A Pneumatic Device to make modules assembly easier (faster ?)

Slides:



Advertisements
Similar presentations
Automated Testing Ted Driggs (tdriggs). What Verify program behavior without human interaction Programmatically load and run test code on a wide array.
Advertisements

Instructions for using this template. Remember this is Jeopardy, so where I have written “Answer” this is the prompt the students will see, and where.
Service Training PV Series 42 PVplus
ME 330 Manufacturing Processes MECHANICAL ASSEMBLY: Joining Methods using Fasteners.
Ion source maintenance on the MAT 253
MICE- AFC Unit Mechanical Design of the Cold Mass Support System Oxford University Rohan Senanayake.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
The Fastest Growing Mobile Marketing Platform on the Planet!
The Super Scooper: Self Scooping Wheelbarrow
1 Module and stave interconnect Rev. sept. 29/08.
Simple Harmonic Motion AP Physics 1. Simple Harmonic Motion Back and forth motion that is caused by a force that is directly proportional to the displacement.
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
Submitted by Ravi Prakash PGT(Computer Sc.) KV39 GTC Varanasi
Work Work happens when a force moves an object over a distance.
Chapter 1 Computer System Overview Patricia Roy Manatee Community College, Venice, FL ©2008, Prentice Hall Operating Systems: Internals and Design Principles,
Grant Scheiner Updating the TCDLA iOS App Scheiner Law Group, P.C. Houston, TX – Office – Cell & Text
Mechanical Testing of Flag Joint Assembly. TF Flag Assembly to be Tested.
Conservation of Energy. Machines.. Conservation of Energy Energy: the ability to do work. The Law of Conservation of Energy: Energy cannot be created.
COMPUTER ORGANIZATIONS CSNB123 NSMS2013 Ver.1Systems and Networking1.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
Machine Design I (MCE-C 203)
New Product Developments World Leaders in Combustion Management Solutions Mk7 Expansion PCB Mk7 Expansion PCB.
The Centrifugal Governor, YEAH!!! By: Peter Washer.
4V-500 ½”-2”. Modification Overview  Production of the 4V-500 PVB began in  The 4V utilizes a float assembly that contains a relief valve that.
UNLOCKING SUCCESS BY DHRUV S. Invent-It Challenge.
DCal Insertion Tooling 24/02/ DCal Insertion Tooling DCal Insertion System feature following main components 1. One rotator : cylindric welded structure.
Getting Started with your Diagnostic Station Your ADC ADVIEW Diagnostic Station Unpacking the contents, you will find… Quick start guide (a printed version.
Work and Machines How machines make our lives easier.
EMCal Meeting Nantes – July J-F Muraz  Grenoble Status  Assembly and test Hall.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
Power Screws. Ball Screws Problem A stepper motor rotating at 120 rpm is directly coupled to a power screw with a pitch of 1 mm. 1.How fast can the.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
Date of download: 5/27/2016 Copyright © ASME. All rights reserved. From: Characterization of a Novel, Magnetic Resonance Imaging-Compatible Rodent Model.
Hub and Wheel Bearings Wheel bearings allow the wheel to turn freely. The bearings may be either tapered roller bearings or ball bearings. If the spindle.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The reading is 7.38 mm. The reading is 7.72 mm.
Project Overview  Introduction  Clawbot Build  Design Modification  Design Development  Programming  Sensors  Advanced Sensors  Open design challenges.
The Low Inclination kit has been developed to overcome some of the limitations of the Heat Pipe collector and increase its installation flexibility,
Ambition was to reduce setup time to a very low level
”-10”.
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
½”-10”.
Project Overview Introduction Clawbot Build Design Modification
ADMINISTERING OXYGEN.
From: Effect of High Strain Rate on Indentation in Pure Aluminum
Development of a low material endplate for LP1 and ILD
Date of download: 10/24/2017 Copyright © ASME. All rights reserved.
826YD 21/2”-10”.
RP4A (LF) ½”-2”.
Experiment to determine Young’s Modulus of a steel wire
720A ½”-2”.
Properties of a machine
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
Multiplication Grids Multiplying a 2 digit number by a 1 digit number.
Module 5: Facilitating Compliance with Prefabrication
Preliminary Test.
Multiplication Grids Multiplying a 2 digit number by a 1 digit number.
McMaster linear bearing #6709K180 with guide rail suppressed
DC4A (LF) ½”-2”.
Jillian Pardini & Hank Finch
Wire Stripping and Crimping
909 3/4”-2”.
Introduction to Ergonomics
719 ½”-2”.
Gattini Detector Installation
Irrigation - Garden - Plumbing
Target Position Guide Plate Target Ladder Rod Adjustment Screws
919 ¾”-2”.
Ultra-efficient installation solutions
Presentation transcript:

A Pneumatic Device to make modules assembly easier (faster ?)

The EMCal Modules assembly tooling today

Some features of modules assembly tooling During initial set up, one have to tight the 5 screws by doing tours of the 5 screws with roughly ¼ turn at each tour : this is a time consuming process, 40 times ¼ turn assuming 1 mm pitch for screws and 2 mm average displacement. Loading the stack by screw is not a «following» loading : as the stack creeps, the compression load decreases until equilibrium, and need to be restored many times if an efficient compression process is wished: a « following » load shoud allow better compression for a given time, or faster compression for a given creeping. 3. During final setup, transfering compression load from screws to Belleville washers is a critical operation as any change on one of the 5 setting points impacts on the 4 others points : once again some «tours» are required in order to perform equal load for each row of Belleville Washers.

Setting up of Compression Load

Replacing 5 screws by a single device

Compression load provided by pneumatic device During compression time, compression load follows the stack as it creeps

System configuration during setup of Belleville Washers

Pneumatic device mounted on module assembly tooling