operations thoughts D. Le Mignant, E. Johansson, C. Neyman.
NGAO System Design Phase System & Functional Requirements Documents NGAO Meeting #6 Peter Wizinowich April 25, 2007.
NGAO Performance Flowdowns R. Dekany 02 September 2009.
Design Team Report: Laser Facility Chris Neyman Jim Bell, Erik Johansson, Jason Chin W. M. Keck Observatory Viswa Velur Caltech Optical Observatories Keck.
Encouraging “System Level” Thinking Christopher Neyman, Erik Johansson, David Le Mignant W. M. Keck Observatory Viswa Velur California Institute of Technology.
System Architecture WBS 3.1 Mid-Year Replan Richard Dekany NGAO Team Meeting #6 April 25-26, 2007 UCSC.
NGAO topical discussion: Observing Efficiency and Uptime Budgets Telecon Meeting 12/7 D. Le Mignant and E. Johansson 7 Dec Attendees; R. Campbell,
California Association for Research in Astronomy W. M. Keck Observatory NGAO Next-Generation Adaptive Optics System NGAO Uptime Budget Keck NGAO Meeting.
Functional Requirements Status and Plans Christopher Neyman & Erik Johansson W. M. Keck Observatory Viswa Velur California Institute of Technology Keck.
Functional Requirements for NGAO Christopher Neyman W. M. Keck Observatory NGAO Team Meeting #9 August 24, 2007.
WBS Non-RTC Controls Erik Johansson, Jason Chin, Don Gavel, Marc Reinig Oct 31 th, 2007.
Trade Study Report: NGAO versus Keck AO Upgrade NGAO Meeting #5 Peter Wizinowich March 7, 2007.
Reliable PVFS. High Performance I/O ? Three Categories of applications demand good I/O performance  Database management systems (DBMSs) Reading or writing.
NGAO Controls Team Kickoff Meeting August 5, 2008 Erik Johansson.
Instrumentation on OIR Large Telescopes – A Case Study S. R. Kulkarni Caltech Optical Observatories.
by Marc Comeau. About A Webmaster Developing a website goes far beyond understanding underlying technologies Determine your requirements.
GOOSSENS (BE) Session 2 – Block 3 Barcelona May Improved Assessment of Voltage Dips with Common Monitoring Devices M. Bollen, A. Robert &
UNESCO Institute for Statistics Monitoring and Improving Learning in the 2030 Agenda Simple Road Map to a cross-national scale Silvia Montoya, PhD Director.
THE IRISH SOFTWARE ENGINEERING RESEARCH CENTRELERO© What we currently know about software fault prediction: A systematic review of the fault prediction.
W.M. Keck Observatory 26-April The next generation of EPICS at the W.M. Keck Observatory Presented by Jimmy Johnson, Kevin Tsubota.
1 Experience from Studies of Software Maintenance and Evolution Parastoo Mohagheghi Post doc, NTNU-IDI SEVO Seminar, 16 March 2006.
Keck Next Generation AO Next Generation Adaptive Optics Meeting #2 Caltech November 14, 2006 P. Wizinowich for NGAO Executive Committee.
Time Remaining 20:00.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
` Printing: This poster is 48” wide by 36” high. It’s designed to be printed on a large-format printer. Customizing the Content: The placeholders in this.
Part One INTRODUCTION TO BUSINESS RESEARCH
4.4. The financial sector summary
Working with Data Blocks and Frames
High Availability 24 hours a day, 7 days a week, 365 days a year…
White-Box Testing Techniques IV
Database Normalization
Subaru Telescope 2008 Masa Hayashi Subaru Users’ Meeting
Web Hosting Ashima Wadhwa
Historical development of approaches to road safety (Ogden, Chapter 2)
Sketching the Derivative
Statistical Testing Jonas Abromaitis IFM-0/2.
Hire Toyota Innova in Delhi for Outstation Tour
Laser(s) for Keck Observatory’s Next Generation AO (NGAO) System
EECS 582 Midterm Review Mosharaf Chowdhury EECS 582 – F16.
NGS AO Control Light from Telescope Telescope pointing offload
RM3G: Next Generation Recovery Manager
Title of Presentation with Font Sized Adjusted to Fit Available Space
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Identify Program and Map System
Insert Your Poster Title That May Wrap to the Next Line Here
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Interpreting Statistics
Insert Your Poster Title That May Wrap to the Next Line Here
IT 344: Operating Systems Winter 2007 Module 18 Redundant Arrays of Inexpensive Disks (RAID) Chia-Chi Teng CTB
WARNING WARNING WARNING WARNING WARNING WARNING WARNING WARNING
NGAO topical discussion: Observing Efficiency and Uptime Budgets
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Extra ER LAB #2.
Title of Presentation with Font Sized Adjusted to Fit Available Space
Presentation transcript:

NGAO Uptime Budget Keck NGAO Meeting #2 Tuesday, November 14, 2006 Erik Johansson

Roadmap to an uptime budget Review Keck AO statistics Currently have LGS AO stats Looking for NGS AO stats If not currently summarized, derive from Metrics database Attempt to get uptime statistics from other institutions Remove outliers Failures with large downtimes that can be avoided in NGAO, e.g.: K2 Laser timing board failure with no spares K2 WFC crashes K2 Laser failures may not apply to NGAO laser(s) Use remaining statistics as a starting point for a budget Iterate and fine tune

Review of Keck II LGS AO uptime statistics Major contributors to system downtime: AO Faults Laser Faults Other Faults (instrument + telescope) Space Command (?) Spotters (?) Laser traffic control (?) Should all these categories be considered as downtime?

Conclusions Not all current Keck failures/downtime will map directly to NGAO Primary downtime drivers will be laser and AO system reliability Need to break down AO and Laser faults into finer granularity to draw more and better conclusions