I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces As of:1 EP-3 Recovery Mr. Ross Higa HQ PACAF/CECI.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
What is a Christian? What is a disciple?
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
Getting there in comfort
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Create an Application Title 1A - Adult Chapter 3.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Site Safety Plans PFN ME 35B.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Module 2: General Working Conditions 2.1 Housekeeping & Slips, Trips, & Falls Susan Harwood Grant Number SH F-23.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
1. 2 Earthquake effects on health care facilities 2.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1 Section 5.5 Dividing Polynomials Copyright © 2013, 2009, 2006 Pearson Education, Inc. 1.
Sample Service Screenshots Enterprise Cloud Service 11.3.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH F-23.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Signs, Signals, and Pavement Markings
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
1 DRAFT EB / EE / ES / HB / PP1 MAINTENANCE (RADIATION SHIELDING & TOOLING FOR INSTALLATION) A.SURKOV University of Wisconsin CERN
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces As of:1 EP-3 Recovery Mr. Ross Higa HQ PACAF/CECI

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:2 Background CE Mission: Document pavement degradation from AN-124 traffic US responsible for pavement damage Chinese tried, but could not run up the bill Airfield designed for fighter aircraft Narrow taxiways, small aprons Limited pavement bearing strength AN-124 has higher damage potential than C-5 Five AN-124 flights (first and last were heaviest) Cargo weight and fuel strictly controlled to avoid damage First AN-124 arrived 16 Jun 01 to start recovery operations - completed 3 Jul 01

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:3 Logistics and Security Lodged at Gloria Resort Hotel in Sanya U.S. manager assisted in logistical support One hour bus ride to/from Lingshui Air Base Left hotel 0630, returned 1830 Operations kept low key Minimal news coverage Photographers and reporters kept away from hotel and base Police stationed along route to Lingshui Exception: Numerous guests/photographers on base during fuselage loading

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:4 Lingshui (Naval) Air Base, Hainan Island, People's Republic of China EP-3

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:5 EP-3 and AN-124

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:6 Crew members guided the AN-124 on narrow taxiways and through tight turns

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:7 Kneeling AN Load bearing points on the pavement were closely monitored

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:8 The airfield already had existing defects

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:9 Working Conditions Lockheed Martin was well prepared Chartered Gulfstream IV on standby at Sanya Airport for evacuation Physician on team - local hospitals inadequate Temperatures reached 107 deg F with high humidity Heat stress encountered early on Administered medication as needed Daily safety meetings - no injuries incurred Local contracts for work trailers, water, transportation, meals, toilets, generator, etc. Cell phones with international capability

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:10 People's Liberation Army PLA Navy monitored operations closely Continuous photography and video taping of work and people U.S. workers restricted from crossing rope barriers Routine review of photos and video taken by U.S. End of day meetings held to recap day's events and resolve issues Key project officers from Beijing; not Lingshui Non-threatening, but many "home turf" rules

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:11

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:12

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:13 Three jack stands supported the aircraft during underside disassembly work

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:14 Blowers vented residual fuel before cutting operations could begin

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:15 A safety line was installed for topside work

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:16 Flaps, ailerons and leading edges were salvaged

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:17 Tail section was cut off the fuselage

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:18 Key components were salvaged

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:19 Four engines were removed in one day

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:20

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:21 Gas powered saws were used to cut and remove the wings in sections

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:22 Scrapped parts were also taken to Kadena on the AN-124

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:23 Main and nose gears were removed when rain halted wing cutting operations

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:24 A specially made trailer was jacked up to support the aircraft

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:25 EP-3 rested solely on the raised trailer after the jack stands were removed

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:26 Interior pipes and cables were pre-cut to facilitate removal of wing sections

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:27 Nacelles were salvaged

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:28 The AN-124 was "cubed out" on almost every return flight

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:29 You Call – We Haul Lockheed and Russian crews "busted butts" to load same-day turnaround flights

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:30 Bridge cranes were used to load from the rear

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:31 A centerline marker was laid out to help align the AN-124 to the EP-3

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:32 The AN-124 hit the mark perfectly

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:33 The AN-124 used portable extension ramps to reduce the incline

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:34 Steel cables from the cargo bay were attached to the trailer

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:35 Winches pulled the fuselage into the cargo bay

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:36 The wide wheels and narrow ramps left no room for error

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:37 The fuselage and trailer cleared by a few inches

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:38

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:39

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:40 The portable ramps were disassembled and loaded onto the AN-124

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:41 The Russian crew

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:42 After a refueling stop in the Philippines and crew rest in Hawaii, the fuselage was welcomed home at Dobbins ARB, GA (home of Lockheed Martin Aeronautical Systems Co.)

I n t e g r i t y - S e r v i c e - E x c e l l e n c e As of:43 Additional Information Additional Information and photos can be found on the PACOM website at: