GISC Brasilia Status Doc 30

Slides:



Advertisements
Similar presentations
Given Connections Solution
Advertisements

National Institute of Meteorology and Hydrology BAS WIS Implementation in DCPC- SOFIA National Institute of Meteorology and Hydrology BAS.
CMA’s new GTS system Submitted by YANG Genlu, China
© Crown copyright Met Office Joint ICT GTS-WIS MTN and ET-GTS WIS OI Chris Little, The Met Office September 2008 Geneva, Switzerland.
© Crown copyright Met Office APSDEU / NAEDEX 2012 Chris Little, Met Office October 2012 Exeter, UK.
NOAA’s NWS Telecommunication Gateway RTH Washington Fred Branski Office of the Chief Information Officer NOAA’s National Weather Service 20 th NamEurDEx.
STATUS OF RTH MOSCOW (Submitted by Expert (Russian Federation)) ________________________________________________________________ Summary and Purpose of.
1 Towards Full GISC Compliance for IMD in
RTH Moscow 1 STATUS OF RTH MOSCOW (Submitted by Expert Russian Federation) ________________________________________________________________ Summary and.
GISC Brasilia status report Doc25 (AI 2)
GISC Washington Status Doc 21r1
(CBS/OPAG-ISS ) November 2007 Washington, USA
Status of GISC Tokyo GISC Tokyo / JMA.
TT-GISC – Brasilia – October 2015 Rémy Giraud (Météo-France)
GISC Exeter Status Report
Météo France GISC and DCPCs
GISC Seoul Status TT-GISC, Melbourne April 2016
Status report of GISC Beijing
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
GISC Status WIS Portal based on a commercial solution
Requirement for Full Global Operation on WIS Survey on the WIS Doc
Status Report of GISC Beijing
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
RTH Exeter Status Report
WIS data-communication structure Outcome of study by ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) Please consider our Earth.
GISC Beijing Status Report Doc25
RTH Prague Czech Hydrometeorological Institute Ladislav Keller
Markus Heene, DWD Status GISC Offenbach Markus Heene, DWD
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
Expert Team on WIS Centres Task Team on GISCs
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
Status Report of GISC Tokyo
WIS overview Submitted by: Secretariat (Doc 02b)
Status of the WMO WIS Implementation at NOAA/NWS October 2015
Current State and Termination Issues of Frame Relay Services
TT-GISC-2016 Doc 15 Agenda Item 2
GISC Washington Status Submitted by: Robert BUNGE (USA) (Doc 20)
GISC-CASABLANCA STATUS
GISC Moscow status report Submitted by: Sergey BELOV (Russia) (Doc 17)
(Submitted by José Mauro de Rezende)
GISC xxxx Status Report Submitted by: xxx XXX (Country) (Doc xx)
Applicant Tracking/Hiring Management System
Toulouse GISC Status TT-GISC.
Toulouse GISC Status Doc 29
Status Report of RTH Tokyo
every Board meeting: how are measures?
Operational Status of GIS Offenbach
GISC MOSCOW STATUS REPORT 2018
GISC Tokyo Status (Short update) Doc 23
Status of RA II WIS Implementation Plan
GISC Washington status Kari Sheets Agenda item
Status Reprot GISC SEOUL
Status Report GISC Tehran
Report from Task Team on GISC (TT-GISC)
Status report of GISC CASABLANCA
GISC Offenbach – Status Report 02/2014 (Doc 19)
TT-GISC report CBS-16 period.
420, , , ,000 1,300,000 One commercial 680, , ,000 1,200,000 1,800,000 Two commercial 680,000.
GISC Offenbach Kai Wirt Task Team GISC TT-GISC2018
Status report of GISC Beijing
GISC Exeter Status Report
GISC Washington Kari Sheets Task Team GISC TT-GISC2018
GISC Status Report GISC Pretoria
420, , , ,000 1,300,000 One commercial 680, , ,000 1,200,000 1,800,000 Two commercial 680,000.
GISC – GISC mutual backup Backup Status Remarks
GISC New Delhi Status Dr. S. L. Singh
GISC Exeter Status Report
RTH Exeter Status Report – 2014 (Doc 22)
GISC Beijing Status Report
GISC Exeter Status Report
Presentation transcript:

GISC Brasilia Status Doc 30 José Mauro de Rezende

GISC Status WIS Portal based on a commercial solution Configured as a cluster. Data exchange from RTH Message Switching System Not connected to the RMDCN yet Bilateral agreement with MeteoFrance and DWD to exchange data over the Internet Started conversation with RTH Exeter to establish an Internet connection too.

Capacity Building Internal Training Operator GISC training in 2012 Software training in 2012

GISC Backup Natural Candidate: GISC Washington (Two other GISCs have expressed interest in being backup too)

Main obstacles for full operation Lack of human resources (difficulties finding qualified staff or hire new people) RMDCN connection