Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)

Slides:



Advertisements
Similar presentations
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
Advertisements

ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Ion Commissioning: Thursday & Friday
Wednesday 8.9 External crossing angles:
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Saturday 30th June - Sunday: Rocky !
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Machine availability reaching well over 80%
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Monday – recovery from MKI flashover
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday 31st August & night
Mike Lamont, Jorg Wenninger
Week 36 plan Todo’s: And also: 12+b injection.
Week 35 – Technical Stop and Restart
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
LHC Morning Meeting - G. Arduini
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Wednesday Ramp single nominal bunches for loss maps
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 14:00 beam dump Access:
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Summary for LPC (March 7th, Ralph Assmann)
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Sat 18/3 - Ramp to 4 TeV Again glitch on the safe beam flag for beam 2. Cause identified: noise on BCT2B giving values above the safe beam limit (2.4×1010.
Summary Tuesday h23: Machine closed. Precycle started.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Saturday 26th March 9:15 Problem with RB78 temporarily solved. It's running on one Thyristor bridge only and without the active filter LHCb polarity change.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday
Daniel, Gianluca and Belen (for the Collimator team)
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Presentation transcript:

Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset) at 3.5 TeV unsqueezed. Very high loss on TCTV B2 in IR8. 21:00: Loss map end of squeeze H, V and +500 Hz (negative energy offset). Looking good. 23:30: Loss map end of squeeze -500 Hz (positive energy offset). Very high loss on TCTV B2 in IR8 - again. Dumped on unmaskable BLM Q7.L3. 7/6/2019 LHC 8:30 meeting

Positive dp/p, squeezed 7/6/2019 LHC 8:30 meeting

Night 00:00: Injectors 02:00: SPS & PS back. Issues with SPS injection kicker – PFN1 to be replaced (1/2 day+) – trying to survive until Monday. PS POPS down… 02:00: SPS & PS back. 03:15: Asynch. dump test squeezed. 05:30: Ditto in collision. New settings OK. Realized that procedure (delay after RF off) tuned for nominal bunch in bucket 1. Statistics hopefully good enough from probe. 07:30: Next go. Issues in the squeeze with OFB switching off in H. some beam lost. 08:00: Loss map with positive dp offset in collision. Again TCTV in IR8 sticking out… 7/6/2019 LHC 8:30 meeting

Asynch dump squeezed - clean 7/6/2019 LHC 8:30 meeting

Asynch dump with colliding beams 7/6/2019 LHC 8:30 meeting

Summary of validations Condition Betatron H Betatron V Dp/p + Dp/p - Dump Injection X Flat top Squeezed Collisions 7/6/2019 LHC 8:30 meeting

Saturday – Dump aperture Aperture of dump line consistent with 2010 results. Tested 14/15 kicker dump (using an orbit bump to simulate missing kicker). OK. 7/6/2019 LHC 8:30 meeting

Today Decision for stable beams. Tentative planning: Collimation and dump colleagues have to check all the data. Collimation OK – not worried about the TCTV in IR8. Tentative planning: Test ramp to 1.38 TeV First fill with stable beams in the afternoon. Then a few fills until Monday PM to bridge the SPS MKP intervention – no beam from SPS ~10:00 to 14:00 on Mo. 7/6/2019 LHC 8:30 meeting