AirBase and DEM Wim Mol
West Balkan workshop 06-07 July 2011 Contents EoI Dataflow DEM QA/QC in the DEM QA/QC feedback West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 EoI Dataflow Airbase AQ meta info AQ EoI data Data collection EoI, AQ Directive 2008/50/EC EMEP Data exchange by DEM Data dissemination EEA Airbase viewer EEA Airbase dumps on EEA Data Service Reports Network manager: Data validation MS Data supplier: Quality checks using built-in options in DEM ETC/ACC: Quality checks during upload (“acceptance checks”); Feedback with MS Quality checks on Airbase data Quality assurance, control and checks CDR EEA: Quality checks on the XML-dumps and ASCII files West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 EoI Dataflow EoI Dataflow: Meta information (information on networks, stations, measurement configurations Measurement data Meta information other AQ dataflows (Questionnaire, NRT and SOR) has to be present in AirBase Meta information other AQ dataflo9ws can also be delivered with the DEM West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 1. Install 2a. Update Meta Info 2. Check Meta Info DEM REPORT 3. Import results 4. Check import 5. Submit West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 DEM Step 1: Install the DEM http://acm.eionet.europa.eu/databases/country_tools/aq/aq-dem/dem_install.html West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 DEM File Meta info Import Quality control Visualise Report Export Submit Help West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 DEM Step 2: Check meta information: Using screens Using report Using export (DEM metafile, Google Earth kml file) Update meta information: Using import (modifying the DEM metafile) West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 DEM Identification Type Time reference responsibles Networks Identification Location Classification Objectives meteo Stations Identification Method Sampling/analysis Calibration Body/programmes Meas. configurations West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 DEM Step 3: Import measurement results: Setting import parameters Create a Mark file Import of measurement data file (DEM AQ file) West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 DEM Step 4: Check imported results Using graphs of imported time series Using export files Overview imported data Raw data in Excel Calculated statistics Checks on measurement data Outliers Compare annual means with last year Missing data West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 DEM Step 5: Submit to EEA CDR http://cdr.eionet.europa.eu/ West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 QA/QC in the DEM Automatic controls Controls (errors & warnings) at input via screen Controls at import (errors and warnings on mandatory, essential and desired meta data; on the units etc.) Controls by the data supplier Outliers, statistics, missing data Visualisation Export files (meta data, overviews, raw data, statistics, kml) West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 QA/QC feedback The MS are responsible for the quality of the data The checks performed by ETC/ACM are extra service to improve the quality of AirBase The checks on the meta information and measurement data can also be performed by the data supplier West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 QA/QC in the DEM You are strongly requested to perform the checks available in the DEM West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 QA/QC feedback EoI2011 1 October: all DEMs are received 1 Oct-Jan next year: Uploading in AirBase; QA/QC feedback reports are sent; reactions from the MS Jan- 1 Feb 2012: reactions processed Feb 2011: calculations statistics and exceedances 1 March 2011: New data available in AirBase: AirView and XML dumps on EEA Data Service West Balkan workshop 06-07 July 2011
West Balkan workshop 06-07 July 2011 QA/QC feedback Feedback reports: Overviews imported/loaded data in DEM Missing mandatory/essential meta info Outliers Missing measurement data Re-submitted data Deletion stations/meas. conf. with data Deletion stations/meas. conf. without data West Balkan workshop 06-07 July 2011