CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.

Slides:



Advertisements
Similar presentations
IAEA International Atomic Energy Agency. IAEA Outline Learning objectives Introduction Functions of Regulatory Body (RB) on EPR Appraisal guidance: Part.
Advertisements

Making Sense of the WIC EBT IAPD IAPD Session of the 2014 WIC EBT User Group Meeting July 23, :00 AM to 12:00 PM Presented by Cheryl Owens, MAXIMUS.
Release & Deployment ITIL Version 3
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
BRC Food Safety Quality Management System Training Guide
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
Introduction to ISO New and modified requirements.
1 Framework Programme 7 Guide for Applicants
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
From Research Prototype to Production
Committee on Refinery Equipment November 2010 Update to the Refining Subcommittee Michael Lubcyik, Chevron Energy & Technology Company, Chair, CRE.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
Research & Technology Implementation TxDOT RTI OFFICE.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
QUALITY MANAGEMENT STATEMENT
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Progress on Remote Handling Systems TAC 12 Magnus Göhran – WPM 15 th October 2015.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
PASI OsC meeting 12th July 2012
Installation of the T600 at Fermilab CSN2, September 22,
CR AMS-02 D-0161 AMS Configuration Control Board Comments for AMS-02/D-016 Magnetic Spectrometer – 02 (AMS-02) Assembly and Testing Integration Plan.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
S. Barbanotti - DESY Requirements Conformance for SRF Cryomodules Workshop 16/10/2014 – ESS, Lund XFEL cryostat main components: Quality Assurance and.
Getting Ready for the NOCTI test April 30, Study checklist #1 Analyze Programming Problems and Flowchart Solutions Study Checklist.
SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS UAW-GM SAFE DIE HANDLING FOR STAMPING PRODUCTION OPERATIONS Copyright © UAW-GM Health & Safety.
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Director’s Progress Review Closeout Meeting
2K Cold Box FDR Introduction
Workplace Projects.
Lock Out & Tag Out.
Medium Beta Elliptical Cryomodule CDR Closeout
Self-Study Instrument for Early Childhood Centers EDITION
Cryomodule test stand at ESS site
Maintaining Safety Standards
Maintaining Safety Standards
FC facilitation of Installations
LCLS-II Cryoplant Controls Readiness to Procure
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
(Additional materials)
Our Vision Our vision is to be recognised nationally and internationally as a leader in qualification, assessment and verification.
Conducting the performance appraisal
Flooding Walkdown Guidance
Quality Workshop The Local Council Award Scheme is a great guide for good practice in our sector and a way for councils to build confidence in their.
Conducting the performance appraisal
Quality Management Systems – Requirements
SKADS Controller’s Meeting Timeline Annual Financial Report
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Director’s Progress Review Closeout Meeting
Emulsion Task Force Meeting
Procedures for school teams to address struggling students
ESS Installation Binders Readiness Reviews Work Orders Mikael Jakobsson ESS Installation Manager Sep , 2018.
Installation Binder / IRR – an example
Workshop commissioning Installation Coordination at ESS
Presenter name Presenters title
PSS verification and validation
ESS approach and support for Declaration of Conformity (CE-marking) Fredrik Håkansson ESS Accelerator Collaboration Board Meeting Trieste
High Level Readiness Reviews
Licensing update ESHAC #7, October 2017
Positioning, alignment strategy and assembly steps
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Overview of the TARGET Monolith Rough Vacuum
Burst Disc Review Closeout 21 May 2019 J.G. Weisend II, Chairman.
Stuart Birch On behalf of Protection Systems Group
Presentation transcript:

CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman

CDS-EL IRR - J.G. Weisend II General Comments Please keep in mind that May 1 is a holiday at ESS and the rigging team is not available but transport work can be done if the KrioSystem team has previously demonstrated with the rigging group that they can carry out this work safely. A detailed installation plan was presented and in general looks reasonable. It has been coordinated by ESS with other tunnel activites. It does need to be adjusted to alllow start of cold commissioning in early December. KrioSystem should connect the line to the cryoplant at the very end of installation. It is very likely that we will want to then disconnect and later reconnect this line from the ACCP. The capability to weld and reweld this connection should be maintained. There is a possible space conflict with the movement of the CTL pieces and the Klystron assembly area and its workshop. This needs to be checked. A detailed Quality Inspection plan has been developed and is consistent with work done earlier on the Test Stand CDS. No significant technical or safety issues were identified. March 2019 CDS-EL IRR - J.G. Weisend II

CDS-EL IRR - J.G. Weisend II Decision The committee agrees that KrioSystem is ready to start installation of the CDS-EL as planned. The recommendations below should be addressed. March 2019 CDS-EL IRR - J.G. Weisend II

Answers to Charge Questions Have all the CDS-EL project activities related to preparation to the installation phase been documented sufficiently and presented in an appropriate way to enable review at this IRR? Yes 2. Do all the modifications, which were introduced to the CDS-EL design after the CDR meet the system requirements and specifications? Yes but additional designs need to be completed for the auxiliary pipes. March 2019 CDS-EL IRR - J.G. Weisend II

Answers to Charge Questions 3. Have all the recommendations from the CDS-EL CDR and TRR1 been addressed? Yes, but the issue of the HV60 valve should be verified. 4. Will the CDS-EL fit into its allocated space and can be transported there through the given transport paths and pass by other system components? Mostly yes, additional rotation locks are required on some of the trolley wheels and the issue of space coordination in the klystron assembly area needs to be addressed. 5. Have the plan and all required instructions for the CDS-EL installation been sufficiently developed? Yes except the lifting and handling instructions still need to be submitted to ESS. March 2019 CDS-EL IRR - J.G. Weisend II

Answers to Charge Questions 6. Have sufficient workforces been allocated for the CDS-EL installation activities? The work force is consistent with the schedule. Appropriate numbers of ESS staff – alignment, vacuum, area coordinators have been identified. The summer intervals are covered as well. 7. Are all the applicable ESS site safety training requirements met? Yes, KrioSystem has worked on site before and are scheduling their people for all needed safety training. ESS needs to keep KrioSystem informed on the ID06 cards. 8. Have all installation and transport devices and tools been defined? Yes and these have been discussed with the ESS rigging group. The final lifting and handling instructions still need to be submitted to ESS. March 2019 CDS-EL IRR - J.G. Weisend II

Answers to Charge Questions 9. Have all or a sufficient amount of required quality assurance and quality control activities been planned? Yes. Based on the existing verification plan, we believe that there is no need for an additional TRR 10. Have all the required procedures for tests to be carried out during the installation of the CDS-EL components and assemblies been prepared and documented? Yes 11. Is the Partner contractor’s personnel ready for testing the CDS-EL assemblies during the installation phases? March 2019 CDS-EL IRR - J.G. Weisend II

Answers to Charge Questions 12 Have safety issues and technical risks been identified and eliminated or otherwise mitigated? Yes, but the existing documentation needs to be put into the new RAMs format. 13. Does the work unit team require additional input from ESS or its other partners, or seek additional review, decision or approval from ESS to proceed with all work planned? The final agreement on the support approach of the auxiliary lines needs to be made. 14. Are there any outstanding agreements to be made or other actions necessary to allow the work unit to achieve the Plan? No March 2019 CDS-EL IRR - J.G. Weisend II

CDS-EL IRR - J.G. Weisend II Recommendations Adjust schedule to have the beginning of the cold commissioning of the line on December 9. Support the auxilary process lines on the Hilti rails. Finish the design so that progress can be made. ESS will work with the CDS and klystron groups to make sure sufficient space in the klystron assembly area to move the CTL pieces into the tunnel. Prealign supports in the tunnel prior to the installation of the valve box assemblies.This will be done by ESS alignment team. Add longitudinal supports to connect the tunnel installation cranes together. Add rotational locks to a portion of the wheels in the transport trolleys to ease the transport in the tunnel. Confirm that the new plan for making and testing the welds in the interconnects has been reviewed and approved by the ESS welding QA/QC expert. Alter the new proposed sleeves to allow visual inspection of the welds after pressure test. Transfer the risk report into the new RAMS format. This is mostly just a copy and paste activity. Write a short document describing needs for equipment storage space. Finalize the interface between WUST and IPNO auxilary line March 2019 CDS-EL IRR - J.G. Weisend II

CDS-EL IRR - J.G. Weisend II Recommendations Fiducialization data shall be sent at least one week prior to installation of a valve box. Ensure that deliveries are coordinated with the logistics team. Choose an appropriate NDT for the new process pipe interconnections. Add a lock on HV60 to prevent operation when shield circuit is pressurized. An additional safety valve at each valve box might be needed. Also add (ESS) a local pressure gauge so that operators can determine the pressure present before operating the valve. March 2019 CDS-EL IRR - J.G. Weisend II

CDS-EL IRR - J.G. Weisend II One Last Comment The Chair recognizes and thanks the CDS-EL team for all their hard work both in developing the design and in preparing for the review. The Chair also thanks the committee for their service and time in participating in this review March 2019 CDS-EL IRR - J.G. Weisend II