United Maintenance and Contracting Company

Slides:



Advertisements
Similar presentations
KPI Familiarisation.
Advertisements

How to create a PowerPoint Presentation Where do you start Click on the icon on your screen that resembles the one on the below.
HSE Performance of contractors
C O N N E C T I N G B U S I N E S S & T E C H N O L O G Y FRONT PAGE FUNCTIONAL GUIDE INSERT/CHANGE PICTURE: Right click the background, click Format Background.
Effective Workplace Safety Inspections OFFICE OF RISK MANAGEMENT LOSS PREVENTION UNIT.
1 Getting Beyond Compliance With Safety, Health and Environment Management Disclaimer: These safety materials, resources and PowerPoint ® presentations.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. M I C R O S O F T ® Customizing Themes and Master Slides Lesson 11.
Poster Title: - Posters from FMRC Created By: Dev Mondal, Stuart Alleyne, Kan Fang, Alsa Yalan-Murphy Introduction This poster is to serve as a simple.
Chapter 5 Collaborating on and Delivering a Presentation
Ship Recycling Facility Management System IMO Guideline A.962
© 2011 Michigan State University and United Nations Industrial Development Organization, original at CC-BY-SA Procedures FSKN.
© Copyright Alvarion Ltd. Slide Title Arial Bold 30pt Slide Subtitle Arial Bold 16pt Presenter Name Position.
Runaway. Placements.. The following graphics are designed to help you to navigate through this Computer Based Training. The navigational guides require.
Guess What’s Behind the Box Next Slide Remove Box Next Slide.
QUT Library EndNote : Managing images. Adding images to EndNote records With EndNote Version 7, images may be embedded within records The Figure, Chart.
CMPF124 Basic Skills For Knowledge Workers Module 3 Microsoft Office Suite Pt 3 Microsoft PowerPoint Microsoft Office Suite Pt 3 Microsoft PowerPoint.
Microsoft power point Lecture -12- By lec. (Eng.) Hind Basil University of technology Department of Materials Engineering.
Mail Merge.
Instructions.  Open up the letter that Adam has given to you  Format it so it look professional.
® Microsoft PowerPoint 2010 ® Tutorial 3 Adding Special Effects to a Presentation.
The File menu from Word 2003 has been replaced with the Microsoft Office Button. This button contains the basic commands such as Open, Save, Print,
Hubnet Training One Health Network South East Asia Network Overview | Public and Members-only Pages; Communicating and Publishing using Blogs and News.
FIRST COURSE PowerPoint Tutorial 4 Integrating PowerPoint with Other Programs and Collaborating with Workgroups.
1. On the Format menu, click Slide Background. 2. On the pop-up menu under Background fill, click Fill Effects, and then click the Picture tab. 3. Click.
Know your computer Make a Folder Copy from Word to Composer Format the Font Change the Alignment Format the Background Format the Colors Insert a Picture.
Slides 7 - Indicators and environmental controlling Environmental controlling and the use of indicators.
Power Point Tutor. Table of Contents Starting from Scratch Opening an old presentation Inserting an new slide Choosing a background color Fill Effects.
2014 학년도 조선해양 과 현장학습 사전조사 보고서 1 학년 A 반 1 조. How do I modify the LOGO on all slides? 1.This task can be done easily from the [Slide master]. 2.On the [View]
Chapter 11 Enhancing an Online Form and Using Macros Microsoft Word 2013.
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
Non-Emergency HazMat Spill Response
Citizen Entrepreneurs objectives Key international events
How to Protect the Local Environment
Microsoft Office PowerPoint 2003
INTEGRATOR Introduction – H&S Modules (20 Minute Presentation)
Introduction to presentations ms PowerPoint
On each booth you will find 4 to 6 banners
RETAP Retired Engineer Technical Assistance Program
Reducing Fraud Risks Through Effective Information Governance in the Tech Sector September 15, 2017 The Input area of the Beam is a shape with a picture.
Guess What’s Behind the Box
Guess What’s Behind the Box
Using this template set
The Microsoft Office suite provides themes to ensure consistent formatting both within and across documents and thus helps you create documents with a.
x IMPORTANT: read before building your presentation:
Clean Technology (PB386) Click to edit Master title style Numfon Eaktasang, Ph.D.
Power Point Tutor.
Guess What’s Behind the Box
KPI Familiarisation
Technology ICT Core: PowerPoint.
INTRODUCING PUBLIUS AELIUS HADRIANUS BUCCELLANUS
Lesson 20 Getting Started with PowerPoint Essentials
Knowledge management and future of the EUPAN network
Directions 1. On the Format menu, click Slide Background.
United Maintenance and Contracting Company Business Process Reengineering Employee Affairs Business Processes The Input area of the Beam is a shape.
UNITED MAINTENANCE & CONTRACTING COMPANY Business Process Reengineering Human Resources Business Processes The Input area of the Beam is a shape with.
Training tool Admin Expense reports
AWARDS CEREMONY ``` ``` Click on the text to edit To change the logo:
Your Total Solution Provider
How to project yourself confidently – body language
The Input area of the Beam is a shape with a picture fill
United Maintenance and Contracting Company Business Process Reengineering Financial Planning and Costing Key Performance Indicators The Input area.
Step 1:. Open Microsoft FrontPage application.
UNITED MAINTENANCE AND CONTRACTING COMPANY Business Process Reengineering Human Resources Key Performance Indicators The Input area of the Beam.
UNITED MAINTENANCE AND CONTRACTING COMPANY Business Process Reengineering Accounting Key Performance Indicators The Input area of the Beam is a shape.
United Maintenance and Contracting Company Business Process Reengineering Administrative Affairs Key Performance Indicators The Input area of the.
United Maintenance And Contracting Company Business Process Reengineering Project Treasury and Investment Business Processes The Input area of the.
UNITED MAINTENANCE AND CONTRACTING COMPANY Business Process Reengineering Project Materials Department Key Performance Indicators The Input area of.
Catalog Manager Standard Supplier Training.
United Maintenance and Contracting Company Business Process Reengineering Employee Affairs Key Performance Indicators The Input area of the Beam is.
Using this template set
Presentation transcript:

United Maintenance and Contracting Company Final Version United Maintenance and Contracting Company Business Process Re-engineering Plant Safety, Health and Environment Key Performance Indicators 2018 The Input area of the Beam is a shape with a picture fill. To change this, ensure you have the image you wish to use (ideally a .jpg or a .png file) in an accessible folder. The image should have a ratio of 1:1 to ensure it does not appear distorted. When choosing an Input image, follow the principles on The Branding Zone. Customize the Input area of the Beam as described below. In the View tab, click Slide Master from the Presentation Views group. Right-click on the Input graphic and select Format Picture. From the Fill menu, select Picture or texture fill and click Insert from file. Navigate to the folder containing the image you wish to insert in the Input area. Highlight the image and click Insert. You can now preview the image before continuing. If you are happy with how it looks, click OK to continue. Otherwise, repeat the process until you are happy with your selected image. To exit from Slide Master View, click Normal from the Presentation Views group in the View tab. The change you made to the Input graphic should now be visible on the slide.

Table of Contents Document Control Sheet Objectives Plant Safety, Health and Environment KPIs

Document Control Sheet This is a predetermined divider slide and should not be modified.

Document Control Sheet Document Version Date of Submission Review Comments Receipt Date First Draft Second Draft Final Version

Objectives This is a predetermined divider slide and should not be modified.

Objectives The key objectives of the Plant Safety, Health and Environment KPIs document are as follows: Monitor and assess performance of Plant Safety, Health and Environment activities, in coordination and collaboration with the other departments at the Factory. Ensure Plant Safety, Health and Environment activities are executed with high level of effectiveness, and with minimum cost and time.

Plant Safety, Health and Environment KPIs This is a predetermined divider slide and should not be modified.

Plant Safety, Health and Environment KPIs Plant Operations 1.1 – Health and Safety 1.2 – Environment

1.1 – Health and Safety

Key Performance Indicators 1.1 – Health and Safety Key Performance Indicators Cost Time Effectiveness Percentage of fatal accidents Lost time Injury (LTI) (including fatalities ) per hour worked Reportable accidents (including fatalities) per hour worked Health and safety prevention costs Total of man-hours in health and safety training Number of fatalities per hour worked Cost of solved safety non-conformances Percentage of corrective actions completed within planned time-frame Percentage of OHS committee recommendations implemented Frequency of LTI per year Percentage of employees wearing prescribed Personal Protection Equipment Number of days lost due to LTI Ratio of health and safety professionals to company employees Number of safety inspections Number of non-conformance with legal or internal standards in safety inspections Severity of LTI per year

1.2 – Environment

Key Performance Indicators 1.2 – Environment Key Performance Indicators Cost Time Effectiveness Energy costs per unit of production Percentage of corrective actions completed within planned time-frame Percentage of waste recycled Percentage of volume of water recycled and reused Percentage of usage of water from non-traditional sources Amount of household waste collected per head Percentage of hazardous operational waste Water used per amount of product manufactured Percentage of energy used from renewable sources Amount of energy saved due to conservation and efficiency improvements Carbon footprint Nox emissions per 1000 revenue ton Ratio of actual pollution discharge to target levels