PRESENTER: Paul ”Capt. Grout” Layman STABILIZING BRIDGE BANKS FROM SOIL EROSION ON THE TOK AND RICHARDSON HWY WITH CHEMICAL GROUT PRESENTER: Paul ”Capt. Grout” Layman
Pieces of the Puzzle Single Epoxy or Plural Acrylic Phobic Acrylates Urethane Silicates Single or Plural Epoxy Acrylic Phobic Philic Acrylamide
Geo Information
Layout Pattern
Area To Be Permeated (Grouted)
Area To Be Permeated (Grouted)
Grouting Procedure Completed
Heated Workstation
Road Bed Layout
Road Bed Layout (Water and Grout Injection)
Checking Our Takes
The End