Compliance & Enforcement Updates Abdullah Alrasheed Compliance & Enforcement Dept.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

SARQA/DKG Conference 3-4 October SARQA/DKG Conference 3-4 OCTOBER 2002 Annex 13 Update An Industry Perspective Michael J Cooke Director, Global.
Pharmacology and the Nursing Process in LPN Practice
Medical devices: Application of risk management to medical devices
1 Balloting/Handling Negative Votes September 22 nd and 24 th, 2009 ASTM Virtual Training Session Christine DeJong Joe Koury.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
RECORD KEEPING Cooperative Development of Operational
for Cabin Safety Inspectors
WHO Good Distribution Practices for Pharmaceutical Products
HIV Drug Resistance Training
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
GOALS FOR TODAY Understand how to write a HACCP Plan
606 CMR 14.00: Background Record Checks What you need to know!
Modern Systems Analyst and as a Project Manager
Introduction to Auditing
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Configuration management
EMS Checklist (ISO model)
Text 1 July, 2010 DCMS: Training Manual Campaign Management.
Effectively applying ISO9001:2000 clauses 6 and 7.
Biopharmaceutical Quality
Hazardous Waste Section
Checking & Corrective Action
Module 14: Blood Collection and Handling Dried Blood Spot
There are three types of emergencies:  Internal  External  Natural disasters.
NIMS Resource Management IS-700.A – January 2009 Visual 5.1 NIMS Resource Management Unit 5.
Functional Areas & Positions
© Paradigm Publishing Inc Chapter 10 Information Systems.
Internal Control and Control Risk
Quality Auditing Dr Alan G Rowley
Accounting Information Systems 8e
Medsafe – GMP update / release for supply / communicating quality issues Derek Fitzgerald Manager, Compliance Management 11 July 2013 RACI Pharmaceutical.
1 1 Chapter 1 Specimen Management Professor A. S. Alhomida Disclaimer The texts, tables and images contained in this course presentation (BCH 376) are.
Contractor Safety Management
BRC Storage & Distribution Safety and Quality Management System Training Guide
Quality Management System
4. Quality Management System (QMS)
4. Quality Management System (QMS)
Huzairy Hassan School of Bioprocess Engineering UniMAP.
World Health Organization
Regulatory Overview.
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency 1 Module 13 GMP Workshop.
Good Hygiene Practices Module 2, Module 11 Recall and Traceability.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Lecture #9 Project Quality Management Quality Processes- Quality Assurance and Quality Control Ghazala Amin.
Incident Reports and field Safety Corrective Action ( FSCA) Eng. Essam M. Al-Mohandis Executive Director of Surveillance and Biometrics.
Cavendish Scott, Inc. 1 Regulatory and Statutory Compliance: It’s Everybody’s Business! Diana Lough Cavendish Scott, Inc.
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
1 Thank you for visiting our site and welcome to the “Introduction to ISO 22000” Presentation that you requested. For more information.
Dispensary and Administration Site Information Presentation.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part III.
The Second Annual Medical Device Regulatory, Reimbursement and Compliance Congress Presented by J. Glenn George Thursday, March 29, 2007 Day II – Track.
Internal Auditing ISO 9001:2015
Workshop on Accreditation of Bodies Certifying Medical Devices Kiev, November 2014.
Visit us at E mail: Tele:
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
THE OFFICE FOR REGISTRATION OF MEDICINAL PRODUCTS, MEDICAL DEVICES AND BIOCIDAL PRODUCTS Responsibility in the handling of medical devices.
November 6, 2013 Purchasing Controls & Supplier Quality Best Practices Beyond Compliance for the Medical Device Industry AdvaMed 2013 Bernie Liebler Technology.
ISO/IEC
How to Implement an IG Manufacturing Quality Procedure System
Introduction to SQF 2000 Certification
Regional Seminar for OIE National Focal Points on Animal Production Food Safety Importance of collaboration between the Veterinary Services and industry.
Good Laboratory Practices
Chemical Purchasing.
How to conduct Effective Stage-1 Audit
Good clinical practice
Presentation transcript:

Compliance & Enforcement Updates Abdullah Alrasheed Compliance & Enforcement Dept.

Contents Objectives Product value chain Requirements Counterfeit MD POEs 2

Objective Is to ensure that any medical device that has been authorized to be placed on the KSA market and is found, before it is put into service, to compromise the health or safety of patients, users or third parties, or does not comply with the relevant provisions of the Medical Devices Interim Regulation and its Implementing Rules, is either withdrawn from the market, or subject to appropriate corrective action to eradicate the non-compliance. Ensure establishments are in compliance with SFDA rules and regulations in order to ensure safety, effectiveness and quality of medical devices along with patient and user safety. 3

4 Medical Devices Life Cycle Conception and Design Manufacture Packaging Labelling Importing Sale Use Disposal Pre-market On-market Post-market

5 Development to Disposal Value Chain Design inputs leading to new concept or newer version Testing (inc. verification, validation, & clinical trials) Product is manufactured, packaged & labeled Product is shipped from its manufacturing site via land, air or sea to local warehouse Product is transferred from local warehouse to healthcare provider Marketing and sale Product is operated or used Product is removed after reaching end of its life cycle Description Stakeholders University Manufactur ers Hospitals Manufacture rs Importers Distributors Authorized Represent ative Manufacture rs Importers Distributors Authorized Representati ve Patients Healthcare Providers Patients Healthcare Providers Establishm ents. ApplicationDistributionImportManufacture Concept & Development Disposal

Inspection Enforce. 6 Approach

7 Total Number of Inspected Establishments * Up to Nov 23, 2011

Requirements Registration, Listing and Establishment Licensing : Establishment must has valid license issued by SFDA. All information of the establishment must be listed and updated at MDNR system ( company details, MDEL information and product list). Staff Qualification Establishments employees must be in a sufficient number, an adequate knowledge, qualification and have a documented training program. Traceability & Identification Establishment must have adequate traceability system supported by written procedures which include a general description of how the applicant will follow to trace individual medical devices through that part of the supply chain with which it is directly involved.

Requirements Medical device vigilance system & Control of nonconforming Establishment must have adequate written procedure for medical device Recalls, AE and incidents. Transportation, Handling & Delivery : Ensure that medical devices are properly packed, handled and stored for transportation as well as transported in a suitably vehicle, taking into account the manufacturers instructions with respect to temperature, humidity, vibrations and the risk of physical damage. 9

Requirements Storage : general description of the procedure the establishment will follow to comply with the manufacturers requirements for the storage of medical devices it deal with, and an attestation that it will implement and maintain this procedure. 10

-Gather all require document (eg. Location map, list of device and recall form). -Communicate with Est. to complete all missing document. Initiate a request Type of Inspection -Scheduling and scoping. -Assign inspection team. -Notified the Establishment. -Receive 2 dates. -Confirm one date -Receive confirmed date. -Print checklist. -Conduct inspection. -Add evidence. Prepare inspection report including findings Submit to Assessment Requester Document review section Inspectors Establishment High level establishment inspection process map 11

Communicate findings to establishment and request a Corrective Action Plan 12 Receive and assess follow-up inspection findings Compliance Assessment Department Establishment Receive inspection findings Assess inspection findings High level Establishment Compliance Assessment process map Submit Corrective Action Plan to SFDA Communicate findings to establishment and request a Corrective Action Plan Request follow- up inspection to confirm implementation of corrective actions Close case Request enforcement actions if establishment fails to implement corrective actions

Non Compliances Risk Classification Risk classificationCriteria Sever An observation describing a situation that poses or may have the potential to result a tangible risk to public health Moderate An observation related to the failure of an establishment to meet the requirements of SFDA related to medical devices storage, transportation..etc. Indirectly linked to a risk to public health. Minor Not related to public health risk but related to a deviation from the SFDA regulation

Establishment Compliance Process system (ECP) ECP is an electronic system which integrated with the MDS electronic systems such as MDNR and MDEL in order to allow inspectors to pull out information and documents needed for the inspection. Objectives: Tasks Automation Compliance history data base Improve efficiency and monitor performance using KPIs.

Establishment Compliance Process system (ECP) ECP is an electronic system which integrated with the MDS electronic systems to allow inspectors to pull out information and documents needed for the inspection. Notification received by Establishment

Flow Chart of ECP

Major reasons for non-compliances: Establishments storage conditions does not meet their products manufacturers requirements. Establishments incapability to identify the status of their products and to track them through the supply chain. Insufficient qualification of the establishments staff. Establishments not updating their MDEL & MDNR information Improper dealing with medical devices incidents & recalls. Inadequate transportation of medical devices. 17

Counterfeit Medical Devices & Products Manufacturing counterfeit medical products. Supplying, offering to supply or trafficking in counterfeit medical products. Falsifying documents. 18

Medical Devices Anti- counterfeiting 19

Ports of Entry Medical Devices are inspected at the following ports of entry:

Objective of POE inspection It is a vital protection against the importation of unlicensed, defective or counterfeited medical devices. Working in collaboration with importers, customs brokers and Saudi Customs. the process provides consistent, efficient, and effective controls in relation to medical devices imported via land, sea and air. 21

Ensure the submitted documents complies with relevant provisions of SFDA. Ensure the importers are registered in (MDNR). Ensure the importers have obtained (MDEL) license. Ensure the imported medical device has obtained ( MDMA). Ensure there is no recall on the imported Medical Devices. Perform a random Sampling of imported MDs for Inspection. POE Responsibilities

Reasons for rejecting shipments at ports of entry: Devices do not meet National requirements with respect to the electrical frequency. Shipping temperature does not meet manufacturer requirements. Absence of temperature indicator/monitor for IVDs shipments. Absence of information about the country of origin. Absence of expiry dates and lot/batch number on IVD shipment invoices. Physical damage to shipped devices. Rejected Shipments at POEs

24 Cleared shipment in 2010 Total Non Medical IVDs IVDsMDs 13, ,0249,343 No. of cleared shipments 4,194,407,65118,699,006927,624,9443,248,083,701 Value of cleared items Rejected shipment in 2010 Total Non Medical IVDs IVDsMDs No. of rejected shipments 20,318,45420,59312,864,0117,433,850 Value of rejected items

25 Total Non Medical IVDs IVDsMDs 2,4327 1,1711,254 No. of cleared shipments 714,544,991912,064317,945,934395,686,993 Value of cleared items Total Non Medical IVDs IVDsMDs No. of rejected shipments 2,968,50102,164,887803,614 Value of rejected items Cleared shipment in 1st quarter of 2011 Rejected shipment in 1st quarter of 2011

26 Total Non Medical IVDs IVDsMDs 2, ,1481,457 No. of cleared shipments 944,540,6833,148,929429,676,126511,715,628 Value of cleared items Total Non Medical IVDs IVDsMDs No. of rejected shipments 3,121,48302,041,4931,079,990 Value of rejected items Cleared shipment in 2nd quarter of 2011 Rejected shipment in 2nd quarter of 2011

27 Total Non Medical IVDs IVDsMDs 2, ,185 No. of cleared shipments 1,329,336,5951,881,831257,779,5001,069,675,264 Value of cleared items Total Non Medical IVDs IVDsMDs No. of rejected shipments 10,025,34336,3766,070,7413,918,226 Value of rejected items Cleared shipment in 3rd quarter of 2011 Rejected shipment in 3rd quarter of 2011

28 Cleared Shipment 2,988,422,269 SR

29 Rejected Shipment 16,115,327 SR

Packing Problems

Labeling Problems

37

38 Thank you