Fire Prevention Coffee Break Training

Slides:



Advertisements
Similar presentations
INTRUSION ALARM TECHNOLOGY
Advertisements

Denver Fire Alarm Test FUNDAMENTAL, POWER SUPPLIES, CIRCUITS, INSPECTIONS, TESTING and MAINTENANCE.
Initiating Devices Manual Fire Alarm Boxes Ionization Smoke Detectors
Denver Fire Alarm Test Preparation Speed Drill © Ted Smitty Smith 2013.
NFPA 72 - National Fire Alarm Code Chapter 4 - Notification Appliances
NFPA 72 and NFPA 101 Supervised Automatic Sprinkler System Overview
State Fire Marshal Question and Answer Session with the Louisiana Automatic Fire Alarm Association March 19, 1999.
LOUISIANA DEPARTMENT OF PUBLIC SAFETY AND CORRECTIONS
2015 Update to OBC September 17, 2014.
NFPA National Fire Alarm & Signaling Code
Ted “Smitty” Smith  I have included in the following slides some key sections from each of the codes you will primarily encounter on the test. I recommend.
UL Code th Edition An Overview of the Foremost Code Updates.
Elevators & Fire Alarm Systems: Understanding Interface Requirements Presented by: Antonio Torres- North Central Regional Sales Manager.
Basic Fire Alarm Systems Overview
Fire Alarm System Notification Appliances
NFPA Prelim-ROC Level.
Nurse Call Systems & Emergency Call Systems Overview of ANSI/UL 1069 and ANSI/UL 2560 NOTES ABOUT THIS PRESENTATION: Review Oxygen-Enriched Environments.
Fire Detection and Signaling Systems
Inspection and Testing of Fire Alarm Systems (ITFAS)
2012 International Fire Code Adopted as the minimum fire safety standard by the State of Wyoming City of Sheridan must adopt the minimum standard to retain.
FIRE ALARM SYSTEMS AND FUNDAMENTALS
WELCOME DBI & SFFD Meet the Pros October 11, 2007.
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
Chapter 14: Inspection and Maintenance
EC4019PA Intrusion & Access Control Technology (IACT) Chapter 4- CAMS Prepared by Sandy Tay.
© 2012 Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code and the.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
© 2008 Delmar, Cengage Learning Property Security, Emergency Response, and Fire Protection Systems Chapter 13.
International Fire Door Inspector Association Presents New Annual Fire Door Inspections NFPA 80 – 2007, 2010, 2013 Standard for Fire Doors and Other Opening.
The Association of Electrical and Medical Imaging Equipment Manufacturers Nurse Call Systems & Emergency Call Systems Overview of ANSI/UL 1069 and ANSI/UL.
Chapter 5 ID 234 Building Codes Fire Resistant Materials and Assemblies.
code calculations, construction drawings
Area of Refuge It’s the Law!
Maine State Fire Marshals Office1 Laws and Codes Relating to Existing Apartment occupancies in the State of Maine Mark Stevens CFI-II, CFPS, CFPE Inspections.
Mass Notification NFPA and Beyond! Ray Grill, P.E. ARUP
Fire Alarm Verification CAN/ULC-S561-03
Class A, B, and now N NFPA 72, 2016 Edition Dan Horon President
Louisiana AFAA Quarterly Meeting State Fire Marshal Questions
Fire Alarm System Design & Inspection
Chapter 8. Electrical Systems
NFPA National Fire Alarm & Signaling Code
Carbon Monoxide Detection: Code and Legislation Updates
Fire Protection Systems Chapter 9 IBC 9th Edition Amendments
Hazardous materials: What to look for
Louisiana Automatic Fire Alarm Association – Quarterly Meeting 1/15/10
FIRE ALARM TRANSMISSION METHODS “NFPA ”
Position Statement on Sealed Truss Placement Diagrams for the State of Texas Overview Revised 3/23/2017.
Proposed Changes to the 2009 International Building & Fire Codes
NICET Fire Alarm Tech Level 1 Practice Test
NICET Fire Alarm Tech Level 1 Practice Test # 9
Fire Alarm Systems for Emergency Operations of Elevators
NICET Fire Alarm Tech Level 1 Practice Test # 6
ARCHITECTURAL SAFETY FEATURES –Exit Separations –Continuation of Exit Stairs from lower to upper floors –Discharge from Exits FIRE PROTECTION FEATURES.
Special Provision 188 of IMDG Code 38-16
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
NICET Fire Alarm Tech Level 1 Practice Test # 13
NICET Fire Alarm Tech Level 1 Practice Test # 3
Chapter 19 Electrical Plans.
NICET Fire Alarm Tech Level 1 Practice Test # 10
General Requirements of NFPA 101
Presented by: Tim Knisely
Fire Alarm System Design & Inspection Presented on behalf of the Burglar and Fire Alarm Association of Michigan by Daniel G. Decker, CFPS, CPP, SET.
Fire Alarm Tech Practice Test # 16 NICET
Area of Refuge It’s the Law!
Fire Prevention Coffee Break Training
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
FIRE ALARM DRILL 26 © Ted Smith 2017.
Denver Fire Depart. License Fire Alarm Practice Test # 12
Presentation transcript:

Fire Prevention Coffee Break Training May 2017

Agenda Introduction Submittals - Phelan Changes to NFPA 72 - Phelan Questions and Answers – Open Forum

Please welcome our Summer Intern Charlie Poppe

Small Change/Reminder about Submittals Reminders DMFD does not accept electronic submittals of drawings/original submittals. If there are substantive changes to the drawings required by a resubmittal hardcopies are required to complete/approve the permit. We will accept the following electronically Material datasheets Resubmitted calculations Response letter Small Change to the process The email address for responses will now be firedept@dmgov.org

NFPA 72 2013 Significant Changes The City of Des Moines has adopted the 2015 IFC and IBC. As of March 1st the 2015 I-codes are effective. These codes reference the 2013 versions of NFPA 13 and 72.

At a minimum, the following information is required as part of the documentation for new systems and additions or alterations to existing systems. Written narrative describing the system and its purpose Riser diagram Floor plans showing device and control equipment locations Sequence of operation Data sheets for equipment to be provided Manufacturers’ published instructions and maintenance criteria Battery calculations (if applicable) and emergency power information

At a minimum, the following information is required as part of the documentation for new systems and additions or alterations to existing systems. Cont. Written narrative describing the system and its purpose Riser diagram Floor plans showing device and control equipment locations Sequence of operation Data sheets for equipment to be provided Manufacturers’ published instructions and maintenance criteria Battery calculations (if applicable) and emergency power information

Shop Drawings Shop drawings are required to include specific information, which is spelled out in chapter 7. Here’s a summary: Installer or contractor name Name of the owner and property information Protected premises location Device legend and symbols Issue and revision dates

The floor plans are to include the following information: Floor or level identification Compass reference Graphic scale Specific information regarding riser locations, space designations, devices, circuits, excessive ceiling heights, and ceiling geometry

The floor plans are to include the following information: Riser diagrams noting the system arrangement in building cross section, type and number of circuits, type and number of components on each floor, and number of conductors

The floor plans are to include the following information: Control unit diagrams noting the location of the equipment, fire alarm primary power disconnecting means, field wiring terminals and terminal identification, as well as circuits connected to field wiring terminals and circuit identification Typical wiring diagrams for all devices Narrative description or an input/output matrix and sequence of operation System calculations (battery, voltage drop, and other required calculations).

Record Drawings Record drawings consisting of current updated shop drawings reflecting the actual installation of all system equipment, components, and wiring also must be prepared. In NFPA 72-2010, there was a single system record of completion for the fire alarm system and supplementary forms for other systems. These supplementary forms also address documenting the power systems, notification appliance power panels, interfaced equipment, and mass notification systems.

Record Drawings In NFPA 72-2010, there was a single system record of completion for the fire alarm system and supplementary forms for other systems. These supplementary forms also address documenting the power systems, notification appliance power panels, interfaced equipment, and mass notification systems.

Fundamentals Reorganized for the 2013 edition to provide a more user-friendly flow of requirements.   Extensive usability changes have also been made in the support chapter, "Inspection, Testing and Maintenance.”  These changes occur primarily within the inspection and testing tables.   The visual inspection table has been updated, adding new inspection methods for each component along with the inspection frequency.   The test methods and test frequency tables have been combined into a single table so that the test method appears along with the test frequency for each component.   The component listings in both tables have been reorganized and coordinated so that components and equipment are easier to find.

Fundamentals cont. Require supervising station operators and fire alarm system service providers, respectively, to report to the authority having jurisdiction when monitoring service has been terminated or when a system has been out of service for more than eight hours. Also within this chapter, requirements for inspection, testing, and service personnel qualifications have been updated to better reflect the level of qualification needed for each type of activity.   This includes a new provision requiring system programmers to be certified by the system manufacturer.

Circuits and Pathways Updated to incorporate specific circuit performance and integrity information, Revised and relocated from the chapter on protected premises fire alarm systems. Also, a new section has been added to address prioritization and segregation of life safety and non-life safety data in shared pathways.

Inspection, Testing and Maintenance Modifications have been made throughout the support chapter to clarify that the requirements apply only to the systems, devices, and components covered by the code – not to components of other systems. In addition, inspection methods have been added to the inspection table along with the inspection frequencies.  Also, new provisions have been added to require that a test plan be written to establish the scope of testing for fire alarm systems.

The support chapter "Initiating Devices” Updated to clarify requirements for accessibility and labeling of remote alarm and supervisory indicators.  In addition, the provisions in this chapter that address total coverage detection have been revised and coordinated to clarify the approach to be taken when return air plenums are involved.  Also, the provisions addressing spot-type smoke detector spacing in high- airflow conditions have been revised to clarify that adjustments for high airflow must be made prior to any adjustments for ceiling construction.

Notification Appliances Coverage for occupant notification (generally specified by other governing laws, codes or standards) only applies in occupiable spaces, as defined in NFPA 72.  In addition, the provisions in this chapter for audible signaling have been updated to require documentation of the locations that require (and do not require) audible notification as well as documentation of the audibility levels that must be produced. Similar area-of-coverage documentation requirements were also added for visible notification.  

Notification Appliances Also, provisions for the use of the standard alarm evacuation signal (the three-pulse temporal code) have been updated to extend to signals used for relocation and partial evacuation, not just complete evacuation.  Finally, provisions addressing textual and graphical visible appliances have relocated from the chapter on emergency communications systems to this chapter and have been expanded to include fire applications and refined to include location, mounting and performance requirements.

Emergency Control Function Interfaces” Specifically address requirements for elevator recall when sprinklers are installed in elevator pits. The requirements for occupant evacuation elevators have also been completely revised to coordinate with changes being made in ASME A.17.1/B44, Safety Code for Elevators and Escalators. In addition, requirements for fire alarm systems interfacing with HVAC systems have been updated, as have the requirements for door and shutter release and requirements for electrically locked doors.

Protected Premises Fire Alarm Systems Updates to address the monitoring of carbon monoxide detection systems by fire alarm systems.   Carbon monoxide detector activations are required to be displayed on the fire alarm system as "carbon monoxide alarm” signals. Also, provisions have been added requiring that if a valve is installed in the connection between a sprinkler system or a suppression system and an initiating device, the valve must be supervised.

Chapter 10: Fundamentals Reorganized Much of the material in chapter 10 has been reorganized. The requirement for protection of control equipment has been inserted in section 10.4.4, which requires smoke detection to be provided at the location of each fire alarm control unit, notification appliance circuit power extender, and supervising station transmitter unless the equipment is in a constantly occupied area. The requirements for qualifications of inspection and testing personnel have been moved from chapter 14 into chapter 10 as well. The qualification requirements for all personnel have been expanded to also be applicable to personnel working with emergency communication systems.

A reference has been added in section 10.6.7.2.1(8) regarding capacity of power supplies for two-way radio communications enhancement systems. This section refers you to section 24.5.2.5.5, which has new requirements for the power supplies for two-way radio communications enhancement systems. These requirements include two sources of power and require either 12 hours of capacity in storage batteries or 12 hours of capacity provided by an automatic starting engine driven generator plus 2 hours of battery capacity. New paragraphs 10.7.5 and 10.7.6 allow carbon monoxide signals and pre- alarm signals to take precedence over supervisory and trouble signals.

New sections 10.8 and 10.9 Clarify the perceived confusion regarding different types of signals and the system response to those signals. Section 10.8 Detection and Signaling of Conditions and 10.9 Responses address alarm, pre-alarm, supervisory, and trouble signals and responses to those signals.

A new paragraph 10.10.3 Requires audible alarm notification appliances for a carbon monoxide alarm system to produce signals that are distinctive from other signals from devices that may be serving the same area but are not part of the carbon monoxide, fire alarm, or emergency communication system.

A number of changes have been made in the system chapter "Emergency Communications Systems” including the following: The addition of specific references to documentation requirements in the new documentation chapter; The addition of a requirements to post instructions for the use of microphones in making voice announcements and for test messages to specifically state "this is a test;” The addition of ANSI/UL 2572,2 Standard for Mass Notification Systems, in the requirement for the listing of mass notification systems control units; The addition of a requirement to provide message templates for each message developed for scenarios of the emergency response plan;

A number of changes have been made in the system chapter "Emergency Communications Systems” including the following: Clarification of requirements for the use of live voice instructions in emergency voice/alarm communication systems upon release of the microphone; Updated in-building mass notification system documentation requirements to provide the owner with a written sequence of operations and a copy of the site- specific software; Updated requirements for voice message priority in in-building mass notification systems; Added provisions on the use of textual and graphical visible notification appliances for primary or supplemental notification; and, Updated requirements for the location and accessibility of emergency command centers.

"Supervising Station Alarm Systems” Addressing alarm signal verification, alarm signal content, and restoration of signals. These changes have been made in part to help emergency responders better manage issues related to unwanted alarms. In addition, new definitions for "unwanted alarms" have been added to more precisely identify the sources of these alarms.

"Supervising Station Alarm Systems” Cont. Changes have also been made to update the communications methods addressed in this chapter, including the following: Updated requirements for supervision intervals for both single and multiple communications paths; Changes to the types of transmission means that can be used for the second channel of a digital alarm communicator transmitter (DACT);

"Supervising Station Alarm Systems” Added provisions for signal processing equipment at supervising stations; Updated requirements for secondary power for shared communications equipment used with performance-based technologies; Added annex material to provide examples of technologies that fall under the requirements for performance-based technologies; and, Removed requirements addressing digital alarm radio systems

Public Emergency Alarm Reporting Systems Updated to prohibit the use of unlicensed radio frequencies in wireless networks.  In addition, revisions have been made to clarify the wireless network capacity for the number of alarm boxes on a single radio frequency. A new requirement has also been added to require circuit survivability for wiring between an auxiliary alarm system and the auxiliary or master box.

Single- and Multiple-Station Alarms and Household Fire Alarm Systems Modified the performance requirements for the low frequency alarm signal; Updated the provisions for visible and tactile notification so they apply to those with moderately severe as well as profound hearing loss; Changed the secondary power capacity requirements for smoke and heat alarms to 7 days instead of 24 hours; Introduced two new separate provisions addressing smoke alarm and smoke detector resistance to common nuisance sources in general, and to common cooking nuisance sources when installed within 20 ft (6 m) of a fixed cooking appliance;

Single- and Multiple-Station Alarms and Household Fire Alarm Systems Added provisions to address the connection of sprinkler waterflow switches to multiple-station alarms; Added provisions to require two simultaneous or sequential operations to activate a keypad fire alarm signal; and, The provisions for testing of smoke alarms (in the testing chapter) have been revised to eliminate the requirement for sensitivity testing

Questions and Discussion What did we miss? What else have you all noticed? What do we need to talk (more) about?