Critical Design Review Personnel Safety System: PSS0

Slides:



Advertisements
Similar presentations
SESAME PSS Phase I : Microtron + Booster Morteza Mansouri SESAME PSS engineer on behalf of Safety group TAC Morteza Mansouri, SESAME TAC 2012, Nov.10th,2012.
Advertisements

LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
Neutron Chopper Technologies Work Package
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Details on the Accelerator Installation Plan E. Sargsyan & L. Lari 20 April 2016.
ESS Machine protection review Welcome Henrik Carling ESS/ICS Date:
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Mitigation Devices External Interface ICS Nick Levchenko Lund Date:
Controls standards and support Daniel Piso Fernández Hardware and Integration Group Leader 10 February 2016.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Machine Protection Requirements and Concept Annika Nordt et al. European Spallation Source ERIC Machine Protection Review, December 2015 Lund, Sweden.
Status of Integrated Control Systems
Report Technical Director Storage-Ring-Installation Completed
PERSONAL SAFETY INTERLOCKS External EHS Expert Panel Workshop
Proton Source and LEBT Luigi Celona & Lorenzo Neri
Haz Mat Incident Considerations
Andreas Jansson, Lali Tchelidze
ESHAC meeting October 1-2, 2018
Controls for TS2 Cryomodule Testing System Review
PSS1 overview Stuart Birch
Operations, Risks & Hazards
BCM-BIS Interface Szandra Kövecses
ICS update 7th Experiment Control Workshop
Operations/Control room organization during commissioning
Ciprian Plostinar Workshop on Testing and Commissioning
Introduction to Integrated Control Systems
Ion Source and LEBT control system topology, Interlock strategy
TS2 PSS Architecture, Concepts of Operations and Interfaces
Personnel Safety system 0 for the Ion Source and LEBT (PSS0)
Operations Section Leader
ISRC and LEBT Vacuum System Design
Welcome and charge to the committee
PSS0 Scope Stuart Birch 8th February 2018.
System Architecture of MPSVac and MPSID
PSS0 Design & Concept of Operations
Testing Coordination at ESS
Introduction and Safety Plan
PSS verification and validation
MPS commissioning at ESS
PSS Verification and validation
Safety Analysis and Safety Functions
Author Team Supervisor A. Toral M. Mansouri S.L. Birch Y.K. Sin
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
ODH Phase 1 Hazard Analysis, Monitor Placement, Installation Progress.
Radiation Protection Handbook
Safety Readiness Review (SRR) Thomas Hansson, ESH
The ESS integrated control system Overview and status update
Welcome to the European Spallation Source
PSS verification and validation
Hector Novella Deputy project manager
TS2 PSS; update on concepts of operation and system's architecture
Lessons from the 1st Safety Readiness Review
Hardware integration and interfaces
Accelerator NCFE Liaison Officer
ESHAC Meeting # Peter Jacobsson Head of ESH
RF introduction Anders Sunesson RF group leader
Welcome CDR MPSID and MPSVAC, European Spallation Source ERIC, Lund, Sweden A. Nordt
Charge and Agenda of the 18th TAC meeting
ESHAC #8 Safety Readiness Review Thomas Hansson, ESH
Radiation fields During 1st stage beam commissioning
Accelerator Installation Schedule
ISrc & LEBT – ICS Installation Readiness Review
Stuart Birch On behalf of Protection Systems Group
Introduction to the ESS Integrated Control Systems
IS&LEBT Commissioning Review Safety and Radiation Protection
Presentation transcript:

Critical Design Review Personnel Safety System: PSS0 www.europeanspallationsource.se 2018-02-08

Introduction Ion Source/LEBT Test Stand ESS follows a staged installation and commissioning plan Ion Source and LEBT (made in Catania/INFN) have arrived in Lund and are currently installed 1st step is to operate the Ion Source and LEBT as “test stand” safely

Introduction PSS0 PSS0 is the electrical safety system for the Ion Source and LEBT test stand Mitigation against electrical hazards is implemented by switching off the HV PS (90kV) of the Ion source HV platform Installation is prepared to start on 2018-02-12 (rack installation, cable termination, etc) Scope is restricted to electrical hazards. Radiation hazards (prompt ionising radiation/not activation) are mitigated by shielding the areas where dose levels might exceed >2microSieverts/h with lead. Prompt radiation hazards are mitigated also indirectly by switching off the HV PS of the Isrc (no power, no beam)

MP/PSS - Group Structure Machine Protection and Personnel Safety Systems Group Annika Nordt: Group Leader, WPM (2012-05) Denis Paulic: Deputy Group Leader (2015-03) Riccard Andersson: Technical Project Coordinator (2017-08) Machine Protection ICS/WP14.5: Manuel Zaera-Sanz (Senior Engineer: 2014-08) Enric Bargallo (Lead Analyst for Dependability, MP: 2017-04) Szandra Kövecses (Lead Integrator: 2017-05) Stephane Gabourin (Lead Engineer Fast Interlocks: 2017-08) Viktor Fred (Lead Engineer Electrical Installations: 2017-09) David Valdepenas (Automation Engineer: 2017-10) Fernando Carrasco Martin (Technician: 2018-02) Personnel Safety Systems ICS/WP14.9: Stuart Birch (Senior PSS Engineer, WPM: 2014-08) Morteza Mansouri (SCS Engineer: 2015-05) Yong Kian Sin (IEC 61508 Controls Engineer: 2016-02) Alberto Toral (Technician: 2017-03) Mattias Eriksson (Technician: 2017-11) Vacancies: 1 Technician Goal: Build a flexible and strong team, sharing & extending the different skill sets. Everyone has knowledge relevant for both MP and PSS. MP and PSS will follow IEC61508.

Dear Review Panel: Thank you for participating and sharing your expertise We are looking forward to constructive review sessions