API RP 17Q Status January, 2014 First Edition issued June 18, 2010

Slides:



Advertisements
Similar presentations
API 17 A Winter session 2013 Report. API17A Formation of task groups WE ARE REQUEST ING VOLIUNTEERS FOR EACH TASK GROUP Task Group 1 Overview systems.
Advertisements

API Specification 6A Furnace Calibration Requirements
SC19 report to SC18 January 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 5 – Immunity Stephen R Whitesell SC-5 Chair 11/13/2014.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
1 API Subcommittee 6 Plenary Meeting Resource Group on Materials Tim Haeberle Chairman – API SC6 Resource Group for Materials 6 February 2014.
New Item API Specification 6A Furnace Calibration Requirements Tim Haeberle 30 June 2011.
Tim Haeberle API SC Winter Meeting
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
Kent Grebing, API SC 16 Chair
Don Wells Hess Corporation
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
San Francisco, CA. SC8 Liaison Report
19th January 2012 Don Wells (Hess)
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
RMS Issue Request Form October 12, Purpose Provide RMS and its Working groups/Taskforces with clarity and understanding around issues Provide structure.
Supply Chain Management Report for SC 18 January 2013.
API SUBCOMMITTEE 17 SUMMER MEETING 13 January /13/2016 Subsea Industry Standardization Landscape Terry Cook – API SC17 Vice-Chair.
TG Chair: Darren Bane (BHI)
Task Group API 19SS Sand Screens
5.5 Control Scope The process of monitoring the status of both the project and product scope Focuses on managing any changes to the scope baseline and.
Carry Over From API SC6 Winter Meeting API Standard 6A718 Inclusion of Additional Alloys Tim Haeberle 30 June 2011.
Task Group Status January ,11, 2017
API 17X Subsea Boosting January 13, 2015
Request a Content Change for Novartis.com
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
SRRTTF TTWG Meeting Dave Dilks July 6, 2016
Tim Haeberle API SC Winter Meeting
Task Group API 19SS Sand Screens
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API 17Q Proposed Technical Changes to Rev 0
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
API 17Q – Subsea Equipment Qualification
API S64 Summer Conference Update.
Task Force on Seasonal Adjustment of Quarterly National Accounts Item 3.1 Recommendations 2002: Implementation and items for review in 2007 Henning.
Status Update on API 16Q / 16R / 16F
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
Draft Recommendation Overview
First 8 slides are what was presented in San Fransisco…
API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.
API SC-16 task group for Specification 16D
API 17P TASK GROUP January, 2015.
Standards Break Out Session
API Summer Standardization Conference
Don Wells Hess Corporation
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
Adaptive Product Development Process Framework
API RP 59 June 2017 Recommended Practice for Well Control Operations
API Standard 53 Update June 2017
2016 Exploration & Production Summer Standards Conference
Overall Project RAG Status:
API 10 F.
API 17H ROV/ROT Interfaces
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
API 17H TASK GROUP January, 2015.
Singular Selection of Format
API Specification 6A Keel Block Requirements New Item
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API RP 16AS January 2019 Standard for BOP Systems
API 16RCD January 2019 Specification for Rotating Control Devices
Presentation transcript:

API RP 17Q Status January, 2014 First Edition issued June 18, 2010 Action from the 2013 summer meeting was to work with the 17N Task Group to incorporate a blank Product Qualification Sheet (PQS) into the 17N document (likely as an informative item in the Appendix on Technology Readiness and Qualification) Recommendation from the 17N Task Group is to move those sections on Technology Readiness and Qualification into a completely reformulated 17Q document, primarily because those sections are not integral parts of Risk and Integrity Management (the primary focus of 17N), but also because updates of the documents will likely happen at different paces relative to each other. Need to work with 17N to agree on the general philosophy of reformulating 17Q into an RP on Subsea Equipment Technology Readiness and Qualification, and agree on how this will be completed organizationally and to what schedule. Complete the Standards Resource and Research Request (SRRR) form for this activity, obtain SC17 and CSOEM approvals, and commence the work.