Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007.

Slides:



Advertisements
Similar presentations
ATC Simulation as an integral part of ensuring Operational Safety David Webb Air Systems.
Advertisements

1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
1 Safety Assessment July SAFETY ASSESSMENT A Safety Assessment is essentially a process for finding answers to three fundamental questions: What.
1 Managing Authority Conducting a self assessment 10 June 2008 A. Badrichani – DG Regional Policy – Audit Unit J3.
Second Global Symposium on TEM and NOSS in Air Traffic Control February 7, 2007 NOSS and the ATS Provider A Perspective from Senior Management Kathy Fox.
Overview of the interoperability Regulation
FANS (Future Air Navigation System) Flight Crew Procedures
1 ICAO WGN New Orleans Nov Programme Overview Incentives and a Mandate Issues Conclusion Contents.
NEXCOM Next Generation Air/Ground Communications Briefing Presented to AMCP Working Group M Montreal, Canada December 16, 2002 James T. Eck Air/Ground.
1 LINK European Organisation for the Safety of Air Navigation ICAO WG N Brussels July 3 rd -6 th Presented by Eurocontrol – Martin Adnams.
1 PHARE Operational Scenarios J-P. Nicolaon, Operational Task Force Chairman EUROCONTROL Experimental Centre.
Ground Human Machine Interface (GHMI): trends and the future
1 Measurements & Validation R G Stamp Head of Department of ATM Research National Air Traffic Services Ltd, UK.
1 Validation & Measurement Methods for the PHARE Demonstrations R A Whitaker Validation Project Leader.
1 C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE PHARE Aeronautical Telecommunication Network: PATN By Gérard Mittaux-Biron PATN Project Leader CENA.
Introduction ATMCP and Performance Dominique Colin de Verdière (CENA) Bernard Miaillier (Eurocontrol) TIM9 - ATMCP-RTSP May 2002.
Whole Airspace ATM System Safety Case - Preliminary Study
CARE ASAS Validation Framework System Performance Metrics 10th October 2002 M F (Mike) Sharples.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
CARE-INO ANIMS: Animation and Sound in ATC Human Machine Interfaces December 6, 2005 Célin e Schlienger In t uiLab, t uilab.com t uilab.com.
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
0 - 0.
Addition Facts
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Expert Groups in Episode 3 Episode 3 - CAATS II Final Dissemination Event Raquel Garcia Isdefe Episode 3 Brussels, 13 & 14 Oct 2009.
EMS Checklist (ISO model)
Episode 3 / CAATS II joint dissemination event Gaming Techniques Episode 3 - CAATS II Final Dissemination Event Patricia López Aena Episode 3 Brussels,
14/05/2008 Brussels, AP4 Workshop SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
19/09/2007 Belfast, AIAA Conference SWIM-SUIT Giuliano dAuria SELEX Sistemi Integrati.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR CXXX-1A Page 1 The ONESKY (Single-Sky) project and what it means for ASAS.
Determining the Significant Aspects
Page 1STNApresentation of data-link activities DATA-LINK IMPLEMENTATION IN FRANCE Initial data-link services with ACARS - Departure Clearance, ATIS - CPDLC.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
C ENTRE D'ETUDES DE LA NAVIGATION AERIENNE ASAS-TN, 2nd workshop - Malmö 6 ~ 8 october 2003page 1 Electronic separation Clearance Enabling the Crossing.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Addition 1’s to 20.
Test B, 100 Subtraction Facts
ATN ‘99, London, 23 September 1999 David Russell ATS Market Manager, SITA AIRCOM SITA AIRCOM Data Link Service.
Air-Ground Data Link - DFS Strategy
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
Integrated information and telecommunications solutions AIRCOM Implementation VHF Digital Link Presented by Philip Clinch to ATN 2001 Conference 19 September.
Episode 3 / CAATS II joint dissemination event Combining Techniques: Expert Groups, Fast-Time Simulation and Prototyping Episode 3 - CAATS II Final Dissemination.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
Satellites enabling the integration in non- segregated airspace of UAS in Europe Dipl. Phys. Mirsad Delić, Dr. Henk Hesselink Dipl. Ing. Frank Morlang,
ATN Subnetwork Implementation:
ATN 2002, London - 24 Sep 02 1 OPERATIONAL DATA LINK AT MAASTRICHT UAC P2L PETAL TO LINK Gustaaf Janssens Maastricht UAC Project Manager P2L.
EEC-ATI (V2) 1 ATN2002 CONFERENCE LINK2000+ ATN2002 CONFERENCE LINK2000+ LINK2000+ European ATS Provider Benefits Real-time Simulation Results ATN2002.
ASSTAR User Forum #1 Rome 4th April 2006 ASAS-TN2 Second Workshop ASSTAR Safety Approach and Preliminary Issues Dr Giuseppe GRANIERO, SICTA
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
FANS-1/A and ATN Data Link: An Avionics Perspective Bob Kerr
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
CARE/ASAS Validation Framework Guidelines & Case Studies Mark Watson NATS.
2 nd ASAS-TN2 Workshop - Rome, 4 th April 20061/13 Civil-Military cooperation as a key factor in ASAS implementation Italian Air Force (IAF) Ltc. Maurizio.
4 th Workshop, Amsterdam, April 2007 G2G project G2G project : ASPA S&M experiments and main validation results Marinella Leone
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
Integrated Project of the Sixth Framework Programme, Priority 1.4: Aeronautics and Space, sponsored by EC, DG TREN Contract FP Internet:
Malmö 5 September. 27 th 2005 NUP ITP TT Reykjavik “NUP -- ITP”
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
The Air Ground Datalink Server (AGDS)
Ground System implication for ASAS implementation
Karim Zeghal EUROCONTROL Experimental Centre
ICAO WGN New Orleans Nov 2004
DATA LINK IMPLEMENTATION IN EUROPE
ATN Subnetwork Implementation:
Presentation transcript:

Fulvio Lecci Link It Program Manager Technical Area - ENAV Link2000+ Workshop – Brussels 10, 11 October 2007

2 10 th october Brussels The approach to data link ENAV commitment In 2001 ENAV decided to commit to Link2000+ Initial studies to define basilar requirements Designed Airspace Network ownership Data Link Approach Business Case to demonstrate data link feasibility Safety Assessment process FTS, Data Link HMI Definition & Prototyping Operational Implementation

3 10 th october Brussels Designed Airspace UIR Roma (FL290 – 460) UIR Milano (FL296 – 460) Managed by Roma ACC

4 10 th october Brussels Safety Assessment steps Operational environment and related services Functional Hazard Assessment to identify risk level of the new functionalities CPDLC HMI Functional Requirements Functional Requirements Document for the use of L2k+ baseline services (DLIC,ACM,ACL,AMC) Safety Assessment process

5 10 th october Brussels Data Link HMI Definition & Prototyping Prototype of a new Human Machine Interface Related working methods for the use of the datalink services Based on the one currently in operation in Rome ACC Efficiency Analysis Analyse the impact of data link communications on ATCOs Workload. Definition and validation of new controllers tasks by Real Time simulations. Safety Objectives Validation Specific Safety Scenarios were developed and injected in the RTS Validation of FHA Safety Objectives compliance with the Hazards identified in the FHA and in the ED120 FTS/RTS: step by step approach

6 10 th october Brussels Innovative Control Working Position solutions supporting Data Link services for testing CPDLC operations FTS/RTS: HMI prototyping ACL message: authorized to level … (UM19, UM20, UM21) AB button on ALV or Modo C field label: ALV menu to send clearances. AB button on clearance level of right column (DL mode): DL message will be sent. In the label a yellow frame will close ALV field. Pilot has receveid clearance. Pilot will answer WILCO. When WILCO message will be received from system, yellow frame around ALV field get off.

7 10 th october Brussels 2 2 Real Time Simulation (Human-in-the-loop) and 1 Fast Time Simulation ( SICTA and ENAV Experimental Centre ) 1 st Real Time 1 st Real Time Simulation exercise aiming to define and evaluate new controllers tasks (qualitative and quantitative approach), to feed FTS A Fast Time Simulation exercise to evaluate the efficiency and the potential increase of sectors capacity, based on preliminary indications from 1 st RTS 2 nd Real Time 2 nd Real Time Simulation exercise to evaluate Safety and Human Factors aspects FTS/RTS: main activities

8 10 th october Brussels Constant decrease of workload in each of future (CPDLC) scenario Progressive and regular decrease of the voice communications amount Decrease of time duration of voice communication Increase of Sectors Capacity up to 12.8% (with 100% of traffic D/L equipped). The different results in term of capacity depend on the typology of Sectors (e.g. Feeder of Roma TMA) and the characteristic of traffic (e.g. overfly) Slight reduction of improvement margins in case of non-nominal scenario FTS/RTS: main results of FTS

9 10 th october Brussels FTS/RTS: evidence of results of FTS

10 10 th october Brussels Airspace Environment Airspace Environment 2 sectors (EWU & OVS) 2 sectors (EWU & OVS) 2 Feeder (Marsiglia/Tunusi as other ATSU and Roma ACC as sector of same ATSU) 2 Feeder (Marsiglia/Tunusi as other ATSU and Roma ACC as sector of same ATSU) Traffic Sample Traffic Sample 3 levels of traffic (75%, 100% & 130% of sector capacity as reported to CFMU) 3 levels of traffic (75%, 100% & 130% of sector capacity as reported to CFMU) 2 percentage of aircraft D/L equipped (50% & 75%) 2 percentage of aircraft D/L equipped (50% & 75%) ATC Working Methods ATC Working Methods Baseline (R/T modality) Baseline (R/T modality) Baseline + CPDLC modality Baseline + CPDLC modality Baseline + CPDLC modality with task sharing between EXE & PLN Baseline + CPDLC modality with task sharing between EXE & PLN Organizations Organizations 23 exercises with 8 ATCO in rotation 23 exercises with 8 ATCO in rotation Non-Nominal Events Non-Nominal Events : Military Area and Bed Weather Conditions Faults Injections (e.g. Misdirection of message, corruption of message) Faults Injections (e.g. Misdirection of message, corruption of message) FTS/RTS: human in the loop simulations

11 10 th october Brussels FTS/RTS: Roma ACC sectors Feeder East Roma ACC Feeder West Marsiglia/Tunisi

12 10 th october Brussels Over the Shoulders Observation Safety & Human Factors Experts Questionnaires Human Factors post run (based on NASA TLX and SASHA) Human Factors Survey Safety post run Personal Interview Instantaneous Self Assessment (ISA) Debriefing post run Debriefing post simulation sessions Eye Tracking The map of hot-spot shows the areas which are mostly fixed by ATCO during a run FTS/RTS: evaluation activities

13 10 th october Brussels FHA Safety Objective Validation Identification and evaluation of the effects of Hazards on the basis of ATCO behaviours and feedback Evalutation of the effective risk related to more critical Hazards (e.g. Misdirection of message, Corruption of Flight Level message) Supported by proof the Severity of Operational Consequences and the Safety Objectives derived from the FHA Identification of some mitigation means to apply in design and implementation of new HMI FTS/RTS: output of SO validation

14 10 th october Brussels Measurement of workload through the Instantaneous Self Assessment Compared the Baseline scenario (R/T modality) with the D/L scenario (R/T + CPDLC modality) Evident reduction of workload in the organizations with CPDLC FTS/RTS: evidence of results of ISA

15 10 th october Brussels Human Factors Trust of ATCO in the CPDLC Significant reduction of workload and voice communications Increase of Situational Awareness Positive ATCO feedback on HMI usability FTS/RTS: main results of RTS

16 10 th october Brussels Contract objectives Implementation of DLIC, ACM, ACL, AMC Initial CPDLC services will be implement in Roma ACC using VDL2 network Implementation of data link network A new network supporting VDL2, AOA, ACARS protocol will be developed and implemented Implementation of D-ATIS and DCL D-ATIS and DCL will be implement in Fiumicino and Malpensa airport using ACARS protocol Operational Implementation

17 10 th october Brussels Implementation Phases Definition, Testing, Implementation of Multimode Ground Station New VHF, VDL, ACARS Ground Station to manage ATS and AOC messages. Partnership Agreement with ARINC. Implementation of data link network Network of initial 10 MGS to cover Roma UIR and most important airport, starting from Fiumicino and Malpensa. MGS will be connected together and integrated in ENAV network using E-Net transport services (ENAV program to implement ATM network connections) Upgrade of the HMI Data link new functionality will be implement in operational HMI used in Roma ACC. Pre-operational phase in PSA Pre-operational phase will be performed in PSA of Roma ACC (Test, Simulation and training room) Assess operational validation of CPDLC services. Training sessions for controllers. Operational phase CPDLC services will be implement in Upper sectors managed by Roma ACC. Operational Implementation

18 10 th october Brussels Timing of data link implementation Operational Implementation Project Definition Development and testing of MGS System and Network Implementation Operational Rome UIR Pre-Operational Phase in Rome PSA Pre-Operational phase in Fiumicino & Malpensa Operational phase in Fiumicino & Malpensa Other airport and ACCs

19 10 th october Brussels Operational Implementation