Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Jubail Industrial City A $45 Billion Super Project
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
UNITED NATIONS Shipment Details Report – January 2006.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
Safety Oversight System in India 20 TH SCM of COSCAP-SA 05 April 2011.
Your business pitching templates MedVentures Awards 2010 A N INITIATIVE BY ANIMA I NVESTMENT N ETWORK & THEIR PARTNERS.
MedVentures Your business pitching templates
©2008 SIVECO Romania. All Rights Reserved. February 16, 2014 PAN-EUROPEAN WORKPLACE MOBILITY PEWTA-EMPLOYERS 2009.
1 EU Strategy for the Baltic Sea Region Anders Lindholm European Commission DG Regional Policy, Territorial Cooperation.
Electric cars: part of the problem or a solution for future grids? Frans Nieuwenhout, Energy research Centre of the Netherlands ECN Sustainable.
Global ATM Operational Concept
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Module N° 6 – SMS regulation
Concession Agreement Tirana International Airport Nene Tereza
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Copyright © 2012 California Department of Education, Child Development Division with WestEd Center for Child & Family Studies, Desired Results T&TA Project.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULTIPLYING MONOMIALS TIMES POLYNOMIALS (DISTRIBUTIVE PROPERTY)
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
ZMQS ZMQS
Kosovo Ministry of Transport & Communications Pristina, June 2004.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
Richmond House, Liverpool (1) 26 th January 2004.
Champaign/Urbana, Illinois Willard Airport Community Air Development Task Force Meeting December 2013.
6/4/2014Nanni 1 SAS Safety of Airport Structures Program: 14:30 Welcome – Francesco Di Maio, Paolo Gasparini 15:00 Project Outline – Antonio Nanni 15:30.
1 Meeting carbon budgets – 5th Progress Report to Parliament Committee on Climate Change, June If you want to tweet about this report.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
Chisinau International Airport Modernization Project II.
Airport considerations and airport solutions Session 5 Presentation 3.
M E T R O P O L I T A N W A S H I N G T O N A I R P O R T S A U T H O R I T Y 1 Mobility Challenges at Washington Dulles International and Ronald Reagan.
Transportation and Air Traveler Characteristics Findings from the 2011 Washington-Baltimore Regional Air Passenger Survey Transportation Planning Board.
Tampa Bay Regional Transportation Summit October 10, 2013.
1 Auckland Airport Martin Fryer Sustainability Advisor.
Symposium on Road to sustainable land administration in Africa 7 th annual African conference and Exhibition on Geospatial information, technology and.
© S Haughton more than 3?
VOORBLAD.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
United Nations Economic Commission for Europe Transport Division United Nations Economic Commission for Europe Transport Division ITU - Inland Transport.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
1 Vince Galotti Chief/ATMICAO 27 March 2007 REGULATING THROUGH SAFETY PERFORMANCE TARGETS.
Hybrid journals at Nature Publishing Group COASP 19 th September, 2013 James Butcher PhD Associate Director Open Publishing.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Employment Ontario Program Updates EO Leadership Summit – May 13, 2013 Barb Simmons, MTCU.
Addition 1’s to 20.
25 seconds left…...
European Helicopter Safety Team (EHEST) July 2014 Prepared by Michel MASSON, EASA, EHEST Secretary.
1 Los Angeles World Airports | LAX Interim Runway Safety Improvement Project Update of Interim Safety Improvement Planning Presentation to Board of Airport.
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
1 Unit 1 Kinematics Chapter 1 Day
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
ISE Capstone Project by Michael Ferry University of Minnesota 2008.
Talofa!! from American Samoa. American Samoa.
Ballina Byron Gateway Airport Presentation November 2012.
AMG 1204 Airport Management By Zuliana Ismail, 2010.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
Page 2 Salt Lake City International Airport – April 12, 2016 FY 2017 Budget Goals & Objectives - Budget Drivers  Implement the Terminal Redevelopment.
Presentation transcript:

Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director Page 1 of 19

Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 2 of 19

Endorsed by African Regional High Commissions: Leadership and Consultation; Providing High Tier Management in Infrastructure Development. Setting the standards for Quality and Technology Development. High Quality Engineering Expert Implementation; Value Added construction solutions. Long lasting environmental and humanitarian benefits. Sharing your Vision in Partnership; We will develop solutions to achieve your objectives. Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 3 of 19

Our Accolades: Cormac Limited understands the infrastructure requirements of African countries Customer focused and we aim to exceed all expectations Adaptive approach to development phasing and requirements Provision of economies of scale to benefit project and programme implementation. Cormac Engineering Zambia Limited Presented by Steve Pearson Programme Director Page 4 of 19

Client: Metropolitan Washington Airports Authority President Ronald Reagan International Airport Contract Period: April 2011 – March 2012 Contract Value: £8.7 million =========================================================== Client: Sierra Leone Airport Authority Lungi International Airport Contract Period: April 2010 – April 2011 Contract Value: £8 million Portfolio Examples Cormac Engineering Zambia Limited Presented by Steve Pearson Programme Director Page 5 of 19

Client: Namibia Airports Company (NAC) Hosea Kutako International Airport Contract Period: September July 2013 Contract Value: US $ 3.5 million ====================================================== Client: Ilembe Consortium King Shaka International Airport Contract Period: Jun Apr 2010 Contract Value: $ 45million Portfolio Examples Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 6 of 19

Airports Team Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 7 of 19

Outline of Aerodromes Aerodromes NakondeCat 3International ChomaCat 4International KitweCat 4Domestic ChingolaCat 4Domestic MufuliraCat 4Domestic LuanshyaCat 4Domestic SamfyaCat 3Domestic ZambeziCat 4Domestic KabweCat 4Domestic KateteCat 4Domestic PetaukeCat 3Domestic KalaboCat 3Domestic Cormac Engineering Zambia Limited Presented by Steve Pearson Programme Director Page 8 of 19

List of Services and Deliverables Engineering & Design Phase Topological And Geotechnical Survey Boundary Security Construction Drawings Airfield Pavement Design Construction Drawings Service Pavement Design Construction Drawings Car Park Ticket Revenue Design Drawings Airfield Ground Lighting Design Drawings Capacity Assessments Airport Master Plan Development Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 9 of 19

List of Services and Deliverables Construct Construction of Runways, Taxiways, Aprons Lighting, Signage, Safety Airport Access Roads Car Parks Cormac Engineering Zambia Limited Construction Phase 1 - Overview Implementation of Boundary Security Implementation of Runway, Taxiway and RESA Pavements Implementation of Apron Pavements Implementation of Car Park Pavements & Ticket Systems Implementation of Access Road Pavements Implementation of Airfield Ground Lighting Implementation of Airfield Signage Presented by Steve Pearson Programme DirectorPage 10 of 19

List of Services and Deliverables Construct Construction of Runways, Taxiways, Aprons Lighting, Signage, Safety Airport Access Roads Car Parks Cormac Engineering Zambia Limited Construction Phase 1 - Airfield Pavements Asphalt Pavements at ~ 3ft depth: Runways: Total 22.4 Km Asphalt Taxiways: Total 1.8 Km Asphalt RESAs: Total 72,000 m2 Asphalt RESAs: Total 28,800 m2 Non-Asphalt Concrete Pavements at ~ 3.5 ft depth: Aprons: Total 230,958 m2 Concrete Presented by Steve Pearson Programme DirectorPage 11 of 19

List of Services and Deliverables Construct Construction of Runways, Taxiways, Aprons Lighting, Signage, Safety Airport Access Roads Car Parks Cormac Engineering Zambia Limited Construction Phase 1 - Service Facilities Asphalt Pavements: Car Parks: Total 133,650 m2 Access Roads: Total Km Car Parking Systems: 4 Parking systems each comprising: 2 Automated Entrance 2 Automated Exit 2 Automated Payment Machines Presented by Steve Pearson Programme DirectorPage 12 of 19

Terminal, Tower, Fuel Farm Areas – Phase 2 Terminal Design and Construction ATC Tower Design and Construction Mechanical Systems Fit out Electrical Distribution HVAC Lighting and Signage Baggage Handling Security Screening Immigration and Transit Areas Arrivals and Departure areas / lounges Fuel Farms and Fire Fighting Facilities Building Facilities Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 13 of 19

Communications Communications Systems – Phase 2 ATC VHF Communication Systems Ground Management Communications Crash Fire Rescue Communications Intercom and Public Address Systems Digital Voice Switch Systems Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 14 of 19

Surveillance Surveillance Systems – Phase 2 Time Reference Systems Meteorological Systems Record and Replay Systems Time Stamping Systems Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 15 of 19

Navigation Navigation Systems – Phase 3 VHF Omnidirectional Range System (VOR) Instrument Landing Systems (ILS) Approach Lighting Runway Centre Line Lighting Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 16 of 19

Commercial: Engineering Design and Construction Phase 1: Financed Programme dependant on arrangement Two Year Six Month Programme to completion Programme Price $143, 278, 742 US Dollars Programme Down Payment of 30% Runway Price (per Km) $2, or < 20m Kw Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 17 of 19

Conclusions: Dependable Airport Expertise Proven Airport Programmes Flexible approach to Clients needs Tailored solutions Cost-effective phased approach Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 18 of 19

Thank you for your valuable time! Any Questions? Cormac Engineering Zambia Limited Presented by Steve Pearson Programme DirectorPage 19 of 19