1 Project To Validate a Wind Turbine Turbulence Model Stephen Wheeler 7 th November 2013.

Slides:



Advertisements
Similar presentations
Farnborough Airspace Change Proposal FACC Briefing 4 October 2012.
Advertisements

Human Factors in Flight Operations A CAA Perspective
Introduction to VET Quality Assurance in the UK Mark Novels 6 th December 2011 Quality Assurance in Technical and Vocational Education and Skills Study.
Quality Improvement in the ONS Cynthia Z F Clark Frank Nolan Office for National Statistics United Kingdom.
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
1 Safety Policy April Safety Policy National Level Regulator Service Provider Service Provider.
Module N° 3 – ICAO SARPs related to safety management
SAFETY MANAGEMENT WORKSHOP
Safety Oversight System in India 20 TH SCM of COSCAP-SA 05 April 2011.
© Integra A/S SAFETY MANAGEMENT WORKSHOP Karachi - January 2006 PRESENTERS: PETER THORSEN STEFAN REIB.
ICAO Safety Oversight Audit and Safety Oversight Status in Nepal
1 Welcome Summary - First visit Dhaka Integra A/S Independent consultancy company Headquarter located in Copenhagen, Denmark Working worldwide.
Presented to: COSCAP SA By: Aaron E. Wilkins III / Ajay Kumar Date: April 2011 FAAs Presence in South Asia An Overview of Technical Assistance Provided.
1 Welcome Safety Regulatory Function Handbook April 2006.
Session No. 4 Implementing the State’s Safety Programme Implementing Service Providers SMS
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
SIP/2012/ASBU/Nairobi-WP/19
ICAO AVIATION SAFETY PROGRAMMES
Global ATM Operational Concept
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
1 PERFORMANCE GOALS AND TARGETS AS PART OF ECONOMIC REGULATION OF ANSPs The UK experience of economic regulation Presented by Harry Bush CB Group Director.
Module N° 7 – Introduction to SMS
Federal Department of the Environment, Transport, Energy and Communications DETEC Federal Office of Civil Aviation FOCA Safety Division - Infrastructure.
The European Organisation for the Safety of Air Navigation DAL/DQR Workshop Introduction Brussels, February 2013 Presented by: Manfred Unterreiner.
CAA UK Preparation Activities for the ADQ IR
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
International Civil Aviation Organization TECHNICAL CO-OPERATION BUREAU PROCUREMENT SECTION Procurement of Civil Aviation Goods and Services.
© 2006 TDA Development Draft and subject to amendments from consultation Performance Management Challenge for Schools PM workshops 23 October 2006.
Presentation of the proposed Annex 19 – Safety Management
ICAO Harmonized Safety Management Requirements – The Safety Concern ICAO Harmonized Safety Management Requirements – The Safety Concern Captain Daniel.
Effectively applying ISO9001:2000 clauses 6 and 7.
Date: October 16, 2006 Federal Aviation Administration Aviation Research and Technology Park of New Jersey (ARTP) Presented to: American Society for Quality.
TAG Farnborough Airport. TAG Farnborough Airport Today.
Aviation Safety Management at global, European and Member State level (ICAO, EASP, EASp, SSP, SMS and ESSI) Juan Anton Continuing Airworthiness Manager.
METEOROLOGICAL SERVICES FOR LOW LEVEL FLIGHTS IN ROMANIA
AIM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Senior Manager – Research Finance & Programmes
Developing capacity and capability for HIA in the North East region Balsam Ahmad (1), Tanja Pless-Mulloli (2), Martin White (3) (1,2,3 School of Population.
1 Attributing the costs of health & social care Research & Development – Understanding AcoRD Trudi Simmons Senior Manager – Research Finance & Programmes.
Monitoring Team – Safer Streets.  Air Quality Introduction ◦ Brent ◦ Air quality Monitoring ◦ Previous Air Quality Action Plan  The revised.
1 Vision for better co-ordinated care: how could mental health payment systems serve as a key enabler for integration and personalised care? Mental Health.
1 Budgets and Budgetary Control Prepared and Presented By Gladstone K. Hlalakuhle.
PRIORITY AND FOCUS SCHOOLS: INCREASING CAPACITY FOR IMPROVEMENT USING THE INDISTAR ® ACTION-PLANNING TOOL June 11, 2014 OSPI’s Office of Student and School.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
International Federation of Accountants International Education Standards for Professional Accountants Mark Allison, Executive Director Institute of Chartered.
ICAO Provisions for Safety Management
What SMS means for an Operator’s relationship with the CAA
THE MINISTRY OF DEFENCE AND OFFSHORE WIND Julian Chafer FRICS Head of Estates Central Business Unit Defence Estates.
Airspace Infringements Iain McDermott-Paine, Southampton Airport AOA Representative – Airspace Infringement Working Group.
JOINT STRATEGIC NEEDS ASSESSMENT Rebecca Cohen Policy Specialist, Chief Executive’s.
1 CAA Offshore Helicopter Review Mark Swan Group Director, Safety and Airspace Regulation.
Title 36pt Georgia Subtitle 24pt Georgia Italics Presentation Information Arial Narrow 24pt Survey of Aviation Emissions Management Measures Ted Milczarek.
ICAO Requirements on Certification of Aerodromes Module - 2
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
Reduced/Low Visibility Operations – ATAC AGM, November, 2010.
Airport Management Chapter 1 Lecture 1. The airport-airway system: a historical perspective December 17, 1903 December 17, 1903 Development of civil airports.
1 FAA Update The Civil Aviation Authority  The CAA is the UK's specialist aviation regulator. Its regulatory activities range from making sure.
Airspace Update Gatwick Airport Airspace Seminar 2016 Charles Kirwan-Taylor Director of Corporate Affairs and Sustainability 1 Tuesday, 10 May 2016.
PlaneWrong AGM Thursday 13th October
NAM/CAR/SAM Quality Assurance Workshop Gustavo De León
CAA’s CA98 investigation and sector review in airport “surface access” British Parking Association – Parking Forum Pedro Lino Pinto 2 March 2017.
Establishment of Space Weather Information Service
SCSC April 2018 A model for including cyber threat in safety cases
Aviation Innovation for Regional Integration
ISA Working Group Maximising the value of your ISA A systematic process for change safety case assessment Andrew Eaton & Stephen Barker 24th November.
Communication and Consultation with Interested Parties by the RB
National Airspace and Noise Policy
Overview IAEA-ENSREG Workshop
Presentation transcript:

1 Project To Validate a Wind Turbine Turbulence Model Stephen Wheeler 7 th November 2013

2 Introduction The Civil Aviation Authority The CAAs Environmental Programme Presenter Project Background Outline Of The Project To Validate a Wind Turbine Turbulence Model Output Timelines Next Steps Final Message Any Questions?

3 The Civil Aviation Authority The CAA is the UK's specialist aviation regulator. Its regulatory activities range from making sure that the aviation industry meets the highest technical and operational safety standards to preventing holidaymakers from being stranded abroad or losing money because of tour operator insolvency.

4 CAA Environmental Programme Is a high level document that outlines the CAAs environmental objectives until It can be found at: Environment_final.pdf Each area of the CAA has specific environmental objectives within the programme CAA Environmental Programme areas responsible for this project are: Safety and Airspace Regulation Group - Safety and Standards element of the programme Aerodrome and Air Traffic Standards Division Air Traffic Management Section

5 Presenter Stephen Wheeler Safety and Standards Hotspot Champion Civil Aviation Authority Safety and Airspace Regulation Group Aerodrome and Air Traffic Standards Air Traffic Management Standards Tel:

6 Project Background Why Undertake this Project? Observed rise in the number of aerodromes voicing concerns regarding their perception of the possible effects of wind turbine turbulence on their operations Greater proliferation of wind turbines in more densely populated areas and those areas used by aviation Completion of a Safety Review by the CAA into the establishment of two wind turbines at East Midlands Airport

7 What are we endeavouring to achieve? To obtain a greater knowledge and provide high quality impartial evidence regarding wind turbine turbulence. The CAA commissioned a project undertaken by Liverpool University - Integrated Simulation of Light Aircraft Encounter With Helicopter and Wind Turbine Wakes An initial element of this wider project resulted in the creation of a model outlining the nature of the turbulence associated with wind turbines Whilst the creation of this model was a step in the right direction, the data would not be able to be released into the public domain and hence used as a resource for wind turbine and aviation industries alike, until validated To ensure the model could be validated as soon as possible and to ensure that the data released was of the highest quality possible it became evident that the use of a LIDAR would be the most efficient and effective method of achieving these objectives Therefore a separate project outside of the original project was needed to validate of the Liverpool University model.

8 Outline Of The Project To Validate a Wind Turbine Turbulence Model The project consisted and consists of the following stages: Selection of a suitable LiDAR System Galion Lidar - Provided by SgurrEnergy, Glasgow. Request for funding Fund Management Board - AIFCL– One-off payment. Selection of a suitable location East Midlands Airport – Manchester Airlines Group Selection of a suitable time of year Undertaken after consultation with the Meteorological Office to attain, via historical data, the best time of year to ensure the wind speeds needed to validate the model.

9 Installation of the LiDAR at the project site The Galion Lidar is relatively small and mobile (only 83kg) therefore the installation and site calibration time is short i.e. A day or two Turbulence monitoring period LiDAR left in situ for the monitoring process to begin Assessment of data output Liverpool University will complete this aspect of the project Peer review of model This will possibly be undertaken by the Dutch Research Institute – NLR tbc Publication Once the final validated and peer reviewed model is produced the CAA will ensure that its content will be released into the public domain in a format that is usable for both the wind turbine and aviation industries alike

10 Output What will the project deliver? An independently commissioned, high quality, fully validated, peer reviewed model, outlining the length and nature of the turbulence associated with wind turbines for a wide variety of wind speeds Where will this be published? Aeronautical Information Publication CAP 764 New guidance for those wishing to undertake renewable developments on or near aerodromes An entry in the Airspace Safety Initiative Local Planning Authority presentation

11 Benefits Alleviation of the problem of spurious objections to wind farm developments based on the turbulent effects of wind turbines on aerodrome operations Reduction in the time required by wind turbine developers to assess the nature and effects of any wind farm development on neighbouring aerodromes and those who operate from them Reduction in project delay times associated with turbulence related concerns raised by aerodromes and those who operate from them Reduction in the costs associated with delays caused to wind turbine developments by aviation concerns relating to turbulence

12 Timelines 2013 May - Project Initiation - Galion Lidar selected Jun - Funding Agreed With Fund Management Board Aug - East Midlands Site Finalised Nov - LIDAR Insitu East Midlands Dec - Liverpool University Obtain Results 2014 Mar - Liverpool University Finalise Model Apr - Results Peer Reviewed May - Results Published

13 Next Steps Flights through wind turbine turbulence to find out likely effects? Helicopter Simulated Possibly real Fixed Wing

14 Leadership and Part Funding - Aviation Industry - Stephen Wheeler - CAA Project Lead Project Funding - Wind Industry - Simon Heyes Chairman Fund Management Board Turbulence Data Assessment and Modelling - Liverpool University - George Barakos – Academic Director School Of Engineering Project Location - Aviation Industry - East Midlands Airport - Simon Whitby - Flight Operations Director/ Mark Chambers - Engineering Manager Project Equipment - Wind Industry - Galion Lidar- SgurrEnergy - Gordon Mina – Technical Engineer Final Message

15 If A Common Problem Presents Itself Collaboration Is The Key To Solving It To The Benefit of All

16 Any Questions?