CONWIP (A pull alternative to kanban principle)

Slides:



Advertisements
Similar presentations
Independent Demand Inventory Systems
Advertisements

A GENERIC CONCEPT OF A MANUFACTURING SYSTEM FOR VARIOUS PLANNING AND EXECUTION SYSTEMS Nico J. Vandaele University of Antwerp Department of Technology.
Inventory Management 2.
ArrivalsServiceWaiting line Exit Processing order System Queuing Systems: basic elements.
12 Inventory Management.
Chapter 9 Inventory Management.
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
CONWIP Systems CONWIP – Constant work-in-process
JIT, TPS, and Lean Operations
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Operations Management Just-in-Time Systems Supplement 12
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
Customer Service in Pull Production Systems Mark L. SPEARMAN Presented By: Ahu SOYLU.
Push and Pull Systems: Lecture 12
Little´s law Skorkovský ,KPH,ESF.MU
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
JUST IN TIME. Just in Time Getting the right quantity of goods at the right place at the right time.
Operations Scheduling. Scheduling in a Process-Focused Environment.
DOM 301 : Operations Management Practice
JIT and Lean Operations
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
Chapter 11: Strategic Leadership Chapter 8 Production and operations management.
CONWIP (A pull alternative to kanban principle)
Why Kanban Systems Fail and What You Can Do About it
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
CONWIP (A pull alternative to kanban principle) Main resources : Mark Spearman, David Woodruff and Wallace Hopp Northwestern University, Evanson, Illinois,
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
11DSCI4743 Inputs and Outputs to APP Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives Units or dollars subcontracted,
Chapter 20 Managing inventory and quality. The importance of inventory management §Cope with uncertainties in customer demand and in production processes.
1 What is JIT Inventory? The minimum amount of inventory necessary to keep a perfect system running smoothly Objective is to minimize the stock of parts.
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
1 Control of Production-Inventory Systems with Multiple Echelons.
Lean Production.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
Enterprise resource planning (ERP)
CONWIP (A pull alternative to kanban principle)
1 Office Space Requirements 2 Universal Axioms Manufacturing managers in large companies tend to overestimate their individual cell or departmental space.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
Basic production algorithms and its main concepts
Material Requirement Planning Kusdhianto Setiawan, SE, Siviløkonom Faculty of Economics – Gadjah Mada University.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Lean Supply Chains Chapter 12.
Chapter 4 Inventory Management. INVENTORY MANAGEMENT Stockpile of the product, a firm is offering for sale and the components that make up the product.
Manufacturing planning & control : Integration of MRP & JIT Prepared by: Ankit P. Sarvaiya (09CAD14)
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Chapter 3 Supply Chain Drivers and Obstacles
Facility Inventory Old Facilities Modern Facilities Classroom Size
Synchronous Manufacturing and Theory of Constraints
Inputs and Outputs to Aggregate Production Planning
An introduction to Factory Physics
Pull Production/ Just In Time
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
Kanban Production Just in time Systems
Chapter 3 Supply Chain Drivers and Obstacles
Just-In-Time and Lean Production
Kanban Replenishment for All Types of Industries
Using the queuing-theoretic approximations for the performance of “push” and “pull” production lines to address Design Problems.
Chapter 3 Supply Chain Drivers and Obstacles
Synchronous Manufacturing and Theory of Constraints
Inputs and Outputs to APP
Presentation transcript:

CONWIP (A pull alternative to kanban principle) Main resources : Mark Spearman, David Woodruff and Wallace Hopp Northwestern University, Evanson, Illinois, USA Diagrams, modifications, structures and editing (J.Skorkovský,KPH)

Methodologies used for effective production control Based on PULL principle JIT kanban zero inventory kanban (mostly used for repetitive manufacturing) Based on PUSH principle MRP (MRP-II) Based on both principles (push and pull) CONWIP (Constant Work In Progress) greatly reduced inventory levels and production lead times

PUSH and PULL PUSH : production jobs (production orders) are scheduled (MRP nad MRP-II) often not feasible plans are generated and problems are often detected too late used fixed lead times=LT (see next slide) do not depend on capacity utilization Having in mind , that production is random process, LT is very pessimistic PULL : production jobs (production orders) starts are triggered by completion of another job Black box t=start of the job t+LT=end time of the job (where LT=constant)

Flow time and Lead time (FT<>LT) Flow time (known also as a „cycle time“) time Typically random time (highly variable) Job is released Job is completed Lead time (constant used for planning ) JOB 1 Controlling parameters Job scheduling (MRP-MRP-II) WIP level Flow times JOB N FGI level FGI – finished good inventory ; WIP = Work in Progress

Components for Job N produced and Components for Job N needed… 1 (kanban = card) 2 2 Operation (Job1) Operation (Job2) Operation (JobN) Components for Job N produced and Supplied (pulled) UPSTREAM Authorization to start Job 2 DOWNSTREAM =kanban 1 Controlling parameter Production The number of kanban cards in the system determines the WIP levels in the plant

JIT Kanban is not JIT , where JIT=manufacturing philosophy JIT encompasses (includes): Kanban card system Total Quality Control (TQM) – e.g. scrap loss not tolerated…. Setup time reduction worker participation Advantages of JIT philosophy : reduced WIP (work in progress) shorter flow times (shorter production lower production costs greater customer responsiveness Lower inventory levels and lover stocking costs

PUSH and PULL are not mutually exclusive (vzájemně se nevylučují) approaches and other statements… Push and Pull can be combined ! MRP is considered to be more applicable than kanban MRP is in almost any discrete part production Kanban(JIT,pull) – superior results if applicable Kanban(JIT,pull) – is difficult to use if : Jobs with short production runs Significant setup times (long ones)- if Make-To-Order is applied Remarkable Scrap losses (bad quality) Unpredictable fluctuation in demand

PUSH and PULL and the types of the queuing networks Push : open queuing network Pull : closed queuing network (feed back) Push : schedule Throughput and measure WIP WIP T PULL : setup WIP level and measure Throughput

Advantage of PULL over PUSH PUSH : WIP and Throughput fluctuations – result in violation of the assumption, that Flow Times (FT) and therefore Lead Times (LT) are constant ! Push is more difficult to manage than Pull WIP is easier to optimize than Throughput (T) Little´s low : Average FT=Average WIP/Average T – meaning that FT cannot be constant but vary with WIP and T Pull is easy to manage : why ? -> WIP is easier to control than an estimation of the capacities needed to appropriately release work in Push system

CONstant Work In Progress = CONWIP System having benefits of a PULL and can be used in variety of manufacturing environment CONWIP : generalized form of Kanban CONWIP relies on signals (electronic, paper cards, semaphores,…)

CONstant Work In Process = CONWIP Kanban: card is used to signal production of a specific part CONWIP : card is assigned to production line and are not part number specific

CONWIP cards 4x 2x 2x 2x 3x 3x Bag log list Bag log list Bag log list BOM of the final product (7) cards 7 4x 6 5 2x Container C parts parts Container B 4 3 2 1 Queue (First- In First-Served=FSFS system) 2x 2x 3x 3x Container A Container A Container A Container A BOM=Bill of material System Entry Time=SET Bag log list 1 : 6 pc 2 : 6 pc 3 : 8 pc 4 : 8 pc 6 : 0 pc 5 : 0 pc 7 : 0 pc Bag log list 1 : 6 pc 2 : 6 pc 3 : 0 pc 4 : 0 pc 6 : 4 pc 5 : 0 pc 7 : 0 pc Bag log list 1 : 0 pc 2 : 0 pc 3 : 0 pc 4 : 0 pc 6 : 4 pc 5 : 2 pc 7 : 0 pc Bag log list 1 : 0 pc 2 : 0 pc 3 : 0 pc 4 : 0 pc 6 : 0 pc 5 : 0 pc 7 : 1 pc maintaining of BLL (Bag Log List) is responsibility of inventory control staff SET=8:00 SET=10:00 SET=12:00 SET=14:00

CONWIP parameters The card count (it determines the max WIP level for the line) =m Production quota (target production quantity/period) =q Maximum work ahead amount =n (if q+n is produced during a period, the line is stopped until the start of the next period)

CONWIP-air traffic control Destination airport (air above airport) Originating airport If heavy air traffic, departing planes should be held on the ground at the originating airport rather than control flying aircrafts in the air above destination airport as a holding pattern The results : greater safety and lower fuel consumption

CONWIP-Theory of Constraints Balance the flow and not the capacity !!!! Operation of the CONWIP line is regulated by the bottleneck resource If we have sufficient demand, the correct number of the cards will maintain just enough WIP to keep bottleneck busy

Thanks a lot for Your Attention Skorkovský