Guidelines for future developments Tiziana Paccagnella, ARPA-SIM

Slides:



Advertisements
Similar presentations
1 October 26, th COPS Workshop, Cambridge, UK COPS (Convective and Orographically-induced Precipitation Study) Goal: Advance the quality of forecasts.
Advertisements

COSMO-SREPS COSMO Priority Project C. Marsigli, A. Montani and T. Paccagnella ARPA-SIM, Bologna, Italy.
COSMO Workpackage No First Results on Verification of LMK Test Runs Basing on SYNOP Data Lenz, Claus-Jürgen; Damrath, Ulrich
Report of the Q2 Short Range QPF Discussion Group Jon Ahlquist Curtis Marshall John McGinley - lead Dan Petersen D. J. Seo Jean Vieux.
Ensemble activities in COSMO C. Marsigli, A. Montani, T. Paccagnella ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
CARPE DIEM 7 th (Final) meeting – Bologna Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda Item: 15 Chu ISHIDA(JAXA) on behalf of Rick Lawford, GEO Water CoP leader GEO Water.
ESA Project- Coupled Model Assimilation Year 1 workshop Aim: To establish coupled Atmosphere-Ocean assimilation system at ECMWF and demonstrate improved.
Short-Range NWP Programme 13th SRNWP Meeting 11 October 2006 Zurich (Switzerland)
13 ° COSMO General Meeting Rome VERSUS2 Priority Project Report and Plan Adriano Raspanti.
Science Plan and SPM report COSMO General Meeting, 9 September 2010.
NWP Activities at INM Bartolomé Orfila Estrada Area de Modelización - INM 28th EWGLAM & 13th SRNWP Meetings Zürich, October 2005.
“Initiate the reorganisation and strengthening of the SRNWP Programme” EMN/C27/Doc12 C27 took place the 4-6 April 2006 in Toulouse 13th SRNWP Meeting 12th.
COSMO Annual Meeting September 2005 Zurich (Switzerland) Short-Range Numerical Weather Prediction Programme.
10° COSMO GENERAL MEETING Plans and State of Art at USAM/CNMCA Massimo Ferri.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Report from the Scientific.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
COSMO-SREPS Priority Project C. Marsigli ARPA-SIM - HydroMeteorological Service of Emilia-Romagna, Bologna, Italy.
Météo-France / CNRM – T. Bergot 1) Introduction 2) The methodology of the inter-comparison 3) Phase 1 : cases study Inter-comparison of numerical models.
12/09/ :30 Tiziana Paccagnella COSMO Gen. Meeting 2005 Zurich 6TH COSMO GENERAL MEETING 20 – 23 September 2005 Zurich Suggested Projects for the.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss SPM report / Science Plan COSMO General Meeting, 10 September.
CARPE DIEM 6 th meeting – Helsinki Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches.
VERSUS2 – A new priority project for verification Pj Leader – Angela Celozzi.
Overview on the Work of WG 6 Reference Version and Implementation WG Coordinator: Ulrich Schättler.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 4 activities.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
WG 6 and Support Activities Plans for the next Year.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Status of MeteoSwiss 18 September 2008 COSMO GM 2008.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss WG 3: Overview status report COSMO General Meeting, 19.
COSMO – 09/2007 STC Report and Presentation by Cosmo Partners DWD, MCH, USAM / ARPA SIM, HNMS, IMGW, NMA, HMC.
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache, Bogdan Maco National Meteorological Administration of Romania.
10° General Meeting Adriano Raspanti - WG5 – VERSUS PL.
Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Science Plan, PPs, PTs, and more … COSMO General Meeting,
HYDROMETCENTRE of RUSSIA Gdaly Rivin STC COSMO September 2008, Krakow, Poland Hydrometeorological centre of Russian Federation.
WG 6 and Support Activities Overview Status Report Reference Version and Implementation WG Coordinator and Project Leader: Ulrich Schättler.
Overview of WG5 future activities Adriano Raspanti Zurich, September 2005.
Activities of the new WG7 Chiara Marsigli. WP Development of COSMO-LEPS Maintenance and updates of the operational suite at ECMWF (A. Montani) Study,
PP CONSENS Merging COSMO-LEPS and COSMO- SREPS for the short-range Chiara Marsigli, Tiziana Paccagnella, Andrea Montani ARPA-SIMC, Bologna, Italy.
Philippe Steiner, MeteoSwiss COSMO General Meeting September 22th, 2005 Plans of MeteoSwiss for next year.
Tiziana Paccagnella COSMO General Meeting Bucharest Report from the Scientific Project Manager 7th COSMO GENERAL MEETING.
Status of the NWP-System & based on COSMO managed by ARPA-SIM COSMO I77 kmBCs from IFSNudgingCINECA COSMO I22.8 kmBCs from COSMO I7 Interpolated from COSMO.
WG4 Oct 2006 – Sep 2007 plans COSMO General Meeting, 21 September 2006 Pierre Eckert.
WG 3: plans for next year COSMO General Meeting 23 September 2005 Marco Arpagaus.
CARPE DIEM 4 th meeting Critical Assessment of available Radar Precipitation Estimation techniques and Development of Innovative approaches for Environmental.
INSTYTUT METEOROLOGII I GOSPODARKI WODNEJ INSTITUTE OF METEOROLOGY AND WATER MANAGEMENT TITLE: IMGW in COSMO AUTHOR: Michał Ziemiański DATA:
Status of the COSMO web Cosmin Barbu, Rodica Dumitrache National Meteorological Administration of Romania.
COSMO General Meeting, 19 September 2007
Report from the Scientific Project Manager
Status of the COSMO-Software and Documentation
“Consolidation of the Surface-to-Atmosphere Transfer-scheme: ConSAT
Peter May and Beth Ebert CAWCR Bureau of Meteorology Australia
COSMO Status Report 2002 – 2003 Tiziana Paccagnella, ARPA-SMR
New COSMO Procedure COSMO General Meeting, Zürich September 2005.
Daniel Leuenberger1, Christian Keil2 and George Craig2
WG4: interpretation and applications A success story… to be continued… Pierre Eckert MeteoSwiss, Geneva.
Workshop Results WG5 COSMO General Meeting
Progress of the ESS.VIP ADMIN Special focus on the ESSnet on quality of multiple sources statistics. DIME/ITDG SG, Fabrice Gras, unit B1.
Report of the Scientific Project Manager 6th COSMO General Meeting
Preliminary test for the development of a 2.8km ensemble over Italy
COSMO Projects th COSMO GENERAL MEETING
COSMO Status Report 2003 – 2004 Tiziana Paccagnella, ARPA-SMR
Ulrich Schättler Source Code Administrator
Selected Priority Projects
Strategy for the coming years
PREVIEW in some words (PREVention, Information and Early Warning)
COSMO General Meeting Zurich 2005
Overview of WG3a activities Upper air physical aspects
Activities of WG7 Chiara Marsigli.
Support Activities and WG 6 Overview Status Report
Presentation transcript:

Guidelines for future developments Tiziana Paccagnella, ARPA-SIM

Work Packages/Groups Coordinators meeting Bologna, 9-10 September 2004 Preliminary planning of activities for the next year 2004 - 2005

Perspectives and specific tasks for next year have been drafted as a preparatory work for the planning phase of tomorrow.

Planning procedure STC WG coordinators SPM GOALS/PERPECTIVES Long term (some years) aims/objectives WG coordinators Input from WG participants SPM WG coordinators Input from WG participants SPM During the preparatory phase of the COSMO general meeting ROAD MAPS How to achieve these objectives SPECIFIC TASKS/NEXT YEAR ACTIVITIES Precise definition of work packagess

TOP priorities are identified as regards both ROAD MAPS Planning procedure TOP priorities are identified as regards both ROAD MAPS and SPECIFIC TASKS

ACTIVITIES, and precise definition of work-packages, are discussed and almost completely defined during the COSMO general meeting. Activities plan includes: Definition of TOP priorities Committments with time schedule

Planning procedure After the general meeting the final tuning of the yearly working plan is completed in about 1 month period. End of November the working plan is presented to the STC for the final approval. After approval of Top priorities STC members should do their best to assure committments will be fulfilled.

3 2 1 4 6 5 Enhance Use of Remote-sensing data in data assimilation Doing high resolution forecast at the meso-gamma scale 1 Improve of LM system At the current Resolution 4 Development of Ensemble Systems Based on LM 6 Improve exchange with other consortia 5 Improve internal exchange and communications

Road maps 2 1 Assimilation of radar data Doing high resolution forecast at the meso-gamma scale Assimilation of radar data Assimilation of satellite data GPS Tomography Tuning of the nudging scheme Nudging scheme for z-coordinates Use of surface level data LM-Z or not LM-Z Increase the accuracy with the required efficiency (operational requirements) 1 Improve of LM system At the current Resolution Complete the implementation of the Lake model Implementation of 3–D turbulence Development of radiation scheme Implementation of soil model Advanced microphysics scheme Improvement of PBL Shallow convection Meso-gamma radiation Improve the QPF at scales at which deep convection must be parametrized Post-processing Verification on the meso-gamma scale

Road maps 3 Assessment of COSMO-LEPS ……………… Development of Ensemble Systems Assessment of COSMO-LEPS ………………

Road maps 5 4 Improve exchange with other consortia Improve internal exchange and communications Some test cases for intercomparison with AROME Visiting scientist programme Guidelines Post-Processing SW High quality WEB site with updated documentation and information also for internal exchanges WG6 workshop with special about operational implementations

Road maps P1-P2-P4) probabilistic verification P1-P2-P4) Improve exchange and comparison of results (mainly on the WEB ) P1-P2-P4) Definition of “common LM problems P1-P2-P4-P5) Consolidation of common data-set P1-P2-P4) Common verification package at ECMWF P1-P2-P3-P4) Exchange of data with other consortia- P1-P2-P3-P4-P5) Visiting scientist programme

Suggestions concentrate on core activities => smaller number of WPs Avoid to put interest; try to define precise contributions (small but as realistic as possible) Keep the WG coordinator informed WG coordinators must spread information within their WG

Good work!

Consolidation, Documentation and Upgrade of the LM Goals and perspectives for the past COSMO period (10/2003-09/2004) are: Goals : Consolidation, Documentation and Upgrade of the LM Quality of precipitation forecast Assessment of the 'realism' of forecasts Multi-national assement assesment of COSMO-LEPS products Assimilation of remote sensing data Application and Interpretation Statistical interpretation of high resolution forecasts Paving the way for the Meso-gamma scale Z-coordinate model version New parameterization schemes forefront verification and case studies Perspective Issues are: Variational Methods for Estimating Local Parameters