JCAB Activities and Considerations on RNAV Flight Inspection

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

Advanced Piloting Cruise Plot.
Chapter 1 The Study of Body Function Image PowerPoint
B-RNAV OPERATIONS IN EUROPEAN AIRSPACE
Course Schedule three Assessment Scenarios Discussion Groups Discussion Groups.
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
SIP/2012/ASBU/Nairobi-WP/19
Flight Validation Process of RNP APCH Procedures: Thailand Case Study ICAO Asia-Pacific GNSS Seminar Bangkok, Thailand 26 March 2012 Flight Validation.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Regional RAIM Prediction System – Progress Report
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
1 Marinus C. F. Heijl Acting Director Air Navigation Bureau ICAO 30 March 2007 SYMPOSIUM OUTCOMES AND THE WAY FORWARD.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
Introduction to Navigation Specifications
2017/3/28 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Overview of Continental En-route Navigation Specifications
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 CARE-ASAS Activity 3: ASM Estimating safe separations.
Human Performance Improvement Process
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
International Flight Inspection Symposium
Configuration management
Identifying the Achilles Heels of Instrument Flight Procedures International Flight Inspection Symposium Oklahoma City, OK USA June 2008 Ivan Ferencz CAA.
International Flight Inspection Symposium
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
International Civil Aviation Organization Creating Operational Improvements Through Aviation System Block Upgrades Nancy Graham Director, Air Navigation.
Presented to: IFIS 2008 By: Dan Burdette, Airspace System Inspection Pilot Date: June 23-27, 2008 Federal Aviation Administration Electronic Coding/Packing.
VOORBLAD.
Determination of ILS Critical and Sensitive Areas
Overview of the PBN Airspace Implementation Processes
AIRSPACE CONCEPT WORKSHOP CASE STUDY 1 BEIJING, CHINA; 30 JUN-11 JUL 2014.
PBN ICAO HQ Activities Overview
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
22 May 2007OST EASA Transposition of JAA TGL No. 10 (Precision RNAV) Geoff Burtenshaw Technical Advisor, Navigation Systems Directorate of Airspace.
1 PP 48 Use of GNSS distance instead of DME B. Rabiller CNS-ATM steering group meeting Gatwick February 2008.
25 seconds left…...
H to shape fully developed personality to shape fully developed personality for successful application in life for successful.
Procedure Design Considerations
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
International Civil Aviation Organization 5-6 MARCH 2012 AMHS/SWIM SEMINAR/WORKSHOP SP/13.
PSSA Preparation.
CHINA GO TEAM VISIT 2014 Opening Civil/Military Session Erwin Lassooij ICAO PBN Programme Manager.
PBN CHANGES Narrator BEIJING, CHINA; 30 JUN-11 JUL 2014.
Continuous Climb Operations (CCO) Saulo Da Silva
PBN “SETTING UP A NEW BUT SUCCESSFUL, PBN PROGRAMME”
AIR TRAFFIC ROUTES.
RECITE A PRAYER…(15 SECONDS). ATM TOPIC 1. INTRODUCTION TO AIR TRAFFIC MANAGEMENT,TYPE OF CONTROL AREAS & FLIGHT PLAN 2. AERODROME CONTROL 3. AREA CONTROL.
Worldwide Symposium on Performance of the Air Navigation System, Montreal, 29 March RNA and RNAV and RNP Strategy in Japan Yoshiki Imawaka Director.
Vertical, lateral separations based on time / distance
PlaneWrong AGM Thursday 13th October
longitudinal separations based on time / distance
2018/6/11 Hong Kong PBN implmentation ICAO GNSS Implementation Seminar/Workshop 26 March 2012 ICAO FPP fdsagsdfgsdgsdgasdfsadf 1.
Continuous Climb Operations (CCO) Saulo Da Silva
Performance Based Navigation: Navigation Specifications
Continuous Climb Operations (CCO) Saulo Da Silva
RNAV and RNP Strategy in Japan
Long term vision for Air Traffic Systems CARATS
RNAV – process in Tartu How EAVA can co-operate with service providers ONE example - still in progress,,
Presentation transcript:

JCAB Activities and Considerations on RNAV Flight Inspection International Flight Inspection Symposium Oklahoma City, OK USA June 2008 JCAB Activities and Considerations on RNAV Flight Inspection Yutaka OIKAWA Yoshiyuki SASAKI Japan Civil Aviation Bureau

JCAB Activities and Considerations on RNAV Flight Inspection Contents RNAV Introduction Process in Japan by Yutaka Oikawa RNAV Flight Inspection in Japan by Yoshiyuki Sasaki JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

History of RNAV in Japan En-Route 1992: 3 RNAV En-Route for Trial Operation 1995: Shift to Operational Use for Evaluation 2002: Authorize Formal Operation Terminal 1999: FMS Arrival Route using FMS at Tokyo International Airport only for during the middle of night 2004: Increase RNAV STARs to support an additional 5 domestic airports Hakodate Airport Takamatsu Airport Osaka International Airport Fukuoka Airport PBN Manual 2007 Tokyo International Airport En-Route Terminal (SID/STAR) RNAV-5 RNAV-1 Kagoshima Airport TOKYO FMS/LLZ RWY 34R JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection RNAV ROADMAP (1) JCAB RNAV Roadmap (Initial Version) Short-term (FY 2005~ 2007) Introduction and development on RNAV route for the purpose to improve operational efficiency mainly Medium-term (FY 2008~ 2012) Expansion of airspace capacity corresponding to the Phase 2 Project at Kansai International Airport and the Further Expansion Project at Tokyo International Airport Long-term (FY 2013~) Direction for future RNAV operations which Japan should aim at JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Foundation of RNAV Implementation Team Office of RNAV Implementation Team … In JCAB Headquarters Building Several desks in small room Consists of … Director for International policy Coordination Air Traffic Controller Flight Procedure Designer ATS Engineer Airline representative Flight Standards Flight Inspector JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection RNAV ROADMAP (2) JCAB RNAV Roadmap (Latest Version) Short-term (by the end of FY 2007) Early achievement of improvements in operational efficiency by introducing RNAV that meets globally harmonized Medium-term (FY 2008~ 2012) Improvements in operational efficiency by increasing the airspace capacity step by step in response to the Phase 2 Project at Kansai International Airport and Further Expansion Project at Tokyo International Airport Long-term (FY 2013~ 2018, and beyond) Direction for future RNAV operations which Japan should aim at JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Outline of RNAV Roadmap Kansai New RWY Hanada New RWY Segregate RNAV5 and VOR routes Enroute RNAV in1992 RNAV5 RNP2 Enroute Mandate RNP2 above FL290 FMS Arrival in 1999 RNAV1 SID/STARs at radar airports Transition from RNAV1 to RNP1 Terminal RNP1 SID/STARs at non-radar airports Mandate RNP1 at mid-high density airport RNAV(GNSS) Approach with Baro-VNAV RNP AR Approaches Approach Expect to mandate RNP AR Approaches at selected airports JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Work Process for Transaction of RNAV Flight Procedure Step 1: Proposal of RNAV Route or Procedure including candidate DMEs proposed from Procedure Designer to Flight Inspection Step 2: Check DME/DME surroundings by Flight Inspection aircraft Step 3: Result of confirmed DME/DME reception from Flight Inspection to Procedure Designer Step 4: Screening DME/DME surroundings considering mutual angle (30~150) between DMEs by procedure design tool Step 5: Depending on Step 4, back to Step 1 or Publication of AIP Flight Procedure Design Office (Procedure Design Tool) Flight Inspection Office (AFIS) Proposal of RNAV Route or Procedure Step 1 Flight Inspection Step 5 Step 2 no Sufficient Numbers of DMEs reception and Appropriate mutual angle Step 4 Result of DME/DME reception Step 3 yes Step 5 AIP Publication of new Route or Procedure JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Flight Inspection on RNAV Route RNAV Flight Inspection World VOR/DME GNSS IRU DME/DME DME/DME Inspection GNSS Inspection How should we check? JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Conventional NAV Aids Inspection DME/DME RNAV Inspection Different Points Conventional NAV Aids Inspection Course error, Distance error, etc. Simple! FIX VOR route FIX VOR/DME DME/DME RNAV Inspection Each DME Distance error? Good DME/DME pair ? Critical DME ?? DME gap ??? Assessment by Tool and Simulator ….. Etc. DME DME DME/DME RNAV route ×△#±・・?? DME/DME DME DME JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection DME/DME pair BBE BBE BBE station is Critical DME! BBE JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

MMR ; Gulfstream-IV only Inspection System MMR VOR MMR ; Gulfstream-IV only Inspection System Aircraft System #1 & #2 #1 & #2 #1 & #2 SAAB 2000 JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection JCAB regime Procedure designer at JCAB headquarters AIP Airspace Planner at ATM center Request ATM center; Air Traffic Management center Report Flight Inspection JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Preparation before Flight Entering route information Creating DME list DME list file!! Setting requirements JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Requirements for creating DME list ☞ Aircraft position and topography data ※Candidate DMEs are selected within line of sight ☞ Creation of DME/DME combination based on DMEs located within 160 NM ※First, the combinations are made in such a way that the relative angle between DMEs becomes approximately 90 degree. (30 degree ≦ related angle ≦ 150 degree) ☞ Exclusion of ILS DME, foreign DME, etc. from DME/DME combination ☞ Extracting 5 DMEs in each segment from the candidate DME/DME combinations as considering distance between aircraft and DME station ※Basically, 5 DMEs are selected from the nearest DME station to aircraft in distance order. ※In the case of RNAV5, 5 DMEs operated for 24 hours In the case of RNAV1, included the Terminal DME ☞ Calculation of position error based on the best DME/DME combination Creating DME list JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Check DME list with FMS Flight Plan Before Actual Flight DME list file!! Flight Plan!! Check RNAV route on FMS OK! OK! Let’s start flying!! Check DME list with FMS Flight Plan JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection During Flight What’s this? Ah, oh・・・. Check! Check! DME DME DME DME DME JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection Terminal RNAV Route Primarily Area Secondary Area Secondary Area Receivable ? JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB criteria on RNAV route Item Tolerance Data Base Integrity Distance: within 0.1NM Bearing: within 0.1° ※between WPs for locked DME DME/DME pair More than 1 pair ※ 30°≦inclusion angle≦150° Critical DME If yes, report the range to Flight Procedure Designer DME gap Item Tolerance Specific DMEs Report the DME to Flight Procedure Designer ※ Specific DMEs: degrade the navigation solution Communication and RADAR Within covergae ※ RADAR: if RADAR service required Flyability Flyable Other ・DME signal strength ・PEE & TSE ・VOR signal, if needed ・GNSS signal DME error Within 0.2NM PEE: Position Estimation Error TSE: Total System Error JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Re-assessment after Flight ✔Revised the original DME list based on Flight Inspection results ✔Re-assessment of the candidate RNAV route with the modified DME list Before Flight After Flight DME? DME DME DME DME? JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Report to Flight Procedure Designer Public announcement OK! AIP ☞ List of available DMEs on each segment ☞ Name of critical DME and the area where it happened ☞ Area where DME gap happened ☞ Unsuitable DME station which might deteriorate position solution ☞ Comments on flyability JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection Confusion ?? ✔ How should we deal with the confused case in which we found the out of tolerance on DME signal? ✔ Should we check DME coverage not only on center course but also on edge of route? ✔ Every type of RNAV system is supposed to select DME/DME pair from DMEs checked by Flight Inspection or Simulation tool? ✔ Flyability checks of RNAV route can be judged only by Flight Inspection aircraft? ✔ etc. JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Error lines of each DME signal Considerations (1) ✔ How should we deal with the confused case in which we found the out of tolerance on DME signal? RNAV5 – OK if..... DME/DME pair without bad DME VOR/DME available in the portion GNSS IRU DME4 No signal ! RNAV1 – OK if..... DME/DME pair without bad DME DME/DME/IRU GNSS DME5 DME4 DME3 DME2 DME1 Error lines of each DME signal JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Considerations (2) ✔ Should we check DME coverage not only on center course but also on edge of route? Receivable in protected airspace? Secondary Area Secondary Area Primarily Area Obstacles clearance OK? GPWS or EGPWS, No warning? EGPWS; Enhanced Ground Proximity Warning System JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection ✔ Every type of RNAV system is supposed to select DME/DME pair from DMEs checked by Flight Inspection or Simulation tool? D DME & E DME B DME & E DME A DME & B DME DME DME DME ….. “Surrounding” Check DME where RNAV systems do work properly!! JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

Considerations (4) ✔ Flyability checks of RNAV route can be judged only by Flight Inspection aircraft? Various Tracks ! Flyability Obstacle ?? Altitude ?? Climb/Descend rate ?? Turning angle ?? Speed limitation ?? Intercept ILS ?? etc… FMS-1, FMS-2 , FMS-3, FMS-4, FMS-5…. Different Aircraft ! Different Performance ! Useful comments for Flight Validation JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection Conclusion Flight Inspector Skill for Conventional Inspection and… ✔ Complicated knowledge ✔ Flight procedure design criteria Flight Inspection aircraft and system Depending on purpose… ✔ Only check on signal ? ✔ Flyability ? ✔ FMS ? Auto Pilot ? JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection Future work Present Map Tool Procedure Design Tool Procedure Design Tool On-line Procedure designer at JCAB headquarters Airspace Planner at ATM center To prevent us from making a mistake in data exchange Procedure Design Tool Flight Inspector JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC

JCAB Activities and Considerations on RNAV Flight Inspection Thank you very much! Thank you ! JCAB Activities and Considerations on RNAV Flight Inspection IFIS 2008, OKC