High Level System Solution Impact Assessment

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
UK Link Programme Dashboard Report Change Overview Board: 13/05/2014 Critical HLD activities complete enabling entry into Detailed Design Detailed Design.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
COR2789 – Measures to Address Unregistered and Shipperless Sites Implementation of MOD424, MOD410a & G
UNC Modification Proposal 0202 National Grid Distribution
Functional Change through RGMA Review Ph2
xrn4361 UK Link Future Release 2
XRN4361 – UK Link Release 2 Data Migration Plan for XRN /03/18
Market Trials ChMC 8th August 2018.
DSC Change Committee Summary – 12th December
Agenda Action Review Update on IX and iGT access Testing strategy
DSC Change Committee Summary – 13th June
Change Management Committee – June 2019 Update
DSC Change Committee Summary – 7th November
R&N Timeline Release 2 Release 3 Feb-19 June-19
Project Nexus Workgroup
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Project Nexus Workgroup
DSC Change Budget 17th October 2018
RAASP – Solution Options Scenario Comparison
DSC Change Committee Summary – 12th September
DSC Change Committee Summary – 11th July
Impacts of Project Nexus Implementation Date to AQ17
DSC Change Committee Summary – 10th October
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
Release 2 Scope Business Benefit Review
Ofgem Switching Programme: Central Switching Service consequential change update 9th May 2018.
Industry Shipperless & Unregistered Working Group
Project Nexus Workgroup
June 2019 Release Scope DSC Change Management Committee
DSC Change Committee Summary – 13th March ‘19
Release 3 Scope Selection and Plans
XRN4249 – Part B Data Migration Plan
UK Link Replacement Programme additional supporting UNC modifications
Ofgem Switching Programme: Central Switching Service consequential update 16th May 2018.
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
Deferral of Retrospective Updates Functionality
Joint Theft Reporting Review (from meeting 1st March 2019)
Data Office POAP April/May 2019
Retail & Networks ChMC Update
Overall Project RAG Status:
Data Office – Portfolio of work
UIG Task Force Progress Report
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
Customer Issue Management CoMC Update
DSC Change Committee Update
High Level System Solution Impact Assessment
XRN4692 – CSEPs: IGT and GT File Formats (CIN Files)
High Level System Solution Impact Assessment
DSC Change Committee Update
Customer Issue Management CoMC Update for April & May 2019
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
DSC Delivery Sub-Group
Customer Issue Management CoMC Update for June 2019
Enabling Large Scale Utilisation of Class 3
Data Office POAP July/August 2019
UK Link Change Impacts and Release Update
Customer Issue Management Dashboard CoMC - July 2019
Xoserve Draft UIG Incentives Modifications 20 May 2019
Change Management Committee
Change Management Committee
DSC Change Committee Update
XRN Enabling large scale utilisation of Class 3 – MOD0700
Change Management Committee Sections 2 - 6
Customer Issue Management Dashboard CoMC
Customer Issue Management Dashboard CoMC
Presentation transcript:

High Level System Solution Impact Assessment XRN4941 - Modification 0692 - Auto Updates to Meter Read Frequency High Level System Solution Impact Assessment

Change Overview XRN4941 - Modification 0692 - Auto Updates to Meter Read Frequency This change has been raised in line with the ongoing development of MOD0692 which looks to grant the CDSP permission to update a Supply Meter Point’s (SMP) Meter Read Frequency (MRF) under the following circumstances:   Where a SMP AQ increases past the threshold of 293,000KWh and site is not on a monthly meter read frequency, the MRF should be set to Monthly 2) Site has either a Smart or AMR meter installed and is not on a monthly meter read frequency, the MRF should be set to Monthly XRN is in development alongside Modification 0692, any fundamental changes to this Mod could amend the scope of this change and effect delivery timescales. Solution Options 1 Amend the Meter Read Frequency as part of a successful Rolling AQ calculation (Monthly or Correction) and Asset Updates.

Option 1 - High Level Impact Assessment 1 - Amend Meter Read Frequency as part of a successful Rolling AQ calc (Monthly/Correction) and Asset Updates As part of this change, the Meter Read Frequency will be updated as part of AQ Updates above 293,000 kWh. Below are the list of changes: Rolling AQ and AQ Correction needs to be updated to provide a trigger whenever there the AQ goes above the threshold value of 732,000 kWh. New report needs to be developed to update the Meter Read Frequency for AQ and asset updates. AQ updates can be checked from the trigger and asset changes will be scanned from the system. The updates will be done post AQ and Asset Live date. New Report needs to be developed for the cutover in order to align all the Meter Read Frequency for the entire UK Link portfolio. MRF updates via SPA process will take precedence over the data cleansing activity during cutover. Impacted Systems Assumptions Market Trials costs are not considered. Performance Testing will be required. Only Class 4 sites are in scope. Shippers will be notified on M-7 via NRL for the AQ change where MRF needs an update. Shippers will be notified with RGMA flow responses for the asset updates. Sites which have a decrease in AQ from 293,000 kWh remain As Is. Meter Read Estimation will not be done. New Report to update the MRF needs to be aligned with Capacity/Commodity runs(in terms of batch timings). Impact Gemini Marketflow SAP PO SAP ISU CMS API SAP BW DES Overall Impact Release Type High Level Cost Estimate Medium Major 20,000 - 30,000 GBP

Option 1 - System Impact Assessment Reports Interface Conversion Enhancements Forms Workflow Data Migration System Component: SAP ISU Impacted Process Areas: RGMA SPA/AQ Complexity Level (per RICEFW item): Low Medium Change Description: New report to update the MRF for the AQ and asset Updates New report to be developed for data cleansing during cutover Trigger to be created from below processes. Rolling AQ AQ Correction ISU BW PO / Marketflow DES CMS AMT API Test Data Prep Complexity: Unit and Sys Test Complexity: Pen Test Impact: No Regression Testing Coverage: Performance Test Impact: Yes Market Trials: UAT Complexity:

Option 1 - Process Impact Assessment Process Area Complexity File Formats Exceptions External Screens Batch Jobs Performance Test? SPA Med No Metering (Reads) n/a Reconciliation Invoicing – Capacity Invoicing – Commodity Invoicing – Amendment Invoicing – Other Rolling AQ Yes Formula Year AQ RGMA DSC Service Other (Specify)