O utstanding Airport C onstruction C onstruction A wards 2012 Airport Awards.

Slides:



Advertisements
Similar presentations
Part 139 Training 1.
Advertisements

1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 116.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 107.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 40.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 28.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 44.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 29.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 58.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 75.
SILVER COMET FIELD AT PAULDING NORTHWEST ATLANTA AIRPORT FIVE YEAR CAPITAL IMPROVEMENT PROGRAM.
Multiple Award Construction (4 contracts) 1/5/11-1/5/16 $75M Cum (Contractors: Grimberg; NICC JV. Inc; Meltech; Biscayne) Protective Services Division.
T123 APRON MANAGEMENT SERVICE Madrid-Barajas Airport Date of entry into service: 31st of May, 2012 Transfer Points between will be signed with intermediate.
ACRP 07-09: Apron Planning and Design Guidebook
Regional Planning Meetings 2005 Oklahoma Airport System Plan Presented by: Dr. George Dresser, System Planner.
KILLEEN-FORT HOOD REGIONAL AIRPORT
Airport considerations and airport solutions Session 5 Presentation 3.
Airfield Lighting Designs Salt Lake City International Airport
DANVILLE CITY COUNCIL WORK SESSION AUGUST 3,
Cormac Engineering Zambia Limited The Finance and Construction of 12 Airports For The Republic of Zambia Presented by Steve Pearson Programme Director.
Laredo Fire Department
15. Oktober Oktober Oktober 2012.
1 Unit 1 Kinematics Chapter 1 Day
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
O utstanding H ighway C onstruction C onstruction A wards 2012.
Association of California Airports September 20, 2007.
Veracruz Site Visit 30 Nov-1 Dec 2005 Photos by Mike Gaunce & Phil Russell.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Pavement Markings Quiz Q. 1 & 2. Pavement Markings Quiz Q. 3.
PAVEMENT REPAIR METHODS
Runway & Taxiway Markings
Millinocket Municipal Airport November 5, 2014 Meeting.
Basic Principles of Airmanship Airfields. Objectives Understand Airfield Layouts Know how runways are numbered Know how runways & taxiways are marked.
SMS and Safety Risk Management in Airport Planning and Development Presented by Rusty Chapman, P.E. Delta Airport Consultants, Inc. March 3, 2011.
AIRPORT A complex of runways and buildings for the
Talofa!! from American Samoa. American Samoa.
Office of Aviation Safety Delta Connection Flight 6448 Operated by Shuttle America Airport Issues.
International Airport. LOCATION: On Jamaica Bay in the southeastern section of Queens County, New York City. The airport is located 15 miles by highway.
Valkaria Airport Master Plan Update Public Information Meeting February 25, 2015 Viera Government Center.
Federal Aviation Administration FAA Presentation to Prospective Bidders Chicago Midway International Airport July 30, Airports Division Great Lakes.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
MICRONESIA AIP PROJECT STATUS UPDATE
Pacific Aviation Directors Workshop March 13 – 15, 2012 Hosted by: A B Won Pat International Airport - Guam F ederal A viation A dministration DEPARTMENT.
Georgia Air Quality and Climate Summit Thomas Nissalke, Ph.D. Director of Environmental and Technical Services City of Atlanta Department of Aviation May.
ASTM E17 Committee Mini-Seminar Dec. 5, 2006 Federal Aviation Administration 1 FAA PERSPECTIVE Airfield Pavement Roughness Presentation to: ASTM E17 Committee.
2010 FAA Worldwide Airport Technology Conference Chicago Department of Aviation April 20, 2010.
Presented to: By: Date: Federal Aviation Administration AIRPORT IMPROVEMENT PROGRAM International Right of Way Assoc. Tom Felix, Manager Planning & Programming.
CVFD Training – Transportation Emergencies SFFMA Training Objectives: –
Case Study – Bellefontaine Regional Airport. Why Build a New Airport?  Existing airport was inadequate for the demands of the community and could not.
Quality in Construction Presentation of the 2014 Asphalt Paving Awards 1.
Airfield Markings The Contractor/Pilot Perspective.
Airport Groundside Panel Madrid May 2002 AVIATION OPERATIONAL MEASURES FOR FUEL AND EMISSIONS REDUCTION WORKSHOP Aviation Operational Measures for.
Conestoga Valley High School Aviation Technology Airports The Lancaster Airport, located on Manheim Pike, was first opened in 1935 and is Lancaster’s only.
Griffin-Spalding County Airport LPA Group Project Update Presented to September 28, 2009.
Presented to: By: Date: Federal Aviation Administration Runway Safety Airport Operations & Collision Avoidance Pacific Aviation Directors Work Shop Chris.
Yakima Air Terminal.  Project Overview  Project Schedule  Impacts  Project Status  Questions.
Airport Pavements Lexington, KY.
© 2010, Mike Murach & Associates, Inc.
Corporate Advisory Committee
© 2010, Mike Murach & Associates, Inc.
© 2010, Mike Murach & Associates, Inc.
© 2010, Mike Murach & Associates, Inc.
© 2010, Mike Murach & Associates, Inc.
© 2010, Mike Murach & Associates, Inc.
NAVIGATING THE NEPA PROCESS Prepared by: Janet Flynn, PennDOT’s Bureau of Aviation Sue McDonald, Federal Aviation Administration September 18, 2018.
© 2010, Mike Murach & Associates, Inc.
© 2010, Mike Murach & Associates, Inc.
Presentation transcript:

O utstanding Airport C onstruction C onstruction A wards 2012 Airport Awards

Airport Category 4 Projects Nominated 4 Projects Nominated

Steve Conway Municipal Airport Crandon - WI AIP-07 Airfield Pavement Reconstruction Contractor: Pitlik & Wick Inc. Resident Engineer: Bret Dahl - BOA Project Manager: Matt Malicki

Airport Steve Conway Municipal – Crandon WI

Prairie Du Chien Municipal Airport AIP-09 Reconstruct Runway 11-29, taxiways widening Contractor: Iverson Construction Resident Engineer: Jason Marks – BOA Project Manager: Mike Gabor

Airport Prairie du Chien Municipal Airport

Rice Lake Regional Airport Rice Lake - WI AIP-14 Construct & Widen Aircraft Parking Ramp Contractor: McCabe Construction Resident Engineer: Brad Volker – Cooper Engs BOA Project Manager: Dave Montesinos

Airport Rice Lake Regional – Rice Lake

Platteville Municipal Airport Platteville - WI AIP-08 Reconstruct runway & Taxiways Contractor: Iverson Construction Resident Engineer: Ryan Franzini, BOA Project Manager: Stacy Miler

Airport Platteville Municipal Airport – Platteville WI

2012 Outstanding Airport Construction Award Winner General Aviation Category 2012 Award

Steve Conway Municipal Airport Crandon - WI AIP-07 Airfield Pavement Reconstruction Contractor: Pitlik & Wick Inc. Resident Engineer: Bret Dahl - BOA Project Manager: Matt Malicki

Award Winning Airport Crandon, WI

Award Winning Airport Crandon, WI

Award Winning Airport Crandon, WI

Award Winning Airport Crandon, WI

Award Winning Airport Crandon, WI

Award Winning Airport Crandon, WI