Current Status of Japanese Road Bridges and Future Perspective

Slides:



Advertisements
Similar presentations
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
Advertisements

AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
1 Roadway User Costs Nathaniel D. Coley Jr. Prefabricated Bridge Elements and Systems Work Zone User Costs Nathaniel D. Coley Jr. Federal Highway Administration.
Analysis of Financial Statements
1
EuroCondens SGB E.
& dding ubtracting ractions.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
OPTN Modifications to Heart Allocation Policy Implemented July 12, 2006 Changed the allocation order for medically urgent (Status 1A and 1B) patients Policy.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
Safety assessment in design and preparation phase
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 Operational Meteorology for Natural Disaster Prevention and Mitigation Alexander Gusev Acting President of the WMO Commission for Basic Systems.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
0 - 0.
1 1  1 =.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Wants.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
SEQUENCES Target: To find the next number in the sequence.
Institute for Road Construction and Maintenance - Vienna University of Technology ISTU O PTIMIZED P AVEMENT D ESIGN W ITH R ESPECT TO Q UALITY AND E CONOMY.
© Tarek Hegazy – 1 Basics of Asset Management Prof. Tarek Hegazy.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Inspections on an iPad, iPhone, iPod Touch, Android Tablet or Android Phone.
Solve Multi-step Equations
BUSINESS PLAN Guide Questions 1. What is the nature of the project? 2. What are the entrepreneur's competencies and qualifications? 3. What are the project's.
Break Time Remaining 10:00.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
ABC Technology Project
Look at This PowerPoint for help on you times tables
TRANSPORTATION OF DANGEROUS GOODS
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
 Depth Into the earth Surface of the earth Distance along the fault plane 100 km (60 miles) Slip on an earthquake fault START.
Adding Up In Chunks.
PS-5 Test Review. Questions 1 & 2 Distance – 60m/ magnitude only Displacement 10 m east/ magnitude and direction.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Sets Sets © 2005 Richard A. Medeiros next Patterns.
LO: Count up to 100 objects by grouping them and counting in 5s 10s and 2s. Mrs Criddle: Westfield Middle School.
1 The new government has to develop a systematic campaign to contact: 1) Regional and communal associations abroad and in Haiti. Communities can participate.
Before Between After.
Addition 1’s to 20.
25 seconds left…...
Subtraction: Adding UP
Test B, 100 Subtraction Facts
Week 1.
Number bonds to 10,
Analyzing Genes and Genomes
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Concrete Construction Part 1
Intracellular Compartments and Transport
A SMALL TRUTH TO MAKE LIFE 100%
PSSA Preparation.
& dding ubtracting ractions.
Copyright © 2013 Pearson Education, Inc. All rights reserved Chapter 11 Simple Linear Regression.
Select a time to count down from the clock above
Findings from On-site Inspection (Rt 202/US Rt 23 BRIDGE)
REPAIRS AND REHABILITATION OF STRUCTURES UNIT – II
Presentation transcript:

Current Status of Japanese Road Bridges and Future Perspective HIROAKI TERAMOTO Ministry of Land, Infrastructure and Transport

Numbers of bridges by type of material (only bridges over 15m)

Distribution of bridges for completion year

Road Work Budget in JAPAN (2005) Maintenance & repair £1.44 billion National Road Projects £11.47 billion (22.5%) Construction, operation & others Total investment in road projects in JAPAN £50.96 billion (100%) Projects undertaken by local governments £30.65 billion (60.1%) Operation of Toll Roads £ 8.84 billion (17.4%)

National Highways Maintenance Budget(2005) Repair work for Structure: (35%) Repair of bridges and tunnels, Pavement Daily Maintenance : (13%) Road cleaning, Planting etc. Maintenance £1.10 Billion ( 77 %) Road Patrol : (9%) Minor Repair Work : (18%) Repair for retaining walls, drains etc. Maintenance and Repair (£1.44Billion) Others : (2 %) Emergency restoration for disasters Improvement £0.33 Billion (23%) Countermeasures for earthquakes : (11%) Reinforcing of substructures, Prevention for bridge fall Disaster prevention : (12%) Slope protection

Type of Inspection in JAPAN Usual Inspection Periodic Inspection Special Inspection (Salt Damage, ASR, Fatigue…) Disaster Inspection ( Earthquake, typhoon…)

Damage of Road Bridges in JAPAN (the Results of Periodic Inspection)

Fatigue cracks on girder

Breaking of reinforcing bars by ASR Damaged gas pressure weld point (main reinforcements) Breaking at corner of the shear reinforcement

Dropping-off of concrete of RC Slab

Causes for bridge reconstruction (National highways and prefectural roads)   Steel bridges PC bridges Cracking and peeling of concrete (Chloride attack) 16.7% Damage of RC slab 33.3% Cracking and peeling of concrete 50.0% The others 6.8% Damage of RC slab 67.2% Corrosion of steel member 26.0%

Chloride damage of PC girder

Air Salt in Winter (climate) Tsukuba Narita Airport Tokyo Kansai Airport Osaka Kyoto Tokyo to Tsukuba 50km Tokyo to Osaka 560km N S Monsoon Rome latitude

Maintenance cost for a deteriorated concrete bridge

Prediction by the results of Inspection (example) Chloride Damage in concrete at cover depth If Cl- exceeds 1.2kg/m3 or will exceed 1.2kg/m3 within next 10 years, Planning of Repair should be undertaken.

Relation between type of repairs and cost Case 1:Preventive repair (Minimizing Life Cycle Cost) Case 2:Repair at the repairable limit state T₁ T₂ T₃ year Evaluation period Cost Case 1 Case 2 Soundness Small repair Large

Asset Management Flow of Bridges Maintenance Bridge Dimensions Inspection Properties of structure Database Prediction of Future Soundness Comparison of Type of Measures,Minimizing of Life Cycle Cost, Budget Restriction / Social Situation Investment Analyzing Risk based Prioritization Decision of Management Plan Execution of Measures or Maintenance Evaluation of Present Soundness

SUMMARY ( Needs in JAPAN) (1) Inspection of Local Road Bridges ( needs to make a New Act/Law) (2) Improve the Forecast Model of Deterioration ( the Methods of Life Cycle Cost Analysis ) (3) Develop Non-Destructive Test Techniques (4) Develop Prioritization System of Maintenance (5) Make the Market of Maintenance-Works more Attractive and Profitable

Thank you for your attention! END