SVD group organization, schedule, milestones

Slides:



Advertisements
Similar presentations
VELO Module PRR preparation meeting28-feb-2006 LiverpoolMassimiliano Ferro-Luzzi 1 Introduction VELO overview Overall planning A bit of (recent) history.
Advertisements

A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Electrical QA Markus Friedl (HEPHY Vienna) IPMU, 19 March 2012.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
7 th B2GM SVD Summary 19 November 2010 Markus Friedl (HEPHY Vienna)
Status of SVD Readout Electronics Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Status of shaper prototype production B.G. Cheon (Hanyang U)‏ Dec. KEK 1 st open meeting of the Super KEKB Collaboration.
The Mechanical Structure for the SVD Upgrade
C. Kiesling, 1st Open Meeting of the SuperKEKB Collaboration, KEK, Dec , The DEPFET-Project: European Collaboration for a Pixel SuperBelle.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
11 June 2015 Thomas Bergauer (HEPHY Vienna) Belle II SVD beam Test SPS 2015 SPS users meeting.
1 The Discussions of the Installation Procedures of Scibar Fiber, PMT, CLR(Gain Monitor), Lower Service Floor & Others Edward Chi June 02, 2006 Fermilab/PPD/MD.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, 2015 (updated on Jan. 23) 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
QCG Report Francesco Forti University and INFN, Pisa.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
NSW SG 10 Dec Nov 2014 S. Zimmermann, NSW SG 1.
Laser Control Status A. Masi, T. Feniet, K. Szczurek Awake Technical Board November 12 th 2015 Thanks for inputs from: M. Donze`, V. Fedosseev, C. Hessler.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
SVD Slow Control Markus Friedl (HEPHY Vienna) DAQ/SC Kickoff Meeting, 8 November 2012.
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
News From KEK S.Tanaka. FY2010 prelim. run schedule 2 Long-term Scheduling Committee (Uno) Max. : 12-May ~ 30-June actual run time is not decided yet.
WBS 1.05 Commissioning Detector Scope, Cost & Schedule Sven Vahsen University of Hawaii.
B2GM, July 2013, Blacksburg, VA B2GM Summary 1 Blacksburg, VA, July 4-7 Executive changes Spokesperson: Peter Krizan -> Tom Browder IB Chair: Eunil Won.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
Florian Buchsteiner (HEPHY Vienna)
L.Vitale INFN and Univ. Trieste
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
SVD Overview Christoph Schwanda Institute of High Energy Physics Austrian Academy of Sciences 8th Belle II VXD Workshop September 9-11, 2015 Trieste, ITALY.
Unit 6 Application Design KLB Assignment.
Jim Fast Pacific Northwest National Laboratory
Markus Friedl (HEPHY Vienna)
Slow Control Servers C. Irmler SVD 27th B2GM, KEK 21 June 2017.
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
LIU Wire Scanner Milestones June 2017
Discussion items SVD mechanics session.
Report on WP2 Activities
Katsuro Nakamura Sep. 10, 2015 VXD meeting
TileCal upgrade EVO meeting Demonstrator tesks
10/month is the present production rate 2 FTE + sporadic contributions
MicroMegas Mechanical Meeting --- Cern April 2014
SVD Mechanics Group Organization & Work packages
Belle II Schedule Yutaka USHIRODA Jan
BPAC, 17 October 2017 VXD GND/EMC Markus Friedl (HEPHY Vienna)
Electronics Sub-Group
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Presentation transcript:

SVD group organization, schedule, milestones C. Irmler (HEPHY Vienna) 7th Belle II VXD Workshop, Prague 21 Jan. 2015

C. Irmler (HEPHY Vienna) Outline Group Organization Schedule & Milestones Discussion 21 Jan. 2015 C. Irmler (HEPHY Vienna)

SVD Group Organization 21 Jan. 2015 C. Irmler (HEPHY Vienna)

SVD Sub-Group Coordinators Deputy Advisor Mechanics Florian Buchsteiner Markus Friedl Filippo Bosi Ladders Takeo Higuchi Yoshiyuki Onuki Giuliana Rizzo Electronics Monitoring & Interlocks Lorenzo Vitale Software Andrzej Bozek Commissioning Katsuro Nakamura Coordinators are contact persons of their fields Details about sub-group organization will be shown in SVD sessions 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Sub-Group Tasks 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Sub-Group Relations Details to be defined by sub-group coordinators 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Outline Group Organization Schedule & Milestones Discussion 21 Jan. 2015 C. Irmler (HEPHY Vienna)

Possible new schedule (tbc) SVD installation shifted by ~ 7 months compared to ‘desirable’ option of Nov. B2GM Difficult to interpret what Yamauchi-san’s brief notice means, but assume phase 1 starts as “early” as Jan. 2016 (=conceivable budget scenario) Start of TOP installation += 2mo. 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Global SVD Milestones Ladder mount Jan. 2016  will slip by ~ 6 month How long do we really need to mount ladders Depends on Method (from top or side) Test to be performed after each ladder + after each layer Should start discussing this in detail VXD assembly + commissioning: June 2017? After installation of BEAST phase II detector VXD installation: Feb. – July 2017 SVD ladder production should be completed by May 2017 at latest. 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Feedback from BPAC (1) Define set of high-level and lower-level milestones Should agree to list of milestones before Feb. BPAC 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Feedback from BPAC (2) Consider to give up contingency at the end of production to allow additional tests (thermal and electrical) on ladders! 21 Jan. 2015 C. Irmler (HEPHY Vienna)

Milestones Related to Ladder Production Completion FlexPA specs: end of Jan. 2015 FlexPA production: until end of April 2015 PA0 spec: end of Jan. 2015 PA0 test production PA0 evaluation Start of PA0 and Origami production First class B ladder / module (for FW/BW, L3, L4, L5, L6) Start of class A production (for FW/BW, L3, L4, L5, L6) Dates for final site qualifications Evaluation of class B / A ladders Shipment of components (from/to KEK) 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Other Milestones (1) Electronics Full prototype of FADC V2 system (incl. FPGAs) Start / completion of FADC mass production Dates for required noise tests Dates for Beam tests etc. Mechanics Demonstration of ladder mount from top Decision on ladder mount procedure Completion of open design issues 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Other Milestones (2) Monitoring and Interlock Software Commissioning BEST 2 Decision on SVD ladder mount procedure Ladder mount start 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) How to Proceed Let’s define the Milestones for each sub-group Extract global major milestones Define dates for them Who? SVD leaders together with sub-group coordinators. Need input from sub-groups. 21 Jan. 2015 C. Irmler (HEPHY Vienna)

C. Irmler (HEPHY Vienna) Thank You! 21 Jan. 2015 C. Irmler (HEPHY Vienna)