Proposed text for Section 6.5 of 5 Criteria

Slides:



Advertisements
Similar presentations
Doc.: IEEE /661r1 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Advertisements

Doc.: IEEE /661r0 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Doc.: IEEE /0085r2 Submission July 2011 Gerald Chouinard, CRCSlide Response to Comments received on the proposed a PAR and 5C Date:
Submission doc.: IEEE Comment #1 from WG Comment: In Section 5.2.b two examples of spectrum resource measurements are given: PER and.
Doc.: IEEE /222r4 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
CSD for P802.1AS-REV WG Wednesday, 05 November 2014.
Doc.: IEEE /222r3 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Doc.: IEEE /209r2 Submission March 2004 Lanzl, Aware; Ketchum, QualcommSlide 1 Carrier Frequency / Symbol Clock Offset Proposal for TGn FRCC Colin.
PAR and CSD for P802.1Qxx WG January PAR (1) 1.1 Project Number: P802.1Qxx 1.2 Type of Document: Standard 1.3 Life Cycle: Full Use 2.1 Title:
Standardization of Mobile Wireless Small Cell Backhaul (SCB) Document Number: IEEE r Date Submitted: Source: Junhyeong.
Doc.: IEEE /0498r0 Submission April 2008 Eldad Perahia, Intel CorporationSlide 1 Modifications to the 60GHz PAR & 5 C’s Proposal Date:
Page 1 IEEE Ethernet Working Group - CSD Version 2.3 Items required by the IEEE 802 CSD are shown in Black text, supplementary items required by.
CSD for P802.1Qcj WG January Project process requirements Managed objects – Describe the plan for developing a definition of managed objects.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
1 IEEE interim, Orlando, Florida, March, 2008new-nfinn-fast-chains-rings-par5c-0308-v1 Fast Recovery for Chains and Rings Proposal for PAR and 5.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
IEEE Std Proposed Revision Purpose, Scope & 5 Criteria.
Contents of this presentation ● PAR material (Title, Scope, Purpose) ● Material as developed at previous meetings ● Provision for new/revised material.
Contents of this presentation ● PAR material (Title, Scope, Purpose) ● Material as developed at previous meetings ● Provision for new/revised material.
TGn Chair’s Status Update
Below 6GHz 11vht PAR&5C's proposal
IEEE P criteria responses
Proposed wording revisions to HT PAR Wednesday, March 12, 2003.
The Article VII of the Lisbon Recognition Convention and Recommendations for Implementation in the European Region UNiSTUD Como, May 2017 Gunnar.
July 2010 doc.: IEEE /0903r0 A resolution proposal comments related to for next generation security in built on changes in ac 14.
doc.: IEEE <doc#>
Review of March 2013 Proposed Pars
VHT SG PAR Feedback from Individuals
Proposed Evaluation Methodology Additions
CIS 599Competitive Success/tutorialrank.com
CIS 599C Education for Service-- tutorialrank.com.
Proposed Modifications to VHT60 PAR
HT SG PAR Proposal Colin Lanzl Aware, Inc.
November 2008 doc.: IEEE November 2008
Remaining incoherence in Comparison Criteria
Raising the PAR Date: Authors: January 2014 January 2014
Addressing in WUR frames
doc.: IEEE <492> <month year> November 2015
<month year> Denver, March 2006
Addressing in WUR frames
Privacy Recommendation PAR Proposal
TGn FRCC Proposed IM7: Antenna Configuration
Proposed Modifications to VHT60 PAR
Proposal for HT PAR Title, Scope and Purpose
Proposed text for HTSG draft PAR and 5 Criteria
TGn Chair’s Status Update
Raising the PAR Date: Authors: January 2014 January 2014
Proposed text for HTSG draft PAR and 5 Criteria
doc.: IEEE <doc#1>
Below 6GHz 11vht PAR&5C's proposal
Carrier Frequency / Symbol Clock Offset Proposal for TGn FRCC
900 MHz ISM Band Date: Authors: January 2010 Month Year
<month year> Denver, March 2006
July doc.: IEEE /0997r0 July Response to Comments received on the proposed a PAR and 5C Date: Authors: Gerald.
Motion to a Start High Throughput Study Group
Fast Session Transfer Session Setup in TVWS
Proposed Modifications to VHT60 PAR
September 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG3c Technical Requirement sub-group.
Proposed Modifications to VHT60 PAR
Addressing in WUR frames
doc.: IEEE <doc#>
Channelization for China’s Spectrum
January 2000 doc.: IEEE /189r0 January 2000
IEEE Wireless Coexistence TAG
TGn FRCC Proposed New IM6
Interest for HDR extension to a
July 2004 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Merger Proposal #2 Affirmation of Commitment.
Presentation transcript:

Proposed text for Section 6.5 of 5 Criteria January 2003 Proposed text for Section 6.5 of 5 Criteria Colin Lanzl Aware, Inc. clanzl@aware.com Colin Lanzl, Aware Inc.

Section 6.4 Requirements 6.5 Economic Feasibility January 2003 Section 6.4 Requirements 6.5 Economic Feasibility For a project to be authorized, it shall be able to show economic feasibility (so far as can reasonably be estimated), for its intended applications. At a minimum, the proposed project shall show: a) Known cost factors, reliable data. b) Reasonable cost for performance. c) Consideration of installation costs. Colin Lanzl, Aware Inc.

5 Criteria Section 6.5: Economic Feasibility January 2002 doc.: IEEE 802.11-02/xxxr0a January 2003 5 Criteria Section 6.5: Economic Feasibility We have text, but doesn’t address all the bullet points needed We’re a little fuzzy on reasonable costs All the necessary words are there, they need to be re-organized and slightly emphasized Colin Lanzl, Aware Inc. Colin Lanzl, Aware Inc.

January 2002 doc.: IEEE 802.11-02/xxxr0a January 2003 Proposed Text, part a Support of the proposed standard will probably require a manufacturer to develop a modified radio, modem and firmware. This is similar in principle to the transition between 802.11b and 802.11g or between 802.11b and 802.11a. The cost factors for these transitions are well known and the data for this is well understood. Colin Lanzl, Aware Inc. Colin Lanzl, Aware Inc.

January 2003 Proposed Text, part b The new standard will provide manufacturers the option of supporting higher throughput. In general, the cost factor changes needed to implement the extensions envisioned by the study group are well within the capabilities of existing technology. Competition between manufacturers will ensure that costs remain reasonable. Colin Lanzl, Aware Inc.

January 2003 Proposed Text, part c The proposed amendment has no known impact on installation costs. Colin Lanzl, Aware Inc.