Green belt development for better CPI: Battambang, Cambodia

Slides:



Advertisements
Similar presentations
ADB & its Strategy in Bangladesh: Md Shamsuddoha Equity and Justice Working Group EQUITYBD.
Advertisements

Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
Bic river basin management plan and involvement of local authorities in the implementation of the program of measures Dumitru Drumea, Executive Director,
Towards the Romania of PRINCIPLES OF PROGRAMMING The social and macroeconomic policy of Europe is the policy of Romania EU projects represent a.
LOCAL GOVERNMENTS AS AGENTS OF CHANGE John Day Center for Environmental Farming Systems, NC State University.
1 MINISTRY OF REGIONAL DEVELOPMENT AND PUBLIC WORKS DIRECTORATE GENERAL PROGRAMMING OF REGIONAL DEVELOPMENT Operational Programme Regional Development.
Lecture(2) Instructor : Dr. Abed Al-Majed Nassar
Public transport framework plan for Buffalo City July, BUFFALO CITY MUNICIPALITY PUBLIC TRANSPORT FRAMEWORK PLAN PRESENTATION August 2008.
Training on Roads for Water and Resilience. ROAD FOR WATER PLANNING – GOVERNANCE BERHE FISEHA, TIGRAY BUREAU OF CONSTRUCTION ROAD AND TRANSPORT AND KEBEDE.
Tourism Planning Lecture 3.
Global Action Plan and its implementation in other regions Meeting for Discussion of the draft Plan for the Implementation of the Global Strategy to Improve.
SWITCH Training Kit: Module 1 – Preparing for the Future Module 1: Preparing for the Future SWITCH Training Kit Module 1: Preparing for the Future Strategic.
KINGDOM OF CAMBODIA NATIONAL - RELATION - KING COUNTRY REPORT OF CAMBODIA THE INTERNATIONAL TRAINNING COURSE ON REGIONAL DEVELOPMENT STRATERGY JULY 17,2005.
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
1 Transportation Infrastructure Programs Past, Present & Future Transportation Association of Canada Fall Conference September 2011 Edmonton, Alberta.
New Town Development and Urban Renewal
1 LIFE+ COUNCIL WORKING GROUP 4 OCTOBER Discussion Points 1. LIFE+ in Context: Environment funding under the Financial Perspectives.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
Seoul, Republic of Korea
Current Situation and Problems Concerning of Regional and Rural Development of Nuwakot District of Nepal By Narahari Baral Local Development Officer District.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
Stakeholders Meeting in Addis Ababa October 26, 2012 SSATP Progress Report Urban Transport – Mobility & Accessibility Cluster.
Knowledge Share Fair Cameroon IFAD-CBARDP NIGERIA By Bukar Tijani National Programme Coordinator KNOWLEDGE SHARING ON SUCCESSES AND LESSONS LEARNED.
Sustainable Cities through Environmental Compliance and Enforcement Kenneth Markowitz 19 October 2015.
AU/UNIDO/Brazil High-Level Seminar on Biofuel.  Policies are required to reflect the country’s development vision for the sector  Required to establish.
MEKONG RIVER COMMISSION PROGRAMMES FOR SUSTAINABLE DEVELOPMENT.
1 Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program Overview: The Greater Mekong Subregion (GMS) Economic Cooperation Program.
India Development Strategy (FY2012–FY2016) ADB India’s Country Partnership Strategy (2013 – 2017) ADB’s Long-Term Strategic Framework (Strategy 2020)
A Presentation to the Kenya Water Towers, Forests and Green Economy National Dialogue; By: Eng. Philip J. Olum CEO- Water Resources Management Authority.
1 CAMBODIA COUNTRY PRESENTATION Workshop for Capacity Building for Monitoring and Evaluation of Education Development Plans November 2003, Thailand.
Social Value: The Social Value in Health and Care programme in Salford.
Sustainable Humanitarian Relief
Climate Change Elements of the SADC Regional Agricultural Policy (RAP)
LOW CARBON TOWN-INDICATOR (LCT-I) BITUNG CITY, NORTH SULAWESI, INDONESIA NOLDY TUERAH CEO, BOARD OF INTEGRATED ECONOMIC DEVELOPMENT ZONE (IEDZ) MANADO-BITUNG.
MAINSTREAMING OF WOMEN, CHILDREN AND PEOPLE WITH DISABILITIES’ CONSIDERATIONS IN RELATION TO THE ENERGY SECTOR Presentation to the Joint Meeting of the.
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Under 4.7 Habitat of the MTDS, Working Group 2 deals with:
The Islamic University of Gaza- Higher Studies Deanery
Overview Rationale Context and Linkages Objectives Commitments
One Belt One Road Summit 2017
Private sector development and SDGs in Albania
Launch of Towards 2020 GWP Strategy.
National Environment Policy Presentation
Concepts in Water Resources Management
The EU WATER POLICY.
Overview of Bank Water Sector Activities
Long term strategy and structure
Integrated Bilateral Agreement (IBA) 2018 to 2028
GCF business model.
Overview Rationale Context and Linkages Objectives Commitments
IMPLEMENTATION OF ARTICLE 9
Climate Change Elements of the SADC Regional Agricultural Policy (RAP)
Policy and Regulatory framework Review for slum upgrading
Template and Process for Expression of Interest by Countries
LIFE and the implementation of the Water Framework Directive
Rural Partnerships between Small Farmers and Private Sector
POVERTY ALLEVIATION INTERVENTIONS
Thematic Discussion on Green Cities
Presentation by: Ajay Kumar KC
Director-General: Mr. E Africa
ACTION PLANNING FOR CITIES CASE STUDY ULAANBAATAR CITY
Presentation by: Ajay Kumar KC Research Associate NDRI Lalitpur, Nepal
The Small Communities Environmental Infrastructure Group of Ohio
Improve Street Connectivity for Tam Ky City
Cambodia: Profile of Battambang Municipality (on-going for CPI)
‘Regional Policy contributing to Sustainable Growth in EU 2020’
Air pollution reduction program in the Ulaanbaatar city’s Ger area
Global Platform for Sustainable Cities - Resource Team (RT) -
National one Health Strategy( )
Presentation transcript:

Green belt development for better CPI: Battambang, Cambodia International Training Course 2015 Urban Policies and Planning Strategies for Achieving Prosperity in Cities 3-17 July 2015, Republic of Korea ByThuon Try Department of NRM-D, Faculty of Development Studies Royal University of Phnom, Cambodia Organized by International Urban Training Center (IUTC)&UN Habitat

INTRODUCTION TO Battambang

Location Battambang municipality is the central and provincial town of Battambang Province.

Location The town covers an area of 11,544 ha. Cultivated areas with 8557.5 ha, construction land areas (ha) with 2,869.7 and other land with 116.6 ha.

Demography Population by 2010 Shows 142,878 (female: 68,824) No Sangkat Total Land (km2) Population Density/sq/km 1 Tuol Ta Ek 3.77 16,182 4,288 2 Preaek Preah Sdach 2.9 12,779 4,407 3 Rottanak 6.79 13,877 2,044 4 Chamkar Samraong 9.18 16,075 1,751 5 Sla Kaet 7.47 6,713 899 6 Kdol Doun Teav 9.06 9,389 1,037 7 Ou Mal 37.74 10,398 276 8 Vaot Kor 24.94 18,232 731 9 Ou Char 11.17 21,475 1,921 10 Svay Pao 2.42 17,758 7,304 Total:   573 142,878

Population projection to 2020

Result of the CPI (graphs)

Result of the CPI (graphs), identify problem areas is need for current decentralisation reform. Productivity: Economic strength below 50%, employment: 19% Infrastructure: ICT is not well performed due to recent integration, while road connectivity is well performed but will need to expense more due to urbanisation expansion. Quality of life is overall good performance, but public health services need to be improved Equity and social inclusion: high performance for gender and economic equity, but poor social inclusion (30%). Environmental sustainability: Good air quality and wasted management, but poor performance of renewable energy. Governance and political support: Overall is good, but tax collection is low with 20%. This means more power and functional delegation.

Scenarios of the CPI CPI Last Year Scenario 1 Scenario 2 Productivity   CPI Last Year Scenario 1 Scenario 2 Productivity 28.75 54.35 59.41 Infrastructure Development 49.10 57.20 68.09 Quality of Life 75.56 78.77 84.02 Equity and Social Inclusion 54.85 53.45 59.45 Environmental Sustainability 49.82 66.48 84.74 Urban Governance and Legislation 53.28 55.83 88.24 City Prosperity Index 49.95 60.41 72.98

Problem identification & periodization Infrastructure and productivity Battambang in recent years has reactivated its strategy to take advantage of its location to become an economic and trading center. Infrastructure plays an important role for economic activities and human interaction, social inclusion which includes: National road No.5 connecting municipality to other provinces, Phnom Penh and Thailand. National road No.57 connecting No.5 and other urban areas. National railway: connecting from Phnom Penh to other parts of the country and borders. Battambang air port is situated close to the urban center but not working since 2003. Key priority infrastructure to be selected is the canals surrounded the city which serves as greenbelt of the city.

SWOT analysis (optional) ASPECT PRELIMINARY ASSESSMENT   Strength Priority of the provincial authority and municipality Political support from national government Key production areas of agriculture and road connectivity to other districts. Weaknesses Local community participation and contribution Inter-institutional coordination with national and subnational level Technical and financial capacity of municipality officials. Opportunity Green belt development for city for both domestic and foreign tourists (connecting from Ek Phnom to Banan temple without going inside the town). Flood control and waste water treatment areas before releasing for agricultural purposes. Fresh water available for domestic use, agriculture production, livestock raising, tree plantation along the canals parallel with roads, to facilitate traffic congestion from the town as well as the increase the volume of transportation for agricultural products. Threats Resettlement and compensation for affected people Land use planning and development controlling

Objective Setting - Goal Setting To renovate Seima canal system in order to facilitate economic productivity and infrastructure connectivity of the city.

The canal system The canal extends across six Sangkat and two national roads (No.5 and No.57). This canal is an important backbone drainage and flood management facility for the town. The core group has envisioned that this canal would become a green belt surrounding the town with multiple community and economic uses. There is also a need to construct wastewater treatment facilities at the lower end of the canal before releasing water into agricultural zones and also to regulate illegal migrant resettlement along the canal system.

Strategy To develop green belt of city by renovating multi-purpose canal system for fresh water available for domestic use : agriculture production, livestock raising, tree plantation along the canals parallel with roads To facilitate traffic congestion from the town as well as the increase the volume of transportation for agricultural products.

Strategic Actions and Activities Enlarge main canals and road side with 20 meter with 6.5m road both side and 7 meter of main canal. The whole canal will serve as green belt of city, connecting Ek Phnom to Banan temple. Canal – constructed wetlands along canal Establishing new waste water treatment areas at Kray Poan Tree plantation along the canals parallel with roads Recreation and tourism green walkway along canal Establish constructed wetlands and appropriate locations

Canal – constructed wetlands along canal Currently, many pond serve as wetland to retain flood and purify waste water that need to be expanded.

Strategic Actions and Activities Institutional and Capacity Development Regulate illegal resettlements on the canal system Establish Farmer Water User Community (FWUC) Capacity building to member of technical core group Building development controls and safeguards for canal zone

Potential key source of funding Government through local development (3000 meter long) Irrigation service fee from farmer water user group, domestic water supply, recreation. External fund needed with an estimation of $10 million (both grant and loan).

Stakeholder and mechanism Established technical working group with key experts form different department in order to evaluate bidding, to provide ideas, to monitor and follow up the construction process. Establish water user community to maintain the canal system with cooperation with technical working whose representative from different provincial department. Need political support from local authority and technical and financial from development partners and stakeholders. Need to have regular capacity building to member of technical working group and local community to ensure the effectiveness of the adaptation action implementation. Need public private partnership cooperation.

Thanks You!